• Title/Summary/Keyword: 현장적용 사례

Search Result 1,378, Processing Time 0.027 seconds

A case study of the technology of measurement system using Global Positioning System(GPS) for high-rise buildings (GPS를 이용한 초고층 시공 측량 기술)

  • Kang, Seon-Chong;Kang, Kyoung-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.187-193
    • /
    • 2006
  • With the development of technology the Global Positioning System(GPS) measurement method which uses the artificial satellites to locate its position has been adopted in construction projects. Especially in civil engineering projects which have not any base points needed to measure their position they use the GPS measurement method has been put to practical use. But it was still difficult to use that method in building construction sites which require more accurate measurement data than the current GPS measurement method can provide. In this paper we introduce a new GPS measurement method adopted in Burj Dubai project which would be the tallest building in the world after its completion.

  • PDF

A study on the field application of high strength steel pipe reinforcement grouting (고강도 강관 보강 그라우팅의 현장 적용성에 관한 연구)

  • Shin, Hyunkang;Jung, Hyuksang;Ryu, Yongsun;Kim, Donghoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.455-478
    • /
    • 2019
  • In this paper, we conducted experimental investigation on the field applicability through the verification of reinforcement effect of the steel pipe reinforcement grouting using high strength steel pipe. SGT275 (formerly known as STK400) steel pipe is generally applied to the traditional steel pipe reinforcement grouting method. However, the analysis of tunnel collapse cases applying the steel pipe reinforcement grouting shows that there are cases where the excessive bending and breakage of steel pipe occur. One of the reasons causing these collapses is the lack of steel pipe stiffness responding to the loosening load of tunnels caused by excavation. The strength of steel pipe has increased due to the recent development of high strength steel pipe (SGT550). However, since research on the reinforcement method considering strength increase is insufficient, there is a need for research on this. Therefore, in this study, we conducted experiments on the tensile and bending strength based on various conditions between high strength steel pipe, and carried out basic research on effective field application depending on the strength difference of steel pipe through the conventional design method. In particular, we verified the reinforcement effect of high strength steel pipe through the measurement results of deformed shape and stress of steel pipe arising from excavation after constructing high strength steel pipe and general steel pipe at actual sites. The research results show that high strength steel pipe has excellent bending strength and the reinforcement effect of reinforced grouting. Further, it is expected that high strength steel pipe will have an arching effect thanks to strength increase.

A Case Study on the Hybrid Reinforcement Retaining Wall System Reinforced by Soil Nail and Steel Strip (쏘일네일과 강재스트립으로 보강된 복합보강토옹벽 시스템의 사례연구)

  • Chun, Byung-Sik;Kim, Hong-Taek;Cho, Hyun-Soo;Do, Jong-Nam
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.12
    • /
    • pp.5-12
    • /
    • 2008
  • The reinforced earth wall, which is able to improve the strength of soil highly, is required in case of supporting high surcharge load such as high speed rail way, high embankment road, and massive reinforced earth wall in a mountainous area. And also, it is continuously required that the method is able to minimize the amount of excavated soil on account of environmental issue, boundary of land, etc., on excavation site. However, because the required length of reinforcement should be $60{\sim}80%$ of the height of reinforced earth wall for general reinforced earth wall, in fact the reinforced earth wall is hardly applied on the site of cut slope. In this paper we studied the design and construction cases of hybrid reinforcement retaining wall system combined with steel strips and soil nails, connecting the reinforced earth wall reinforcements to the slope stability reinforcements (soil nails) to ensure sufficient resistance by means of reducing the length of reinforcements of reinforced earth wall. And the feasibility of hybrid reinforcement retaining wall system, suggested by real data measured on site, is also discussed.

Development and Field Application of Apparatus for Determination of Limit State Design Strength Characteristics in Weathered Ground (한계상태설계법 지반정수 산정을 위한 풍화대 강도특성 측정장치의 개발 및 현장적용에 관한 연구)

  • Kim, Ki Seog;Kim, Jong Hoon;Choi, Sung-oong
    • Tunnel and Underground Space
    • /
    • v.30 no.2
    • /
    • pp.164-179
    • /
    • 2020
  • Applying the limit state design method to geotechnical structures, accuracy and reliability of its design are mainly affected by parameters for geotechnical site characteristics, such as unit weight, Poisson's ratio, deformation modulus, cohesion and frictional angle. When the structures are located in weathered ground, especially, cohesion and frictional angle of ground are closely related with decision of parameters for structures' load and ground's resistance. Therefore, the accurate determination of these parameters, which are commonly obtained from field measurement, such as borehole shear test, are essential for optimum design of geotechnical structures. The 38 case studies, in this study, have been analyzed for understanding the importance of these parameters in designing the ground structures. From these results, importance of field measurement was also ascertained. With these evaluations, an apparatus for determining the strength characteristics, which are fundamental in limit state design (LSD) method, have been newly developed. This apparatus has an improved function as following the ASTM suggestion. Through the field application of this apparatus, the strong point of minimizing the possibility of error occurrence during the measurement has been verified and authors summarized that the essential parameters for LSD can be qualitatively obtained by this apparatus for determination of strength characteristics of weathered ground.

A Case of Change in Pile Foundation By Construction Condition in Site (현장상황을 반영한 말뚝기초의 변경 사례)

  • Park, See-Boum;Oh, Geon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.775-778
    • /
    • 2008
  • 기초의 지지방식 중 깊은 기초로 분류되는 말뚝기초는 일반적으로 고강도의 기성강관(Spiral Steel Pipe)을 재료로 한 말뚝을 사용하는 것이 설계 및 시공측면에서 유리하나, 현재 국내 외의 치솟는 건설원자재 비용 및 고유가에 따른 장거리 운반비용의 증가와 더불어 건설현장에서의 경제적 부담이 상당부분 증가되고 있는 실정이다. 특히, 개발후진국을 비롯한 건설 산업의 국제적 진출에 대한 활기와 더불어 해외현장 변동상황(원자재의 수급 문제에 따른 공기지연 및 경제성) 등을 고려하면 이에 대한 능동적인 대처가 절실할 수 있다. 본 사례는 중동지역 $\bigcirc\bigcirc$조선소의 이러한 현장여건을 고려하여 중 소하중 규모의 크레인 기초에 적용된 말뚝의 구조 해석적 검토와 지역 지반조건을 반영하여 안정하고 현지조달이 가능한 말뚝 재료의 변경을 제안한 경우이다. 본 검토에서는 기초 말뚝의 정역학적 허용지지력과 기초지반 조건을 고려한 항타관입 분석 및 크레인 이동하중을 고려한 응력해석을 실시하여 최대연직력, 모멘트, 전단력, 응력비 등을 비교하였으며, 동일한 검토조건하에서 결과를 바탕으로 변경 가능한 말뚝을 선정하였다. 기초지반에 대한 적정안전율을 갖는 허용지지력 및 구조적 안정성의 확보가 가능한 콘크리트 말뚝으로의 변경이 가능하며 상부하중 규모에 따라 설치간격에 따른 파일본수의 증 감이 발생되었다.

  • PDF

Analysis of BIM Impact on Preventing Rework in Construction Phase (시공단계 BIM 적용에 의한 재시공 방지 효과분석)

  • Lee, Myung-Do;Cha, Min-Su;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.169-176
    • /
    • 2018
  • The purpose of this study is to analyze the effects of applying BIM to the construction phase on preventing rework. Previous studies have presented the contribution of BIM in various ways, but a more practical and reliable analysis methodology are required. In this study, a BIM effect analysis methodology was proposed after collecting requirements on BIM effect analysis from field professionals. In the case study, the rework prevention effect was analyzed based on the proposed methodology. As a result, it was found that BIM application produced the rework prevention effect of approximately KRW 370,519,593. In addition, a consultation with field professionals on the suitability of the proposed methodology and effect analysis results were revealed that the results were sufficiently reliable. The results of this study can be used as efficient basic materials for research on BIM performance measurement in the future.

환경친화적인 김 양식장의 산 처리제 대체물질 개발

  • 김도희;김우항;공용근;편선임
    • Proceedings of the Korean Society of Fisheries Technology Conference
    • /
    • 2000.05a
    • /
    • pp.183-184
    • /
    • 2000
  • 김 양식장은 대부분 천해해역으로서 영양염류가 풍부하여 김의 생산력은 증가되나 풍부한 영양염은 김의 성장을 촉진함과 동시에 잡균, 잡조(파래, 규조등)의 중식도 촉진된다. 김망에 부착된 잡조류를 구제하는 산처리제로서 염산을 사용하는 사례가 있어 해양생태계 뿐만 아니라 김 소비에 나쁜 영향을 끼친다. 정부에서는 염산사용에 따른 어장의 황폐화를 방지하고 양질의 김 생산을 위하여 산 처리제로서 염산 등 무기산에 대체할 수 있는 유기산를 사용하도록 권장하고 있으나 제조공정, 경제성, 현장적용과 효과면에서 여러 가지 문제가 해결되지 않고 있다. (중략)

  • PDF

The Case Study of Qualification Assurance for Instrumentation and Control in Nuclear Power Plant (계측제어 기기의 현장적용을 위한 품질보증 사례)

  • Ahn, Byung-Ju;Lee, Sung-Joon;Jeong, Chang-Ki;Jung, Woo-Jong
    • Proceedings of the KIEE Conference
    • /
    • 2002.07d
    • /
    • pp.2219-2221
    • /
    • 2002
  • This paper describes QA methodologies for developed TBN control system that will be applied to nuclear power plants. The details are the development of QA Manual, QA Procedures, Equipment Qualification Procedure, Commercial Grade Items Dedication, and Software Verification & Validation Plan.

  • PDF

A Improvement Plan for Fire Fighting Activity of Rack- Type Warehouse Based on Case Study and Field Interview (사례분석과 현장인터뷰를 통한 적층형 대형창고 소방활동 개선방안 연구)

  • Kim, Woon Hyung;Seo, Dong Hun;Ham, Eun Gu
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.1
    • /
    • pp.67-75
    • /
    • 2019
  • Purpose: The purpose of this study is to suggest a systematic improvement plan for strengthening fire fighting ability of domestic rack- type warehouse buildings. Method: A fire case of small warehouse with sandwich panel structure and four design review of large warehouse with fire endurance structure were analyzed. Also, interviewed a group of 11 fire fighters who had 20 years field experience. Results: A provision of mobile equipment for initial fire fighting, accessibility of more than three sides, installation of internal entrance windows, proper placement of outdoor fire fighting equipment, image processing of fire site informations, and provide more incentives on the field commander are main factors of improvement plan. Conclusion: Effective standard operation procedures (SOP) and safety standards should be established and applied for each stage of the dispatch and on-site response considering the fire characteristics and risk factors of each warehouse by scale.