• Title/Summary/Keyword: AGV scheduling

Search Result 34, Processing Time 0.023 seconds

Multiobjective Genetic Algorithm for Scheduling Problems in Manufacturing Systems

  • Gen, Mitsuo;Lin, Lin
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.4
    • /
    • pp.310-330
    • /
    • 2012
  • Scheduling is an important tool for a manufacturing system, where it can have a major impact on the productivity of a production process. In manufacturing systems, the purpose of scheduling is to minimize the production time and costs, by assigning a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce the costs. In order to find an optimal solution to manufacturing scheduling problems, it attempts to solve complex combinatorial optimization problems. Unfortunately, most of them fall into the class of NP-hard combinatorial problems. Genetic algorithm (GA) is one of the generic population-based metaheuristic optimization algorithms and the best one for finding a satisfactory solution in an acceptable time for the NP-hard scheduling problems. GA is the most popular type of evolutionary algorithm. In this survey paper, we address firstly multiobjective hybrid GA combined with adaptive fuzzy logic controller which gives fitness assignment mechanism and performance measures for solving multiple objective optimization problems, and four crucial issues in the manufacturing scheduling including a mathematical model, GA-based solution method and case study in flexible job-shop scheduling problem (fJSP), automatic guided vehicle (AGV) dispatching models in flexible manufacturing system (FMS) combined with priority-based GA, recent advanced planning and scheduling (APS) models and integrated systems for manufacturing.

A study on flexible manufacturing system for engine cylinder block (엔진 실린더 블럭 가공라인의 자동화 시스템에 관한 연구)

  • 전용철;윤병용;홍동표
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1986.10a
    • /
    • pp.544-546
    • /
    • 1986
  • In this report, we have designed a Flexible Manufacturing System(FMS) for Engine-Cylinder block that is composed of maching center, special purpose machine, AGV(Automatic Guided Vehicle), using Micro-Computer and Programmable Controller(PC). From this report, we mostly present hardware features and scheduling software.

  • PDF

A Study on Gain Scheduling Programming with the Fuzzy Logic Controller of a 6-axis Articulated Robot using LabVIEW® (LabVIEW®를 이용한 6축 수직 다관절 로봇의 퍼지 로직이 적용된 게인 스케줄링 프로그래밍에 관한 연구)

  • Kang, Seok-Jeong;Chung, Won-Jee;Park, Seung-Kyu;Noe, Sung Hun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.16 no.4
    • /
    • pp.113-118
    • /
    • 2017
  • As the demand for industrial robots and Automated Guided Vehicles (AGVs) increases, higher performance is also required from them. Fuzzy controllers, as part of an intelligent control system, are a direct control method that leverages human knowledge and experience to easily control highly nonlinear, uncertain, and complex systems. This paper uses a $LabVIEW^{(R)}-based$ fuzzy controller with gain scheduling to demonstrate better performance than one could obtain with a fuzzy controller alone. First, the work area was set based on forward kinematics and inverse kinematics programs. Next, $LabVIEW^{(R)}$ was used to configure the fuzzy controller and perform the gain scheduling. Finally, the proposed fuzzy gain scheduling controller was compared with to controllers without gain scheduling.

Development of an Operation Software for the ASRI-FMS/CIM (ASRI-FMS/CIM 을 위한 운용 소프트웨어의 구축)

  • Park, Chan-Kwon;Park, Jin-Woo;Kang, Suk-Ho
    • IE interfaces
    • /
    • v.6 no.2
    • /
    • pp.53-65
    • /
    • 1993
  • This paper deals with the development of a software module for production planning and scheduling activities of an existing Flexible Machining and Assembly System (FMAS). The Production Planning Module uses the hierarchical and sequential scheme based on "divide and conquer" philosophy. In this module, routes are determined based on the production order, orders are screened, tools are allocated, and order adjustments are executed according to the allocated tools. The Scheduling Module allocates the resources, determines the task priority and the start and completion times of tasks. Re-scheduling can be done to handle unforeseen situations such as lumpy demands and machine breakdowns. Since all modules are integrated with a central database and they interface independently, it is easy to append new modules or update the existing modules. The result of this study is used for operating the real FMAS consisting of a machining cell with 2 domestic NC machines and a part feeding robot, an assembly cell with a conveyor and 3 robots, an inspection cell, an AGV, an AS/RS, and a central control computer.

  • PDF

A Study on the Hierarchical Real-time Operation Control and Monitoring for an Flexible Manufacturing System (유연생산시스템의 계층구조적 실시간 운용제어 및 모니터링에 관한 연구)

  • Kim, Jong-Won
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.9 no.4
    • /
    • pp.36-43
    • /
    • 1992
  • This paper presents a hierarchical real-time operation control and monitoring scheme of the FMS/CIM center which has been implemented at the Automation and Systems Research Institute of Seoul National University. The hierarchical structure of the whole scheme consists of three lavers. The upper layer is in charge of on-line scheduling, computer network control, shop-floor monitoring and command generation for AGV dispatching, machining, assembly, inspection, set-up, etc. The middle layer has six modules, which are installed in the FMS host computer with the upper layer and run on the multi-tasking basis. Each module is connected to one of six cell controllers distributed in the FMS model plant and transfers operation command down to each cell controller through the Ethernet/TCP-IP local area network. The lower layer is comprised of six cell control software modules for machining cell, assembly cell, inspection cell, set-up stations. AS/RS and AGV. Each cell controller reports the status of the manufacturing facilites to the middle layer as well as ecxecuting the appropriate sequence control of the manufacturing processes.

  • PDF

A Study on Multi-Stage Dispatching Rule for Efficient AGVS (Automated Guided Vehicle System) (효율적인 AGVS의 운용을 위한 다단계 차량 발주 방식에 관한 연구)

  • 박대희
    • Journal of the Korea Society for Simulation
    • /
    • v.6 no.1
    • /
    • pp.41-52
    • /
    • 1997
  • It is essential to construct an efficient material flow system for the successful introduction of automated manufacturing systems. Automated Guided Vehicle System (AGVS) plays a significant role more and more in modern manufacturing environments, because of the flexibility and the precision they offer. However, as the size and the complexity of systems increase, the problems of dispatching, routing and scheduling of AGVs become complicated due to their independent and asynchronous demands. In this paper, we review relevant papers, and provide a new and more efficient method for dispatching AGV, named MEVTT (Minimum Empty Vehicle Travel Time) and demonstrate its performance and efficiency using simulation.

  • PDF

물류시스템 통합정보체계에 관한 연구

  • 김동훈;송준엽;이현용
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.135-142
    • /
    • 1994
  • 생산시스템을 구성하는 자동화 요소들을 물리적으로 연결하는 물류시스템은 공장자동화를 구축하는데 핵심 요소로서 통합시스템 운영차원에서의 체계적인 정보구조를 가져야 한다. 따라서 본 연구에서는 물류시스템을 대표하는 AS/RS와 AGV시스템의 제어 Protocol 해석과 cell level에서 관리되어야 할 정보를 분석하여 정보흐름을 중심으로 한 물류시스템용 통합정보체계를 설계하였다. 또한, 물류 cell level의 통합차원에서 필요로 하는 제어정보 및 감시정보의 정의와 시스템 scheduling에서 고려될 상황정보를 설계하였다.

On optimal cyclic scheduling for a flexible manufacturing cell

  • Kise, Hiroshi;Nakamura, Shinji;Karuno, Yoshiyuki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10b
    • /
    • pp.1250-1255
    • /
    • 1990
  • This paper discusses an optimal cyclic scheduling problem for a FMC (Flexible Manufacturing Cell) modeled by a two-machine flowshop with two machining centers with APC's (Automated Pallet Changers), an AGV (Automated Guided Vehicle) and loading and unloading stations. Cyclic production in which similar patterns of production is repeated can significantly reduce the production lead-time and WIP (Work-In-Process) in such flexible, automated system. Thus we want to find an optimal cyclic schedule that minimizes the cycle time in each cycle. However, the existence of APC's as buffer storage for WIP makes the problem intractable (i.e., NP-complete). We propose an practical approximation algorithm that minimizes, instead of each cycle time, its upper bound. Performances of this algorithm are validated by the way of computer simulations.

  • PDF

Design of Experiment and Analysis Method for the Integrated Logistics System Using Orthogonal Array (직교배열을 이용한 통합물류시스템의 실험 설계 및 분석방법)

  • Park, Youl-Kee;Um, In-Sup;Lee, Hong-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.12
    • /
    • pp.5622-5632
    • /
    • 2011
  • This paper presents the simulation design and analysis of Integrated Logistics System(ILS) which is operated by using the AGV(Automated Guided Vehicle). To maximize the operation performances of ILS with AGV, many parameters should be considered such as the number, velocity, and dispatching rule of AGV, part types, scheduling, and buffer sizes. We established the design of experiment in a way of Orthogonal Array in order to consider (1)maximizing the throughput; (2)maximizing the vehicle utilization; (3)minimizing the congestion; and (4)maximizing the Automated Storage and Retrieval System(AS/RS) utilization among various critical factors. Furthermore, we performed the optimization by using the simulation-based analysis and Evolution Strategy(ES). As a result, Orthogonal Array which is conducted far fewer than ES significantly saved not only the time but the same outcome when compared after validation test on the result from the two methods. Therefore, this approach ensures the confidence and provides better process for quick analysis by specifying exact experiment outcome even though it provides small number of experiment.