• Title/Summary/Keyword: AVR step test

Search Result 13, Processing Time 0.027 seconds

A Study of PSs Modeling of Ulchin N/P #1 by AVR Step Test (AVR 스템시험에 의한 울진 N/P 1호기 PSS 모델링 연구)

  • 김동준;문영환;전동훈;김태균
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.8
    • /
    • pp.351-358
    • /
    • 2001
  • This paper deals with the PSS modeling of Ulchin N/P #1 as well as the generator and excitation system modeling by utilizing the recorded data from AVR step test, which has been performed by entering small voltage signal into the AVR summing point. In addition to it. two recorded results obtained from the AVR step test with PSS sunning and without PSS running have not only been compared each other on the time domain, but also they heve been analyzed with FFT analysis on the frequency domain; thus, the desirable effects of running PSS in Ulchin N/P #1 on power system have been explicitly confirmed. Finally, the derived PSS model parameters lead to good matches between simulation results and recorded data.

  • PDF

Identification of Excitation System Model Parameters from the Test of Switching from MVR Mode to AVR Mode (MVR모드에서 AVR모드로의 절환에 의한 여자계 모델정수 결정)

  • Kim, Dong-Joon;Moon, Yung-Hwan;Choi, Kyung-Sun;Lyu, Seung-Hhon;Song, Seok-Ha;Lee, Heung-Taek
    • Proceedings of the KIEE Conference
    • /
    • 1996.11a
    • /
    • pp.91-94
    • /
    • 1996
  • A simulation procedure was developed for identifying Yungnam unit 2 excitation model parameters to improve the accuracy of stability simulation of KEPCO. First, generator model parameters are derived by using modified load rejection technique from measured load rejection test. For identifying excitation model parameters, switch was changed from MVR mode to AVR mode in Yungnam unit 2 excitation system instead of applying to a small step to the voltage reference($V_{ref}$) because of saving time and efforts, assuming the test result would show coincided result with applying to a small step to the $V_{ref}$. However, it was found that the response of switching from MVR to AVR is greatly different from it of applying small signal to the $V_{ref}$. A simulation procedure was needed to take into accounts of real AVR component status before and after switching from MVR to AVR. This paper reports the procedure which duplicated the measured response and addresses the merits of this test on conventional AVR step test.

  • PDF

A Study of PSS Modelling of Ulchin Nuclear Plant Unit #1 by AVR Step Test (측정에 의한 울진 원자력 1호기 PSS 모델링 연구)

  • Kim, D.J.;Moon, Y.H.;Chun, D.H.;Kim, T.K.
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.152-155
    • /
    • 2000
  • This paper deals with the PSS modelling of Ulchin N/P Unit #1 by utilizing the recorded data from AVR step test. In addition to it, the recorded results obtained from the AVR step test with PSS running and without PSS running are not only compared each other on the time domain but they are also analyzed with FFT on the frequency domain; the desirable effect of running PSS in Ulchin N/P Unit #1 is examined. Finally, the derived PSS model parameters lead to good matches between simulation results and recorded data.

  • PDF

Design and Tuning of Micro 5KVA Machine's AVR/PSS Robust Control Parameters (축소형 5KVA 동기발전기 AVR/PSS 강건한 제어정수 설계 및 튜닝)

  • Kim, D.J.;Moon, Y.H.;Kim, T.K.;Shin, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.165-168
    • /
    • 2000
  • This paper describes the guideline of design and tuning of practical Micro 5KVA machine's digital AVR/PSS control parameters by using the computer models and testing on-line AVR step test of laboratory simulator under the no-load or load conditions. The suggested procedures can be also applied to the large scaled machine's AVR/PSS control parameter tuning in KEPCO system.

  • PDF

Modeling and verification of generator/control system of Seo-Inchon combined-cycle plant by load rejection test (부하차단시험에 의한 서인천복합화력 발전기.제어계의 모델링 및 검증)

  • 최경선;문영환;김동준;추진부;류승헌;권태원
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.4
    • /
    • pp.501-510
    • /
    • 1996
  • The gas-turbine generator of Seo-Incheon combined-cycle plant was tested for derivation of a model for dynamic analysis. Load rejection and AVR step test was performed to get the dynamic response of generator. The parameters of generator/control system model were determined by these measured data. No-load saturation test was performed for the saturation characteristics of the generator under steady state. V-curve test was also performed so as to find exact generator parameters. Q-axis parameters of generator was derived by measuring power angle. AVR and governor constants have been tuned by their oscillatory period and setting time characteristics. The derived parameters of generator control system is verified by one-machine infinite bus system simulation. (author). 7 refs., 20 figs., 5 tabs.

  • PDF

A Practical Tuning Method of Dual-Input PSS and its Application to Large Power System (다중-입력 PSS의 실제적인 튜닝 방법과 대형 전력 시스템에의 적용)

  • Kim, Dong-Joon;Moon, Young-Hwan;Hur, Jin;Shin, Jeong-Hoon;Kim, Tae-Kyun;Choo, Jin-Boo
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.7
    • /
    • pp.362-370
    • /
    • 2002
  • This paper describes the practical tuning method of dual-input PSS and its application to Muju P/P #2 with Proto PSS, which is based on DSP technology and uses both frequency and power. First, the model parameters of generator system used in this paper have been derived from the generator characteristic testing. Then, in the selection of PSS parameters, the Bode plot is plotted in order to tune the PSS's time constants which are able to compensate the phase lagging due to generator and excitation system. In addition, the eigenvalue analysis is also performed for determining a reliable PSS gain, $K_{s}$. Finally, the transient stability program has been utilized to verify the safe operation of Proto PSS against the predictable disturbances such as the AVR-step test and generator unloading test. In on-site test, the simulated results have been identically duplicated by implementing AVR step test in Muju P/P #2 with Proto PSS, which has the previously designed PSS parameters.s.

A Biologically Inspired Intelligent PID Controller Tuning for AVR Systems

  • Kim Dong-Hwa;Cho Jae-Hoon
    • International Journal of Control, Automation, and Systems
    • /
    • v.4 no.5
    • /
    • pp.624-636
    • /
    • 2006
  • This paper proposes a hybrid approach involving Genetic Algorithm (GA) and Bacterial Foraging (BF) for tuning the PID controller of an AVR. Recently the social foraging behavior of E. coli bacteria has been used to solve optimization problems. We first illustrate the proposed method using four test functions and the performance of the algorithm is studied with an emphasis on mutation, crossover, variation of step sizes, chemotactic steps, and the life time of the bacteria. Further, the proposed algorithm is used for tuning the PID controller of an AVR. Simulation results are very encouraging and this approach provides us a novel hybrid model based on foraging behavior with a possible new connection between evolutionary forces in social foraging and distributed non-gradient optimization algorithm design for global optimization over noisy surfaces.

A Practical Power System Stabilizer Tuning Method and its Verification in Field Test

  • Shin, Jeong-Hoon;Nam, Su-Chul;Lee, Jae-Gul;Baek, Seung-Mook;Choy, Young-Do;Kim, Tae-Kyun
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.3
    • /
    • pp.400-406
    • /
    • 2010
  • This paper deals with parameter tuning of the Power System Stabilizer (PSS) for 612 MVA thermal power plants in the KEPCO system and its validation in a field test. In this paper, the selection of parameters, such as lead-lag time constants for phase compensation and system gain, is optimized using linear and eigenvalue analyses. This is then verified through the time-domain transient stability analysis. In the next step, the performance of PSS is finally verified by the generator's on-line field test. After the field test, measured and simulated data are also compared to prove the effectiveness of the models used in the simulations.

Characteristic Tests on the Gas Turbine Generator System for Determination and Verification of Model Parameters in a Combined Cycle Power Plant (복합화력발전소 가스터빈 발전기계통 모델정수 도출 및 검증을 위한 특성시험)

  • Kim, Jong Goo;Yoo, Hoseon
    • Plant Journal
    • /
    • v.17 no.4
    • /
    • pp.35-40
    • /
    • 2021
  • In this study, a technical characteristic test was conducted on the gas turbine generator system of Seoincheon Combined cycle no.6 to derive and verify the model constants. As a result of the generator maximum/minimum reactive power limit test, the maximum reactive power limit is 80 MVar and the minimum is -30 MVar. The generator uses the GENROU model, the field time constant (T'do) is 4.077 s, and the inertial constant (H) is 5.461 P.U. Excitation system used ESST4B model to derive and verify model constants by simulating no-load 2% AVR step test, PSS modeling derived from PSS2A model constants, and simulated and compared measurement data measured when PSS off/on Did. The GGOV1 model was used for the governor-turbine, and the numerical stability of the determined governor-turbine model constant was verified by simulating a 10% governor step test through the PSS/E simulation program

The trial installation test of PSS to Power Plant using Real Time Digital Simulator (RTDS를 이용한 PSS 현장 설치 모의 시험)

  • Hur, Jin;Kim, Dong-Joon;Moon, Young-Hwan;Shin, Jeong-Hoon;Kim, Tae-Kyun
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.59-62
    • /
    • 2002
  • Before a developed digital Power System Stabilizer(PSS) is installed to real power system, an efficient trial test for installing PSS is needed. In this paper, the performance of developed digital PSS for a single hydro-turbine generator and infinite bus system has been investigated using Real Time Digital Simulator(RTDS) in order to install PSS to real power system practically. The test system was composed of RTDS, three phase voltage/current amplifier and the PSS and the test scheme provided a very efficient way to verify the design and control performance of a PSS to be applied to real power system. The trial installation test through AVR 3% step test and three fault analysis may be guaranteed to install PSS to real power system.

  • PDF