• Title/Summary/Keyword: Apartment Construction Project

Search Result 269, Processing Time 0.034 seconds

Analysis of the Impact of Construction Planning Tasks on Project Cost and Schedule Success in Residential Projects (공동주택 설비공사 계획업무의 성과지표에 미치는 영향분석)

  • Kim, Dae Young;Lim, Hyoungchul;Kim, Daeyoung;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.31-38
    • /
    • 2019
  • The main purpose of this study is to analyze the impact of the cost estimates on the construction work in residential apartment housing facilities. The planning work of facility construction is roughly divided into five main tasks which are further broken down into the following: process plan (P1-P6), construction plan (C1-C5), environmental management plan (E1-E4), quality management plan (Q1-Q5) and the safety management plan (S1-S5). In this study these tasks were classified into 25 detailed planning duties and a statistical analysis was performed on each one to determine its impact on cost. Finally this study derives from major planning tasks for effective cost management through correlation between planning tasks, cost indicators and t-test.

A Study on the Method of Preliminary Works Management for a Schedule Performance Management (공정이행관리를 위한 선행작업관리 시안)

  • Park, Hong-Tae;Song, Young-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.3
    • /
    • pp.757-764
    • /
    • 2008
  • It is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the qualify and schedule management of the construction, We can make systematically preliminary works in accordance with construction schedule by the architecture construction items of the apartment house construction. We suggested important preliminary control item by the workers through experiential method of construction engineers in accordance with network schedule. should not use "we" in technical sentence.

A Feasibility and Survey Study on the Hanok housing complex project within Seoul Metropolitan Area (수요자 설문조사 및 사업성분석을 통한 수도권 신도시 내 한옥단지 조성사업 타당성 검토)

  • Kim, Yong-Soo
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.14 no.3
    • /
    • pp.101-108
    • /
    • 2012
  • The purpose of this study was to set and analyze the feasibility and survey of the Hanok(The traditional Korean style house) housing complex project within Seoul metropolitan area. The results of this study were as follows. First of all, a survey was carried out to find out the optimum Hanok style. The survey showed that many people chose a frond and back yard garden as a merit of Hanok and pointed out the weak crime prevention as a weakness of Hanok. The optimum size for a Hanok was from $264m^2$ to $330m^2$ and living space was from $100m^2$ to $132m^2$. And people considered about 120% of what the apartment sells for as the reasonable price of a Hanok. Based on the survey, this study planned a Hanok housing complex on a lot that has competitive price and analysed the feasibility of the housing plan. The result was that Hanok's construction cost per $3.3m^2$ to be a marketable product has to be below about 6 million Won. As a result, the construction cost-saving through the advanced technology and planning to meet the changing customers' needs are needed to vitalize Hanok's supply.

Residents' Perception on Living Environment in Metropolitan Area - The Case of Daegu Metropolitan City - (대도시 서민 주거지 환경실태와 주민의식 - 대구시 일부 지역을 대상으로 -)

  • Kim, Han-Su;Jang, Mong-Hyun
    • Journal of the Korean housing association
    • /
    • v.22 no.4
    • /
    • pp.113-120
    • /
    • 2011
  • The primary purpose of this study is to suggest policy directions for redevelopment project based on analysis of residents' perception on needs and reasons of redevelopment, and development type in old settlements in Daegu Metropolitan City. The main findings are follows. First, the study area is short of public space such as road and parks, occupied by old single detached houses with small parcel. The living environment of the area consist with many 20 years or older two story houses is very poor. Second, most of residents (58.5%) consider economic factors or cheaper rent more serious than other factors such as convenience, amenity, and education facilities. Third, residents want new housing construction even though explanatory power of trash collection, bad smells, privacy is very high in residents' satisfaction. Fourth, most of residents (88.8%) agree redevelopment and show strong preference to high-density apartment construction through demolish-and-development type of redevelopment approach. They are willing to agree the parcellevel redevelopment if governments provides economic supports and temporary settlements. This finding suggests very important policy implications for current government efforts to improve living environment.

Domestic Remodeling Business Status and Improvement Strategy (국내 리모델링 사업현황과 개선전략)

  • Chung Tae-Hun;Lim Ho-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.82-87
    • /
    • 2003
  • Domestic remodeling market is now growing centering around non housing building. Unlike non housing building remodeling business, understanding of remodeling demanders accustomed to profit of reconstruction, deficiency of experience performing remodeling project and construction, shortage of will performing remodeling policy and detailed action method are difficulties in performing apartment building remodeling business. Understanding change of remodeling demanders. strong economic incentive by government, construction management paradigm shift from new construction into building life cycle, application of construction method using existing building condition before remodeling and remodeling related industry infrastructure are required to improve this remodeling business circumstances.

  • PDF

A Study on Necessity of Applying of BIM for Maintenance of the Long-Life Housing (장수명 공동주택 유지관리를 위한 BIM 적용 필요성에 관한 연구)

  • Kwon, Dae-Geun;Shim, Un-Jun;Ahn, Yong-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.108-109
    • /
    • 2013
  • To join in the global trend toward the green growth, the government has chosen the technical development of a long-life housing as a national project and has been working on it. However, a research on its maintenance has been insufficient. Therefore, in order to come up with and support the systematic maintenance of long-life housing, I suggest the need for application of BIM by comparing and analyzing an apartment house and a long-life housing.

  • PDF

IMPROVEMENT OF TACT SCHEDULE MANAGEMENT PROCESS FOR THE FINISH WORK OF APARTMENT HOUSES

  • Joo-Young Jung;Sang-Ho Yoon;Kyung-Kook Lee;Chang-Gyo Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.554-562
    • /
    • 2007
  • This study determined tact process paths by separating the finish works according to the properties of work areas and work relations in order to apply the tact schedule management to the finish works. In addition, by suggesting preparing and sharing the workflow charts, the experiments can be shared between the executors and any possible frictions between the specialist works can be identified in advance. In addition, any errors on the plan can be reviewed and modified through the measurement stage of tact plan attainment rate. The process of tact schedule management is improved with such tools and methods and the efficiency of the process through the application of cases was verified.

  • PDF

Forecasting Housing Demand with Big Data

  • Kim, Han Been;Kim, Seong Do;Song, Su Jin;Shin, Do Hyoung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.44-48
    • /
    • 2015
  • Housing price is a key indicator of housing demand. Actual Transaction Price Index of Apartment (ATPIA) released by Korea Appraisal Board is useful to understand the current level of housing price, but it does not forecast future prices. Big data such as the frequency of internet search queries is more accessible and faster than ever. Forecasting future housing demand through big data will be very helpful in housing market. The objective of this study is to develop a forecasting model of ATPIA as a part of forecasting housing demand. For forecasting, a concept of time shift was applied in the model. As a result, the forecasting model with the time shift of 5 months shows the highest coefficient of determination, thus selected as the optimal model. The mean error rate is 2.95% which is a quite promising result.

  • PDF

A Study on the Evaluation Method of Structural Safety(Durability) for the Safety Diagnosis of Apartment Housing (공동주택 재건축 안전진단 구조안전성(내구성) 평가 방법에 관한 고찰)

  • Kim, Hong-Seop;Kim, Eun-Young;Jeon, Jun-Seo;Choe, Gyeing-Cheol;Lee, Mun-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.313-314
    • /
    • 2023
  • This paper summarized the safety diagnosis method in the field of durability among the structural safety suggested in the safety diagnosis manual of the reconstruction project and analyzed the safety diagnosis case. It is expected to be a reference material for safety diagnosis in the field of durability by pointing out cases that are wrong during existing safety diagnosis and cases where diagnostics are likely to make errors.

  • PDF

A Process for Replacing BIM Property Information about Internal Finishing of Office Building in Design Phase (업무시설 설계단계 BIM 내부마감 속성정보 교체 프로세스)

  • Han, Ji-Ho;Nam, Dong-Hee;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.207-208
    • /
    • 2023
  • The procedure of predicting the construction cost and selecting the best alternative is performed based on comparative review of each building case. In the case of office building, it is required continuously until design is complete, since the owner requirements are various and likely to change during the design process compared to a standardized apartment. However, since the comparison work for each alternative in practice uses only the unit construction cost, there is no correlation between the alternative and the final result, and it is difficult to quantitatively determine the effect of the determined design factor on the total construction cost. It is needed that a means to support the generation of design alternatives using similar building cases during the design phase. This paper proposes a BIM-based data replacing process to support creating and comparison of design alternatives of internal finishing for office building. When design alternatives are created through the proposed process, it is possible to compare several similar cases with current project under equivalent design circumstance. Because only some finishing properties are replaced while maintaining the shape information such as the length, height, and base constraint of the object to be replaced.

  • PDF