• Title/Summary/Keyword: Asynchronization

Search Result 13, Processing Time 0.041 seconds

Robust Process Fault Detection System Under Asynchronous Time Series Data Situation (비동기 설비 신호 상황에서의 강건한 공정 이상 감지 시스템 연구)

  • Ko, Jong-Myoung;Choi, Ja-Young;Kim, Chang-Ouk;Sun, Sang-Joon;Lee, Seung-Jun
    • IE interfaces
    • /
    • v.20 no.3
    • /
    • pp.288-297
    • /
    • 2007
  • Success of semiconductor/LCD industry depends on its yield and quality of product. For the purpose, FDC (Fault Detection and Classification) system is used to diagnose fault state in main manufacturing processes by monitoring time series data collected by equipment sensors which represent various conditions of the equipment. The data set is segmented at the start and end of each product lot processing by a trigger event module. However, in practice, segmented sensor data usually have the features of data asynchronization such as different start points, end points, and data lengths. Due to the asynchronization problem, false alarm (type I error) and missed alarm (type II error) occur frequently. In this paper, we propose a robust process fault detection system by integrating a process event detection method and a similarity measuring method based on dynamic time warping algorithm. An experiment shows that the proposed system is able to recognize abnormal condition correctly under the asynchronous data situation.

An Empirical Analysis on the Relationship among Innovation Cycle, Investment Cycle and Business Cycle in Frequency Domain (혁신주기, 투자주기 그리고 경기변동에 관한 실증분석)

  • 조상섭;이장우
    • Journal of Korea Technology Innovation Society
    • /
    • v.5 no.2
    • /
    • pp.129-140
    • /
    • 2002
  • This study is try to do the empirical tests on the relationship among innovation cycle, investment cycle, and business cycle suggested in recent economic growth models. We apply co-spectra analysis to estimate dynamic correlations in the extraction HP filtered variables and first difference filtered variables in our data set. Our empirical results are; (i) an existing asynchronization between innovation cycle and investment cycle, (ii) in the long frequency, an existing positive correlation between innovation cycle and business cycle, (iii) in the short frequency, however, a finding the high negative correlation between the two cycle. Our empirical findings support the recent growth through cycle models and suggest some economic policy implementations for economic stabilization during a severe business cycle.

  • PDF

Reducing the Packet Loss Due to Asynchronization At the Maximum Link Speed Between Ethernet Transmission Systems (이더넷 전송장치에 있어서 최대 전송속도에서의 비동기로 인한 패킷손실 개선)

  • Ahn, Jeong-Gyun;Kim, Sung-Su;Kwon, Yong-Sik;Eum, Jong-Hun
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2008.08a
    • /
    • pp.579-583
    • /
    • 2008
  • 본 논문은 이더넷이 비동기식으로 전송됨으로 인해, 동일한 전송속도를 가진 장비라 할지라도 링크가 제공하는 명목상의 최대속도로 전송될 경우, 상호 접속한 장비간의 전송클럭 차이로 인해 프레임의 손실이 발생한다. 본 논문에서는 PHY에서 복원된 수신 클럭과 송신 클럭의 차이를 비교하고 동시에 프레임버퍼에 쌓인 큐를 참조하여 프레임 손실이 방생할 수 있는 임계치를 넘어설 경우, 전송프레임의 프리엠블 길이를 조정함으로써 이더넷 장비에서 전송클럭의 차이로 인한 프레임손실을 줄일 수 있음을 확인하였다.

  • PDF

A Study on Protection of Generator Asynchronization by Impedance Relaying (임피던스 계전기를 이용한 발전기 비동기 투입 보호 연구)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2000-2006
    • /
    • 2011
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. Where calculation method of protection settings and Logic for Protection of Generator Asynchronization will be recommended, A distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, Zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection this paper describes an improved backup protection coordination scheme using a new Logic that will be suggested.

Implementation of Feedback Control System in Profibus-DP (Profibus-DP에서의 Feedback 제어시스템 구축)

  • Kang, Song;Lee, Kyung-Chang;Lee, Seok
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.58-58
    • /
    • 2000
  • As many sensors and actuators are used in various automated systems, the application of network system to real-time distributed control is gaining acceptance in many industries. In order to take advantages of the network technique. however, network implementation should be carefully designed to satisfy real-time constraints and to consider network delays. This paper presents the implementation of feedback control system in Profibus-DP. Profibus-DP is a type of fieldbus protocols that are specifically designed to interconnect simple devices with fast I/O data exchange. As feedback control in profibus-DP is implemented, Network delays is found with influence of system performance. We analyze network delays in Profibus-DP into 3 reasons - dead time in Profibus interface, protocol delay, delay by asynchronization. In order to compensate the network delays, we introduce control algorithms with time delay concept. The results show that network delay can be compensated.

  • PDF

Spectral Analysis of DC Link Ripple Currents in Three-Phase AC/DC/AC PWM Converters (3상 AC/DC/AC PWM 컨버터의 직류링크 리플전류의 주파수 영역 해석)

  • 이동춘;박영욱;석줄기
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.7 no.3
    • /
    • pp.244-252
    • /
    • 2002
  • In this paper, do link ripple currents for three-phase ac/dc/ac PWM converters feeding adjustable speed ac machine drives are analysed in a frequency domain. The expression of the harmonic currents is developed by using switching functions of the converter and exponential courier series expansion. The effect of the displacement angle between the switching Periods of line-side converters and motor-side inverters on the dc link ripple currents is Investigated. Also, the influence of asynchronization of PWM is observed. The result of analysis is compared with frequency spectrum which results from PSIM simulation. The proposed analysis technique is useful to understand the principles of P% and to derive an equivalent model of the dc link capacitors in a high frequency range.

An Interactive Whiteboard on Smart Phones for Ubiquitous Collaboration (유비쿼터스 협업을 위한 스마트폰 환경에서의 인터랙티브 화이트보드)

  • Ha, Wonjeong;Kim, Kangseok;Yeh, Hongjin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.151-154
    • /
    • 2011
  • 유비쿼터스 협업 (Ubiquitous Collaboration)은 유비쿼터스 환경에서 다양한 이기종 디바이스 (PC, Tablet PC, Smart Phone, etc)들이 유무선망을 통해 언제 어디서나 원하는 서비스를 주고 받을 수 있는 시스템으로 시간과 장소에 상관없이 다양한 데이터를 주고 받을 수 있다. 스마트폰의 보편화, 하드웨어 / 소프트웨어 그리고 무선망의 진화로 협업의 중요성은 점점 증가하고 있다. 본 연구에서는 스마트폰 환경에서 이미지, 도형, 텍스트 등의 도구를 사용 협업하는 인터랙티브 화이트보드 어플리케이션(Interactive Whiteboard Application on Smart Phone)을 사용하여 다양한 환경의 사용자들이 서로 다른 이기종 디바이스와 함께 통신하는 방법을 보인다. 또한 서로 다른 이기종 디바이스 간 그룹 통신에서 오는 동기화(Synchronization), 비동기화(Asynchronization), 또한 다른 화면 크기로 부터 발생되는 서로 다른 이미지 크기 표현문제를 극복하기 위한 사용성 평가실험(Usability Test)을 통하여 연구의 타당성 및 우수성을 증명해 보이고자 한다.

A Localization Using Multiple Round Trip Times in Wireless Sensor Networks (무선 센서 네트워크에서 다중 왕복시간차를 이용한 위치측정)

  • Jang, Sang-Wook;Ha, Rhan
    • Journal of KIISE:Information Networking
    • /
    • v.34 no.5
    • /
    • pp.370-378
    • /
    • 2007
  • In wireless sensor networks (WSNs), thousands of sensors are often deployed in a hostile environment. In such an environment, WSNs can be applied to various applications by using the absolute or relative location information of the sensors. Until now, the time-of-arrival (TOA) based localization method has been considered most accurate. In the TOA method, however, inaccuracy in distance estimation is caused by clock drift and clock skew between sensor nodes. To solve this problem, several numbers of periodic time synchronization methods were suggested while these methods introduced overheads to the packet traffic. In this paper, we propose a new localization method based on multiple round-trip times (RTOA) of a signal which gives more accurate distance and location estimation even in the presence of clock skew between sensor nodes. Our experimental results show that the Proposed RTOA method gives up to 93% more accurate location estimation.

Stream Synchronization Mechanism using Variable Buffers and Insertion of Interactive Objects (가변 버퍼와 상호대화형 객체 삽입을 이용한 스트림 동기화 기법)

  • Lee, Yang-Min;Lee, Jae-Kee
    • The KIPS Transactions:PartB
    • /
    • v.12B no.6 s.102
    • /
    • pp.661-670
    • /
    • 2005
  • According as services that offer multimedia streams are activated on the Internet, users who use these services we increased extremely. As a result of this, the increase of network traffic was occurred. Also it caused the problems such as the discontinuous playback in case of the s#ream playback and the asynchronization between a video and an audio. To solve these problems, it needs a method that guarantee the stable playback of media streams and a method of media transfer that can interact between a service user and media. Existing related researches has achieved the synchronization through various methods, but did not shown the results of satisfaction in the aspect of interaction. In this paper, we inserted the interactive objects in each media file, designed functions that these objects can use each other's information, and solved the interaction and the synchronization between a video and an audio. Also, we solved the discontinuous playback of a stream by the insufficiency of network bandwidth through using variable buffers.

Development of Asynchronous Blocking Algorithm through Asynchronous Case Study of Steam Turbine Generator (스팀터빈 발전기 비동기 투입 사례연구를 통한 비동기 방지 알고리즘 개발)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.10
    • /
    • pp.1542-1547
    • /
    • 2012
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. When calculation method of protection settings and logic for protection of generator asynchronization will be recommended, a distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection, this paper describes an improved backup protection coordination scheme using a new logic that will be suggested.