Browse > Article
http://dx.doi.org/10.6106/KJCEM.2022.23.5.043

Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support -  

Jang, Ji young (Department of Architectural Engineering, Inha University)
Lee, Ji yeon (Department of Architectural Engineering, Inha University)
Kim, Ha yoon (Department of Architectural Engineering, Inha University)
Lee, Jun ho (Department of Architectural Engineering, Inha University)
Kim, Jun-Sang (Department of Architectural Engineering, Inha University)
Kim, Jung-Yeol (Department of Architectural Engineering, Inha University)
Kim, Young Suk (Department of Architectural Engineering, Inha University)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.5, 2022 , pp. 43-55 More about this Journal
Abstract
Since assembled temporary equipment is widely used for construction work that should be carried out before this construction begins, it is essential to secure quality during assembly and prevent safety accidents caused by assembled temporary equipment after installation. However, it was investigated that most construction site managers are not aware of its importance, such as recognizing the quality management of assembled temporary equipment as a task of managing temporary structures that are dismantled after installation for this construction. The quality management work of assembled temporary equipment at the construction site is carried out in different ways for each construction site because there is no formalized procedure and the subject of performing. In addition, it is analyzed that the manager of the general construction company inspects and reflects the parts that need to be inspected without evidence, so transparency is not guaranteed and the result leads to a serious disaster. Therefore, the purpose of this study is to establish a document preparation-oriented system that provides systematic quality evaluation and management procedures for securing the quality of assembled temporary equipment, develops a checklist for quality evaluation and management, and supports history management on the web.
Keywords
Assembled Temporary Equipment; Quality Evaluation; Quality Management;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 MOLIT (Ministry of Land, Infrastructure and Transport). (2021). Building Construction Standard Specification.
2 Jeong, J.W., and Kim, Y.G. (2019). "A Study on the Analysis of Current Situation and the Deduction of Improvement Measure Regarding the Scaffolding and the Related Components at Construction Site." Journal of the Korean Society of Safety, KOSOS, 34(5), pp. 63-71.   DOI
3 Ahn, K.H., Yoon, C.S., Cheon, B.G., and Kim, Y.S. (2002). "A Study on the Development of Quality Management System by utilizing the Defects Information : With checklist in focus." Journal of the Architectural Institute of Korea, JAIK, 18(4), pp. 105-112.
4 Choi, S.B. (2004). Industrial Safety Great Dictionary, Gold.
5 An, S.J., Son, B.S., and Lee, H.S. (2003). "Data Model for Document Exchange of Construction Projects." Proceedings of KICEM Annual Conference, KICEM, 4, pp. 569-572.
6 Jeong, S.C., and Lee, H.G. (2016). "A Study on the Comparative Analysis of the Quality Management System of Temporary Equipment and Materials." Journal of the Architectural Institute of Korea, JAIK, 32(9), pp. 43-50.
7 Lim, H.C., Lee, D.H.. and Kim, D.Y. (2018), "A study in Quality Improvement Factors through the Analysis of Distribution and Management of Temporary Equipment." Journal of the Architectural Institute of Korea, JAIK, 20(5), pp. 97-102.
8 MOEL (Ministry of Employment and Labor). (2020). An Analysis of Industrial Accident Status Report.
9 KOSHA (Korea Occupational Safety & Health Agency). (2020a). KOSHA GUIDE C-32-2020, KOSHA Research Report, 2020-12.
10 KOSAH (Korea Occupational Safety & Health Agency). (2020b). KOSHA GUIDE C-42-2011, KOSHA Research Report, 2020-12.
11 Jung, S.G., Park, J.E., Cha, Y.W., Han, S.W., and Hyun C.T. (2016). "Improvement of Construction Quality Management through Analyzing Construction Work' s Quality Inspection Results." Korean Journal of Construction Engineering and Management, KICEM, 17(1), pp. 110-118.   DOI
12 Lee, M.S. (2004). "A Study on the Establishment of Web Based Construction Working Process Model." Journal of the Architectural Institute of Korea, JAIK, 20(7), pp. 55-62.
13 Lee, H.S., An, S.J., Son, B.S., and Jang, M.H. (2003). "Development of Web-based Electronic Data Interchange Model to Improve the Collaboration of Participants in Construction Projects." Journal of the Architectural Institute of Korea, JAIK, 19(6), pp. 151-160.