1 |
Ha, C. S. (2013). Development of Automated Quantity Take off Algorithm for Irregularly Shaped Structures Basedon Surfac eModelina Construction Project, Masters Thesis, Kyeong- Sang University, pp. 12-13.
|
2 |
Han, J. H., Nam, S. H. (2011). A Study on the Automated Estimating Systemusing BIM based Library, Journal of the Architecture Institute of Korea, pp. 1-6.
|
3 |
Jung, G. Y., Woo, J. W., Gang, G. D., Shin, J. C. (2013). Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume, Journal of the BIM Association of Korea, pp. 2-4.
|
4 |
Hwang, H. S., Lee, J. H. (2017). BIM based Quantity and Price Automation Estimate Method, Journal of the BIM Association of Korea, pp. 2-3.
|
5 |
Hwang, H. S., Lee, J. H., Lee, S. W. (2013). Hybrid BIM Based Automation Solution For Quantity(QBS:Quantity Breakdown System) and Price(EBS:Event Breakdown System), Journal of the BIM Association of Korea, pp. 1-2.
|