Journal of The Korean Digital Architecture Interior Association (한국디지털건축인테리어학회논문집)
- Volume 8 Issue 2
- /
- Pages.21-28
- /
- 2008
- /
- 1738-0790(pISSN)
A study on the non-integrated use of BlM
비통합적 BlM의 적용 가능성에 관한 연구
Abstract
The main purpose of this paper is to find the phase-in of BIM adoption by focusing on the level of integration. BlM should be aimed at integration and collaboration of all parties furnishing design and construction services to increase the productivity. Therefore, the degree and depth of integration for project collaboration is very important to BlM design process. One of the key advantages of full integration is that is to facilitates the development of detailed information much earlier in the entire design process to improve collaboration among stakeholders. Such integrated use is the ultimate method, but even so, it's not the precondition of BlM. One of the key advantages of relatively low integration as a transition phase is to adopt the BlM earlier than full integration. Such transitional and non-integrated BIM can also reduce the possibility of trial and error in BlM adoption. Therefore, this paper focused on non-integrated use of BlM as a substitute of full IPD by analyzing obstacles in BIM adoption.
Keywords