• Title/Summary/Keyword: Architecture Productivity

Search Result 388, Processing Time 0.021 seconds

Development of a Work Environment Monitoring System for Improving HSE and Production Information Management Within a Shipyard Based on Wireless Communication (무선 통신 기반 조선소 내 HSE 및 생산정보 관리 향상을 위한 작업환경 모니터링 시스템 개발)

  • Chunsik Shim;Jaeseon Yum;Kangho Kim;Daseul Jeong;Hwanseok Gim;Donggeon Kim;Donghyun Lee;Yerin Cho;Byeonghwa Kim
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.60 no.5
    • /
    • pp.367-374
    • /
    • 2023
  • As the Fourth Industrial Revolution accelerating, countries worldwide are developing technologies to digitize and automate various industrial sectors. Building smart factories not only reduces costs through improved process productivity but also allows for preemptive identification and removal of risk factors through the practice of Health, Safety, and Environment (HSE) management, thereby reducing industrial accident risks. In this study, we visualized pressure, temperature, power, and wind speed data measured in real-time via a monitoring GUI, enabling field managers and workers to easily access related information. Through the work environment monitoring system developed in this study, it is possible to conduct economic analysis on per-unit basis, based on the digitization of production management elements and the tracking of required resources. By implementing HSE in shipyards, potential risk factors can be improved, and gas and electrical leaks can be identified, which are expected to reduce production costs.

Framework for Developing Mobile Embedded Convergence Software using CBD (컴포넌트 기반 모바일 임베디드 컨버전스 소프트웨어 개발 프레임워크)

  • Kim, Haeng-Kon
    • Journal of Internet Computing and Services
    • /
    • v.9 no.5
    • /
    • pp.59-72
    • /
    • 2008
  • Computing systems in the modern era are expanding rapidly to include mobile-based businesses that make us of the various convergence distributed business process. This has lead to growing interest in the field of mobile embedded software development methodology, which has in turn lead to the proliferation of the embedded mobility. The use of CBD (Component Based Development) provides reusability, maintainability and portability, all of which are very important and focus issues to the business process. It also comes with the inherent productivity, quality and reliability of CBD. To make efficient use of CBD, though, clarified interface definitions for component integration are necessary. These definitions should be made up of collaborative hierarchical and horizontal architecture layers. Successful definitions should apply an effective framework made up of the architecture and process. In this paper, we describe an interface specification for small grained mobile embedded components(MEC) for the mobile embedded domain to meet maximum user requirements. We build and deploy the reconfigurable design patterns and components (in business domain categories) to make a component hierarchy and business logics for mobile embedded software. Proposed components specification plays a major role in development of the software for handling inconsistency in existing specification. It also includes plenty of specification information, using semantics and modeling based mechanisms to support business processes. We propose a development model of mobile embedded software using CBD for very complex and dynamic mobile business. We can apply it in a plug and play manner to develop the software. We verify that our framework supports very good productivity, quality and maintainability to meet the user's requirements in mobile business.

  • PDF

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

A Study for Automated Division of Composite Walls for Quantity Take-off in Construction Document Phase (실시설계단계에서 수량산출을 위한 복합벽체 자동분할에 관한 연구)

  • Park, Seunghwa;Kim, Heungsoo;Yoon, Dooyung
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.124-132
    • /
    • 2015
  • When Building Information Modeling (BIM) was introduced at the early stage, it was only utilized as a three-dimensional visualization tool. Nowadays, however, BIM is being studied for increasing design productivity and managing enormous information on building life cycle. One of the representative research is developing 'common prototype BIM libraries'. BIM data made of common prototype libraries should be utilized in various ways, quantity takeoff, code checking, energy analysis and so on. However, common prototype BIM libraries are not enough to estimate accurate cost. For example, composite wall libraries should be divided into several single objects, wall structure and finishes, for the quantity takeoff and construction cost calculation. In this paper, we are suggesting an automated division algorithm of composite wall and developing a system prototype for it. This study is expected to reduce extra modeling work and contribute to fast and accurate cost calculation in the construction.

Design and Implementation of JPetStore Order System Based Mobile WebApp Office (모바일 웹앱 오피스 기반의 JPetStore 주문시스템의 설계 및 구현)

  • Lee, Myeong-Ho;Han, Jung-Su
    • Journal of Digital Convergence
    • /
    • v.10 no.3
    • /
    • pp.149-154
    • /
    • 2012
  • This paper aims to design and realize android smartphone mobile webapp office JPetStore order system based Seam framework. Currently in production until the lightweight container architecture, known commonly architecture is Seam framework. However, there is no design and implementation research of mobile webapp office with the Seam framework environment. In this study, the Seam environment based on the android mobile webapp office JPetStore order system implementation after analyzing the mobile webapp office development productivity with the objective is to provide guidance.

A study on the non-integrated use of BlM (비통합적 BlM의 적용 가능성에 관한 연구)

  • Choi, Jong-Chon;Kim, Khil-Chae
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.8 no.2
    • /
    • pp.21-28
    • /
    • 2008
  • The main purpose of this paper is to find the phase-in of BIM adoption by focusing on the level of integration. BlM should be aimed at integration and collaboration of all parties furnishing design and construction services to increase the productivity. Therefore, the degree and depth of integration for project collaboration is very important to BlM design process. One of the key advantages of full integration is that is to facilitates the development of detailed information much earlier in the entire design process to improve collaboration among stakeholders. Such integrated use is the ultimate method, but even so, it's not the precondition of BlM. One of the key advantages of relatively low integration as a transition phase is to adopt the BlM earlier than full integration. Such transitional and non-integrated BIM can also reduce the possibility of trial and error in BlM adoption. Therefore, this paper focused on non-integrated use of BlM as a substitute of full IPD by analyzing obstacles in BIM adoption.

  • PDF

Development of Data Warehouse Systems to Support Cost Analysis in the Ship Production (조선산업의 비용분석 데이터 웨어하우스 시스템 개발)

  • Hwang, Sung-Ryong;Kim, Jae-Gyun;Jang, Gil-Sang
    • IE interfaces
    • /
    • v.15 no.2
    • /
    • pp.159-171
    • /
    • 2002
  • Data Warehouses integrate data from multiple heterogeneous information sources and transform them into a multidimensional representation for decision support applications. Data warehousing has emerged as one of the most powerful tools in delivering information to users. Most previous researches have focused on marketing, customer service, financing, and insurance industry. Further, relatively less research has been done on data warehouse systems in the complex manufacturing industry such as ship production, which is characterized complex product structures and production processes. In the ship production, data warehouse systems is a requisite for effective cost analysis because collecting and analysis of diverse and large of cost-related(material/production cost, productivity) data in its operational systems, was becoming increasingly cumbersome and time consuming. This paper proposes architecture of the data warehouse systems to support cost analysis in the ship production. Also, in order to illustrate the usefulness of the proposed architecture, the prototype system is designed and implemented with the object of the enterprise of producing a large-scale ship.

Optimum Structural Design of Panel Block Considering the Productivity (생산성을 고려한 평블록의 최적 구조 설계)

  • Lee, Joo-Sung;Kim, Jong-Mun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.44 no.2 s.152
    • /
    • pp.139-147
    • /
    • 2007
  • The ultimate goal of structural design is to find the optimal design results which satisfies both safety and economy at the same time. Optimum design has been studied for the last several decades and is being studied. in this study, an optimum algorithm which is based on the genetic algorithm has been applied to the multi-object problem to obtain the optimum solutions which minimizes structural weight and construction cost of panel blocks in ship structures at the same time. Mathematical problems are dealt at first to justify the reliability of the present optimum algorithm. And then the present method has been applied to the panel block model which can be found in ship structures. From the present findings it has been seen that the present optimum algorithm can reasonably give the optimum design results.

A Study for Improvement of Work using Digital Human Modeling (디지털 휴먼 모델링 도구를 이용한 작업 개선에 관한 연구)

  • Kim, Dong-Joon;Park, Ju-Yong;Kim, Hyun-Woo;Chang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.2
    • /
    • pp.51-56
    • /
    • 2008
  • In these days, work-related musculoskeletal disorders(WMSDs) is one of the issues in the shipbuilding industry. As the number of injured workers and demands for worker's compensation have rapidly increased, improvement of work conditions and environments to prevent WMSDs has been more demanded. To reduce WMSDs' hazards in the shipbuilding industry, simulation technique which showed it's ability of increasing the manufacturing productivity was applied, because simulation technique has the evaluation ability for a worker's danger level of production process by RULA(Rapid Upper Limb Assesment). In this research, worker's altitude had modeled and worker's action has simulated. After the caution level was evaluated, we pointed out clues which had high workload. To reduce work-load, we applied ergonomic principles for improving working conditions and environments. Improved working conditions and environments were simulated using human modelling and simulation and their workload were evaluated again.

Research on Housing Conditions of the Vulnerable in Rural Area - With Focus on the Cases of Jincheon-eup and Baebok-myeon, Jincheon-gun, Chungbuk - (농촌지역 취약계층 주거실태 조사연구 - 충북 진천군 진천읍·백곡면 사례를 중심으로 -)

  • Kim, Seung-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.4
    • /
    • pp.1-8
    • /
    • 2011
  • Korea is moving toward an aging society faster than the other advance countries such as the U.S. and France. Such aging phenomena are posing greater problems in rural areas than in urban areas, and particularly, decrease in productivity caused by aging population leads to economic difficulties and hinders the improvement of housing life. The purpose of this research is to examine and identify the housing conditions of the vulnerable in rural areas and to present ways to improve the elderly housing and the housing environment in rural areas and to provide basic data for materializing the policies to enhance the quality of life. The results of this research are as follows. First, the elderly in rural areas were found to receive relatively smooth supports for services related to clothing and food through the government and social organizations. But for the housing problems, it was found that there were not any supports. Second, the poor housing environment may cause diseases to the elderly with weak immunity, so ways to remedy these problems are urgently needed. Third, the vulnerable in rural areas can hardly bear the burden of improving the housing environment, so supports from the government and social organizations are needed. Fourth, ways to support the vulnerable such as households receiving basic living subsidies and to support the poor who are not receiving such subsidies should be explored.