• Title/Summary/Keyword: 현장품질관리

Search Result 674, Processing Time 0.029 seconds

A Study on Improvement of the Quality Management for Fire Doors (방화문의 현장품질관리 개선방안에 관한 연구)

  • Choi, Dong-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.93-94
    • /
    • 2019
  • When the fire door is recently installed in the field, there are frequent cases where the fire door is manufactured with fire door having low quality or different structure compared to the performance that the fire door producer has confirmed in the performance test or the construction specification. In order to improve the on-site quality management of the fire door, we comprehensively classify the quality management items of the fire door according to the management subject and the step by stage and set the field quality management procedure, the field quality management inspection item, regulations and standardized checklists were presented.

  • PDF

On-site Quality Control Support Tools Based on Mobile BIM - Focusing on Quality Management Work - (모바일 BIM기반 현장 감리업무 지원도구 - 품질관리업무를 중심으로 -)

  • Song, Jingxu;Yu, Jungho;Kim, Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.27-37
    • /
    • 2020
  • In order to reduce the possible quality problems in the construction stage. This research will develop a quality management support tool based on Mobile BIM. In order to develop the tools of this study, the procedures of domestic quality management work were analyzed, and 12 functions were derived to solve the existing problems, and the process of mapping checklists by work type and BIM model objects was performed. Finally, through the questionnaire survey on the usefulness of the tool in the actual field, the possibility of props in actual supervision business is verified.

Quality of Dry Cement Mortar for Floor Heating Depending on Water-to-Dry Mortar Rutio (난방을 위한 바닥용 건조 시멘트 모르타르의 혼합수량비 변화에 따른 품질 특성)

  • Park, Sang-Jun;Hwang, Yin-Seong;Lee, Gun-Cheol;Kim, Jong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.181-188
    • /
    • 2021
  • In this study, the various performance of dry cement mortar for Korean floor heating system depending on water-to-dry mortar ratios (W/DM) applied in project site was evaluated. According to the experiment conducted, the importance of mixing water for dry cement mortar was revealed by resultant performance or quality of the dry cement mortar for floor finishing by changing W/DM controlled in project site by workers. As the general trend, the flow was increased, and the unit volume weight was decreased with increasing W/DM. Additionally, compressive strength and drying shrinkage were significantly influenced by W/DM. Hence, it can be stated that the adding water for dry cement mortar should be managed precisely since excessively increased W/DM for workability improvement can cause performance degradation of floor mortar with the failures such as excessive bleeding, and severe segregation during the fresh state. As a summary of the study, to achieve a desirable performance of dry cement mortar, approximately 20 % of W/DM can be suggested to be managed in project site.

Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support - (조립 가설기자재 품질평가 및 관리 시스템 개발 - 강관 비계, 시스템 비계, 시스템 동바리를 중심으로 -)

  • Jang, Ji young;Lee, Ji yeon;Kim, Ha yoon;Lee, Jun ho;Kim, Jun-Sang;Kim, Jung-Yeol;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.43-55
    • /
    • 2022
  • Since assembled temporary equipment is widely used for construction work that should be carried out before this construction begins, it is essential to secure quality during assembly and prevent safety accidents caused by assembled temporary equipment after installation. However, it was investigated that most construction site managers are not aware of its importance, such as recognizing the quality management of assembled temporary equipment as a task of managing temporary structures that are dismantled after installation for this construction. The quality management work of assembled temporary equipment at the construction site is carried out in different ways for each construction site because there is no formalized procedure and the subject of performing. In addition, it is analyzed that the manager of the general construction company inspects and reflects the parts that need to be inspected without evidence, so transparency is not guaranteed and the result leads to a serious disaster. Therefore, the purpose of this study is to establish a document preparation-oriented system that provides systematic quality evaluation and management procedures for securing the quality of assembled temporary equipment, develops a checklist for quality evaluation and management, and supports history management on the web.

Improvement Model of Quality Management System of Construction Site Based on RESTful-API (RESTful-API 기반의 건설현장 품질관리 시스템 개선 모델)

  • Park, Koo-Rack
    • Journal of the Korea Convergence Society
    • /
    • v.11 no.3
    • /
    • pp.61-66
    • /
    • 2020
  • Modern society is developing rapidly due to the convergence of industry and IT technology. In that case, the role of construction work that provides basic infrastructure can be very large. Recently, as construction work becomes more complicated, larger, and more advanced, the importance of management, such as system improvement for quality improvement, has become even more important. However, when a quality control problem occurs at a construction site, much time is required to solve the problem. In order for a construction project to be successful, various systems need to be organically connected and able to manage optimal decisions. In this paper, provide a quality control model using GCM push alarm service based on RESTful_API. The proposed model is a model that can be used by construction company quality control rooms and project managers for decision making. When applied to construction site project management, it is expected that more efficient and safe construction management will be possible.

Trends of Quality Management Technologies and Applications in Agri-Food Industry in EU (EU의 농식품 품질관리 기술 활용 현황)

  • Kim, Jong-Hoon
    • Bulletin of Food Technology
    • /
    • v.23 no.4
    • /
    • pp.592-597
    • /
    • 2010
  • 본 내용은 2010년 4월 25일부터 2010년 5월 1일까지 이탈리아의 UNITEC, SALVI, SORMA, APOFRUIT, 농식품유통매장을 방문하여, EU의 농식품 선별 및 품질관리 센싱기술의 현장 활용실태와 농식품 이력추적관리 및 농산물산지유통센터의 품질센싱 기술을 조사한 결과이다.

  • PDF

A Methodology for Quality Control of Railroad Trackbed Fills Using Compressional Wave Velocities : I. Preliminary Investigation (압축파 속도를 이용한 철도 토공노반의 품질관리 방안 : I. 예비연구)

  • Park, Chul-Soo;Mok, Young-Jin;Choi, Chan-Yong;Lee, Tai-Hee
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.9
    • /
    • pp.45-55
    • /
    • 2009
  • The quality of railroad trackbed fills has been controlled by field measurements of density and bearing resistance of plate-load tests. The control measures are compatible with the design procedures whose design parameter is $k_{30}$ for both ordinary-speed railways and high-speed railways. However, one of fatal flaws of the design procedures is that there are no simple laboratory measurement procedures for the design parameters ($k_{30}$ or, $E_{v2}$ and $E_{v2}/E_{v1}$) in design stage. To overcome the defect, the compressional wave velocity was adopted as a control measure, in parallel with the advent of the new design procedure, and its measurement technique was proposed in the preliminary investigation. The key concept of the quality control procedure is that the target value for field compaction control is the compressional wave velocity determined at optimum moisture content using modified compaction test, and direct-arrival method is used for the field measurements during construction, which is simple and reliable enough for practice engineers to access. This direct-arrival method is well-suited for such a shallow and homogeneous fill lift in terms of applicability and cost effectiveness. The sensitivity of direct-arrival test results according to the compaction quality was demonstrated at a test site, and it was concluded that compressional wave velocity can be effectively used as quality control measure. The experimental background far the companion study (Park et al., 2009) was established through field and laboratory measurements of the compressional wave velocity.

Development of Monitoring Management System on Sensor (센서를 통한 모니터링 관리시스템 연구)

  • 박주식;강경식;김길동
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.05a
    • /
    • pp.269-274
    • /
    • 2002
  • 국내의 제조환경에 적합하고 다운사이징 및 개방형의 개발특성을 갖추고, 특히 기업 내의 타 시스템인 생산관리, 품질관리, 자재 및 재고관리 등과도 연계성을 높인다. 현장의 가동상태정보를 품질정보, 생산정보와 인터페이스 하여 실시간적으로 저장, 조회, 분석할 수 있는 관리시스템을 산학연 연구를 통해 구현한다.

  • PDF

GPS Observation Data Quality Control using Control Parameters (Control Parameter를 이용한 GPS 관측데이터의 품질 관리)

  • 이동하;윤홍식;이영균
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.87-93
    • /
    • 2004
  • 본 연구에서는 효율적인 GPS 데이터의 품질관리를 위한 GPS_QC 프로그램을 개발하여, GPS 데이터의 Quality 판단할 수 있는 총 8개의 Control 인자(위성의 배치, Multipath 오차량, 전리층 지연량 및 위성신호 강도 등)를 계산 할 수 있었으며, GPS 데이터 품질에 관련된 Control 인자의 결과값 및 허용오차 범위, 실제 관측데이터의 허용오차의 포함여부를 시계열 그래프와 보고서 형태로 제공하여 현장 등에서 간단하고 효율적으로 GPS 데이터의 품질관리를 가능하게 한다. 따라서 기존에 GPS 데이터 해석 후에나 판단이 가능했던 데이터의 품질을 현장이나 실내에서 직접 확인할 수 있게 함으로서 재측과 데이터 처리 시 소요되는 시간과 경비를 절감할 수 있을 것으로 판단된다.

  • PDF