• Title/Summary/Keyword: ARENA Simulation

Search Result 102, Processing Time 0.03 seconds

Simulation Analysis of the Train Overhaul Maintenance Capacity for Rolling Stock Depot (열차 차량기지의 중정비 검수 용량 시뮬레이션 분석)

  • Jeon, Byoung-Hack;Lee, Won-Young;Jang, Seong-Young;Yoo, Jae-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1481-1498
    • /
    • 2007
  • As railroad industry face the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high speed long distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for detailed operations of the sample maintenance center are developed. In this study, standard maintenance procedures, layout, equipments and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. Three simulation analysis using the developed simulation model are done. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Lastly, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared.

  • PDF

A basic study on the solution to Traffic indigestion at the high-demand season in the vicinity of Mokpo port with Arena (Arena를 이용한 성수기 목포항 인근의 교통체화 현상 해결방안에 관한 기초적 연구)

  • Jang Jeong-Ae;Noh Chang-kyun
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2004.05b
    • /
    • pp.43-48
    • /
    • 2004
  • The development of the traffic system has brought relative reduction in aspect of the cost and time distance on the geographical space. SOC(social overhead capital), an express highway and railroad, has a great and absolute effect on the prosperity of community, As Mokpo is one of the community under the influence q West costal highway express and KTX(Korea Train Express), the number of the tourists visiting city of port like Mokpo has increasing gradually, especially at the high-demand season(in Summer). But the coastal passenger boot can't be capable of customers arriving at the port. As a result of this situation, the 'balking' occurs. No 'balking', means the jam of road. In this thesis, by understanding the concept and property of ARENA and simulating operation of coastal passenger boot at Mokpo port, intends to analyze the truth of 'balking' and finds an effective operation method of coastal passenger boot for the solution to the traffic jam. The solution to the jam in the vicinity of port of Mokpo, which try to develop tourism package commodity now, will present the effect of qualitative analysis in giving an opportunity of economic growth of the community, Mokpo.

  • PDF

A Development of Reverse Supply Chain Simulation Model Considering a Recycling (재활용을 고려한 역공급사슬 시뮬레이션 모델 개발)

  • Lim, Seok-Jin;Park, Byung-Tae
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.4
    • /
    • pp.193-199
    • /
    • 2009
  • Recently, an industrial production-distribution planning problem has been widely investigated in Supply Chain Management(SCM). One of the key issues in the current SCM research area is reverse logistics network. This study have developed a simulation model for the reverse logistics network. The simulation model analysis reverse logistics network issues such as inventory policy, manufacturing policy, transportation mode, warehouse assignment, supplier assignment. Computational experiments using commercial simulation tool ARENA show that the real problems. The model can be used to decide an appropriate production-distribution planning problem in the research area.

A Study on the Productivity Improvement of the Dicing Blade Production Process (다이싱 블레이드 제조공정의 생산성향상에 관한 연구)

  • Mun, Jung-Su;Park, Soo-Yong;Lee, Dong-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.3
    • /
    • pp.147-155
    • /
    • 2016
  • Industry 4.0's goal is the 'Smart Factory' that integrates and controls production process, procurement, distribution and service based on the fundamental technology such as internet of the things, cyber physical system, sensor, etc. Basic requirement for successful promotion of this Industry 4.0 is the large supply of semiconductor. However, company I who produces dicing blades has difficulty to meet the increasing demand and has hard time to increase revenue because its raw material includes high price diamond, and requires very complex and sensitive process for production. Therefore, this study is focused on understanding the problems and presenting optimal plan to increase productivity of dicing blade manufacturing processes. We carried out a study as follows to accomplish the above purposes. First, previous researches were investigated. Second, the bottlenecks in manufacturing processes were identified using simulation tool (Arena 14.3). Third, we calculate investment amount according to added equipments purchase and perform economic analysis according to cost and sales increase. Finally, we derive optimum plan for productivity improvement and analyze its expected effect. To summarize these results as follows : First, daily average blade production volume can be increased two times from 60 ea. to 120 ea. by performing mixing job in the day before. Second, work flow can be smoother due to reduced waiting time if more machines are added to improve setting process. It was found that average waiting time of 23 minutes can be reduced to around 9 minutes from current process. Third, it was found through simulation that the whole processing line can compose smoother production line by performing mixing process in advance, and add setting and sintering machines. In the course of this study, it was found that adding more machines to reduce waiting time is not the best alternative.

Efficient Yard Tractor Control Method for the Dual Cycling in Container Terminal (효율적인 듀얼 사이클을 위한 야드 트랙터 통제 방법)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.36 no.1
    • /
    • pp.69-74
    • /
    • 2012
  • Recent global supply chain, improving the efficiency of container shipping process is very important. In the overseas shipping of goods, the voyage of super containership is common to overcome amount of increasing cargo. Thus, container terminal managers make an experiment on the double cycle and dual cycle operation, which ship loading and unloading were carried out simultaneously, for maximizing the productivity of quay side. Yard Tractors(YTs) pooling methods also are introduced for increasing the efficiency of assignment of YTs. In this paper, we analyzed the efficiency of dual cycling through comparing existing pooling methods with the modified method for the dual cycling. We developed a simulation model using simulation analysis software, Arena. The result of experiment shown that the more dual cycling don't always increase the gross crane rate(GCR), which means productivity of quay cranes(QCs) per hour.

Study on Optimal Appointment Pattern using Plastic Surgery Appointment Data (성형외과 예약 고객 데이터를 반영한 최적 예약 패턴 연구)

  • Choi, Jiyeon;Chung, Yerim
    • Korea Journal of Hospital Management
    • /
    • v.23 no.3
    • /
    • pp.87-103
    • /
    • 2018
  • Purpose: This study investigates the best appointment pattern which can enhance customer's satisfaction and hospital's efficient management reflecting plastic surgery clinic's service characteristics. Methodology: The data of this study is obtained from Plastic surgery Clinic which is located in the civic center. By collecting and analyzing the data, we build the simulation model using ARENA. Based on 5 appointment patterns that was suggested in formal appointment scheduling studies, we experiment 3 simulation models; 'Basic Appointment Pattern' that has no restriction, 'Restriction on Second Customer' that restricts the number of second customer's in each slot, 'Restriction on Process Time' that restricts the number of second customer who has long process time in each slot. We can check robustness of the appointment patterns by experimenting on off-peak day and peak day, during peak season. Findings: This study confirms that these 2 restrictions can give a better result than 'Basic Appointment Pattern' that just simply distributes customers by number. Especially, the performance of Triangle-like pattern which is the best appointment pattern in the formal study has been improved by adding restrictions. Based on 'DET', 'Restriction on Second Customer' shows a better result. Meanwhile, based on 'E(WT)', 'Restriction on Process Time' shows a better result. Overall, based on 'DET+E(WT)', 'Restriction on Second Customer' shows a better result. Practical Implications: The purpose of each hospital may alter as demand for plastic surgery grows increasingly. Thus, each hospital should be always prepared to introduce appointment pattern for changed purpose. In order to respond flexibly to these changes, it is necessary for medical personnel to improve the awareness or for hospital to create an environment by constructing appointment program so that medical personnel does not need to put more labor on work.

Job Shop System Analysis through DBR Simulation (DBR 시뮬레이션을 통한 Job Shop 시스템 분석)

  • Shim, Yun-Seop;Byeon, Ji-Hwan;Hwang, Soon-Hyun;Jeon, Tae-Bo
    • Journal of Industrial Technology
    • /
    • v.31 no.B
    • /
    • pp.51-58
    • /
    • 2011
  • Simulation plays a pivotal role in the analysis of complex systems. In this study, a job shop manufacturing system has been analyzed through DBR (Drum-buffer-rope) simulation. Specific attention has been put to examine the rate of due-date achievement. We first derived key factors affecting the system performance. We then developed ARENA simulation program based on DBR of TOC (Theory of Constraints) concepts. Based on the performance measure, factors, and experimental design, we obtained the results. We have drawn meaningful results through examination of the results. The results obtained from this study may provide a good base for practical applications.

  • PDF

A Study on the Implementation and the Performance Evaluation of the Train Communication Network (전동차용 통신 네트워크 프로토콜 구현 및 성능평가에 관한 연구)

  • Lee, Sang-Chul;Park, Jae-Hyun;Chang, Nae-Hyuck
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.12
    • /
    • pp.1580-1588
    • /
    • 1999
  • This paper evaluates the real-time performance of the Train Communication Network (TCN) that consists of WTB and MVB. A run-time scheduling algorithm for the hard-real time communication was proposed and its performance was evaluated. Also, a new addressing method and the adaptive tree algorithm were suggested to enhance performance. The overall performance was evaluated by computer simulation using Arena.

  • PDF

A Study of Buffer Allocation in FMS based on Deadlock & Workload (FMS의 Deadlock과 Workload를 고려한 최적 버퍼 할당에 관한 연구)

  • 이정표;김경섭
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.71-74
    • /
    • 2000
  • Due to the complexity of parts flow and limited resources, FMS(Flexible Manufacturing System) develops blocking, starvation and deadlock problems, which reduce its performance. In order to minimize such problems buffers are imposed between workstations of the manufacturing lines. In this paper, we are concerned with finding the optimal buffer allocation with regard to maximizing system throughput in limited total buffer capacity situation of FMS. A grouping heuristic to solve the buffer allocation problem is proposed. Computer simulation using Arena will be experimented to show the validation of the proposed algotithm.

  • PDF

Development of Simulation Model to Determine the Optimal Number of Pharmacist at the Hospital Pharmacy Considering the Waiting Time (병원약제부의 적정약사수를 결정하기 위해 대기시간을 고려한 시뮬레이션 모델 개발)

  • 최재혁;이배진;강창욱;최경업;김정미
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.223-232
    • /
    • 1998
  • In order to improve the hospital service quality, some hospitals try to reduce the outpatients' waiting time in the hospital. One of the dissatisfied service items at the hospital is the long waiting time to take the prescribed medicine. In most cases, the smaller the number of pharmacists, the longer could be the waiting time. The suggestion of criteria for optimal allocation of appropriate number of pharmacists must be very important to manage the hospital pharmacy. In this paper, we suggest the method to figure out appropriate number of pharmacists through the real situation study at the Sampling Medical Center Pharmacy. We present the simulation study results using the simulation package ARENA and the analysis of statistical distribution of the arriving prescriptions. The result of this research could be applied to the other service business to figure out the optimal allocation of available human resources and to do the job analysis for better service quality.

  • PDF