• 제목/요약/키워드: Asynchronization

검색결과 13건 처리시간 0.041초

비동기 설비 신호 상황에서의 강건한 공정 이상 감지 시스템 연구 (Robust Process Fault Detection System Under Asynchronous Time Series Data Situation)

  • 고종명;최자영;김창욱;선상준;이승준
    • 산업공학
    • /
    • 제20권3호
    • /
    • pp.288-297
    • /
    • 2007
  • Success of semiconductor/LCD industry depends on its yield and quality of product. For the purpose, FDC (Fault Detection and Classification) system is used to diagnose fault state in main manufacturing processes by monitoring time series data collected by equipment sensors which represent various conditions of the equipment. The data set is segmented at the start and end of each product lot processing by a trigger event module. However, in practice, segmented sensor data usually have the features of data asynchronization such as different start points, end points, and data lengths. Due to the asynchronization problem, false alarm (type I error) and missed alarm (type II error) occur frequently. In this paper, we propose a robust process fault detection system by integrating a process event detection method and a similarity measuring method based on dynamic time warping algorithm. An experiment shows that the proposed system is able to recognize abnormal condition correctly under the asynchronous data situation.

혁신주기, 투자주기 그리고 경기변동에 관한 실증분석 (An Empirical Analysis on the Relationship among Innovation Cycle, Investment Cycle and Business Cycle in Frequency Domain)

  • 조상섭;이장우
    • 기술혁신학회지
    • /
    • 제5권2호
    • /
    • pp.129-140
    • /
    • 2002
  • This study is try to do the empirical tests on the relationship among innovation cycle, investment cycle, and business cycle suggested in recent economic growth models. We apply co-spectra analysis to estimate dynamic correlations in the extraction HP filtered variables and first difference filtered variables in our data set. Our empirical results are; (i) an existing asynchronization between innovation cycle and investment cycle, (ii) in the long frequency, an existing positive correlation between innovation cycle and business cycle, (iii) in the short frequency, however, a finding the high negative correlation between the two cycle. Our empirical findings support the recent growth through cycle models and suggest some economic policy implementations for economic stabilization during a severe business cycle.

  • PDF

이더넷 전송장치에 있어서 최대 전송속도에서의 비동기로 인한 패킷손실 개선 (Reducing the Packet Loss Due to Asynchronization At the Maximum Link Speed Between Ethernet Transmission Systems)

  • 안정균;김성수;권용식;엄종훈
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 한국정보통신설비학회 2008년도 정보통신설비 학술대회
    • /
    • pp.579-583
    • /
    • 2008
  • 본 논문은 이더넷이 비동기식으로 전송됨으로 인해, 동일한 전송속도를 가진 장비라 할지라도 링크가 제공하는 명목상의 최대속도로 전송될 경우, 상호 접속한 장비간의 전송클럭 차이로 인해 프레임의 손실이 발생한다. 본 논문에서는 PHY에서 복원된 수신 클럭과 송신 클럭의 차이를 비교하고 동시에 프레임버퍼에 쌓인 큐를 참조하여 프레임 손실이 방생할 수 있는 임계치를 넘어설 경우, 전송프레임의 프리엠블 길이를 조정함으로써 이더넷 장비에서 전송클럭의 차이로 인한 프레임손실을 줄일 수 있음을 확인하였다.

  • PDF

임피던스 계전기를 이용한 발전기 비동기 투입 보호 연구 (A Study on Protection of Generator Asynchronization by Impedance Relaying)

  • 이종훤
    • 전기학회논문지
    • /
    • 제60권11호
    • /
    • pp.2000-2006
    • /
    • 2011
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. Where calculation method of protection settings and Logic for Protection of Generator Asynchronization will be recommended, A distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, Zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection this paper describes an improved backup protection coordination scheme using a new Logic that will be suggested.

Profibus-DP에서의 Feedback 제어시스템 구축 (Implementation of Feedback Control System in Profibus-DP)

  • 강송;이경창;이석
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.58-58
    • /
    • 2000
  • As many sensors and actuators are used in various automated systems, the application of network system to real-time distributed control is gaining acceptance in many industries. In order to take advantages of the network technique. however, network implementation should be carefully designed to satisfy real-time constraints and to consider network delays. This paper presents the implementation of feedback control system in Profibus-DP. Profibus-DP is a type of fieldbus protocols that are specifically designed to interconnect simple devices with fast I/O data exchange. As feedback control in profibus-DP is implemented, Network delays is found with influence of system performance. We analyze network delays in Profibus-DP into 3 reasons - dead time in Profibus interface, protocol delay, delay by asynchronization. In order to compensate the network delays, we introduce control algorithms with time delay concept. The results show that network delay can be compensated.

  • PDF

3상 AC/DC/AC PWM 컨버터의 직류링크 리플전류의 주파수 영역 해석 (Spectral Analysis of DC Link Ripple Currents in Three-Phase AC/DC/AC PWM Converters)

  • 이동춘;박영욱;석줄기
    • 전력전자학회논문지
    • /
    • 제7권3호
    • /
    • pp.244-252
    • /
    • 2002
  • 본 논문에서는 가변속 교류 전동기 구동에 많이 사용되는 3상 ac/dc/ac PWM 컨버터 시스템에서의 직류링크 리플전류를 주파수 영역에서 해석하고자 한다. 고조파 전류는 컨버터의 스위칭함수와 지수함수 형태의 퓨리에 급수 전개를 이용하여 분석된다. 전원측 컨버터와 부하측 인버터의 스위칭 주기간의 변위각과 비동기 PW이 리플전류에 미치는 영향도 고찰된다. 해석 결과가 PSIM을 이용한 시뮬레이션으로부터 나온 고조파 스펙트럼과 잘 일치함을 확인한다 제시된 해석기법은 PWM의 원리에 대한 이해를 돕고, 해석 결과는 직류링크 커패시터의 고주파 등가 모델링에 이용된다.

유비쿼터스 협업을 위한 스마트폰 환경에서의 인터랙티브 화이트보드 (An Interactive Whiteboard on Smart Phones for Ubiquitous Collaboration)

  • 하원정;김강석;예홍진
    • 한국정보처리학회:학술대회논문집
    • /
    • 한국정보처리학회 2011년도 추계학술발표대회
    • /
    • pp.151-154
    • /
    • 2011
  • 유비쿼터스 협업 (Ubiquitous Collaboration)은 유비쿼터스 환경에서 다양한 이기종 디바이스 (PC, Tablet PC, Smart Phone, etc)들이 유무선망을 통해 언제 어디서나 원하는 서비스를 주고 받을 수 있는 시스템으로 시간과 장소에 상관없이 다양한 데이터를 주고 받을 수 있다. 스마트폰의 보편화, 하드웨어 / 소프트웨어 그리고 무선망의 진화로 협업의 중요성은 점점 증가하고 있다. 본 연구에서는 스마트폰 환경에서 이미지, 도형, 텍스트 등의 도구를 사용 협업하는 인터랙티브 화이트보드 어플리케이션(Interactive Whiteboard Application on Smart Phone)을 사용하여 다양한 환경의 사용자들이 서로 다른 이기종 디바이스와 함께 통신하는 방법을 보인다. 또한 서로 다른 이기종 디바이스 간 그룹 통신에서 오는 동기화(Synchronization), 비동기화(Asynchronization), 또한 다른 화면 크기로 부터 발생되는 서로 다른 이미지 크기 표현문제를 극복하기 위한 사용성 평가실험(Usability Test)을 통하여 연구의 타당성 및 우수성을 증명해 보이고자 한다.

무선 센서 네트워크에서 다중 왕복시간차를 이용한 위치측정 (A Localization Using Multiple Round Trip Times in Wireless Sensor Networks)

  • 장상욱;하란
    • 한국정보과학회논문지:정보통신
    • /
    • 제34권5호
    • /
    • pp.370-378
    • /
    • 2007
  • 무선 센서 네트워크(WSNs)에서는 수많은 센서들이 사람이 접근하기 어려운 환경에 배치된다. 이러한 환경에서, 센서들의 절대적 또는 상대적인 위치정보를 이용함으로써 무선 센서 네트워크를 다양한 응용서비스에 이용할 수 있다. 지금까지는 센서 노드의 위치를 측정하는 방법으로 신호의 도착시간차(time-of-arrival, TOA)에 기반을 둔 방법이 가장 정확도가 높게 평가되었다. 그러나 TOA방법에서는 두 노드간에 clock skew나 clock drift가 생기면 거리오차가 발생하게 된다. 이러한 문제를 해결하기 위해서 주기적인 시간동기화 기법들이 제시되었는데, 이러한 방법에서는 거리오차를 줄일 수 있지만 시간동기화에 따른 overhead가 발생하게 된다. 본 논문에서는 이러한 clock skew가 발생하는 상황에서도 거리와 위치 정확도를 높일 수 있는 신호의 다중 왕복시간차(multiple round-trip times of arrival, RTOA)에 기반한 위치 측정 방법을 제안한다. 실험 결과, RTOA가 기존의 TOA방법보다 최대 93%의 위치 정확도 향상을 보였다.

가변 버퍼와 상호대화형 객체 삽입을 이용한 스트림 동기화 기법 (Stream Synchronization Mechanism using Variable Buffers and Insertion of Interactive Objects)

  • 이양민;이재기
    • 정보처리학회논문지B
    • /
    • 제12B권6호
    • /
    • pp.661-670
    • /
    • 2005
  • 인터넷 상에서의 멀티미디어 스트림을 제공하는 서비스가 활성화됨에 따라 서비스의 사용자도 크게 증가하였다. 이것은 네트워크 트래픽의 증가로 이어졌고, 결과적으로 스트림 재생시 불연속적인 재생과 영상 및 음원의 비동기화와 같은 문제를 발생시켰다. 이러한 문제를 해결하기 위해 안정적인 미디어 스트림의 재생을 보장하고 부가적으로 서비스 사용자와 미디어 간 상호대화를 할 수 있는 미디어 전달 방법이 필요하다. 기존의 관련 연구에서는 여러 가지 방법을 통하여 미디어간 동기화를 달성하고 있으나 상호대화라는 측면에서는 만족할 만한 해결책을 제시하지 못하고 있으며, 불연속적인 스트림의 재생에 대한 처리에도 문제점을 가지고 있다. 본 논문에서는 상호대화형 객체를 각 미디어 파일에 삽입하고, 이들 객체들이 서로의 정보를 이용할 수 있는 함수를 설계하여 동기화와 상호대화성 문제를 해결하며, 네트워크에 대한 의존성 때문에 발생하는 불연속적인 재생은 가변 버퍼를 이용함으로써 해결하였다.

스팀터빈 발전기 비동기 투입 사례연구를 통한 비동기 방지 알고리즘 개발 (Development of Asynchronous Blocking Algorithm through Asynchronous Case Study of Steam Turbine Generator)

  • 이종훤
    • 전기학회논문지
    • /
    • 제61권10호
    • /
    • pp.1542-1547
    • /
    • 2012
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. When calculation method of protection settings and logic for protection of generator asynchronization will be recommended, a distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection, this paper describes an improved backup protection coordination scheme using a new logic that will be suggested.