Browse > Article
http://dx.doi.org/10.5345/JKIBC.2018.18.2.169

Analysis of BIM Impact on Preventing Rework in Construction Phase  

Lee, Myung-Do (R&D Institute, Yunwoo Technologies Co., Ltd.)
Cha, Min-Su (R&D Institute, Yunwoo Technologies Co., Ltd.)
Lee, Ung-Kyun (Dept. of Architectural Engineering, Catholic Kwandong University)
Publication Information
Journal of the Korea Institute of Building Construction / v.18, no.2, 2018 , pp. 169-176 More about this Journal
Abstract
The purpose of this study is to analyze the effects of applying BIM to the construction phase on preventing rework. Previous studies have presented the contribution of BIM in various ways, but a more practical and reliable analysis methodology are required. In this study, a BIM effect analysis methodology was proposed after collecting requirements on BIM effect analysis from field professionals. In the case study, the rework prevention effect was analyzed based on the proposed methodology. As a result, it was found that BIM application produced the rework prevention effect of approximately KRW 370,519,593. In addition, a consultation with field professionals on the suitability of the proposed methodology and effect analysis results were revealed that the results were sufficiently reliable. The results of this study can be used as efficient basic materials for research on BIM performance measurement in the future.
Keywords
building information modeling(BIM); return on investment(ROI); request for information(RFI); rework;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Azhar S. Building information modeling(BIM): trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering. 2011 Jul;11(3):241-52.   DOI
2 Giel B, Issa RRA, Olbina S. Return on investment analysis of building information modeling in construction. In: Tizani W, editors. Proceedings of the International Conference on Computing in Civil and Building Engineering; 2010 Jun 30-Jul 2; Nottingham, UK. Nottingham (UK): Nottingham University Press; 2010. p. 153-8.
3 Lee G, Park KH, Won JS. D3 city project: Economic impact of BIM-assisted design validation. Automation in Construction. 2012 Mar;22:577-86.   DOI
4 Barlish K, Sullivan K. How to measure the benefits of BIM: a case study approach. Automation in Construction. 2012 Jul;24:149-59.   DOI
5 Sacks R, Eastman CM, Lee G, Orndorff D. A target benchmark of the impact of tree-dimensional parametric modeling in precast construction. Journal of the Precast/Prestressed Concrete Institute. 2005 Jul;50(4):126-39.
6 Kuprenas JA, Mock CS. Collaborative BIM modeling case study: process and results. In: Caldas CH, O'Brien WJ, editors. Proceedings of the 2009 ASCE International Workshop on Computing in Civil Engineering; 2009 Jun 24-27; Austin, TX. Reston (VA): ASCE Press; p. 431-41.
7 Jun KH, Yun SH. Performance measurement method and case study for BIM based construction simulation system. Korea Journal of Construction engineering and Management. 2013 Jul;14(4):15-23.   DOI
8 Kim EJ, Kim JH, Huh YK. A case study on practical using of BIM in building construction, Journal of the Architectural Institute of Korea Structure and Construction. 2016 Dec;32(12):69-75.   DOI
9 Kim HJ, Yoo MY, Kim JJ, Choi CS. Performance analysis of BIM labor using case analysis. Journal of Korean Institute of Building Information Modeling. 2017 Sep;7(3):31-9.
10 Park CS, Park HT. Improving constructability analysis tasks by applying BIM technology. Korea Journal of Construction engineering and Management. 2013 Mar;11(2):137-46.   DOI
11 Lee SI, Kwon NH, Cho YS. A Case study of BIM-based framework on constructability tasks. Journal of the Korea Institute on Building Construction. 2010 Oct;10(5):45-54.   DOI
12 Lee JG, Lee HS, Park MS, Kim SY. Selecting quantifiable indicators for evaluating BIM-based design collaboration performance. Journal of the Architectural Institute of Korea Planning and Design. 216 Oct;32(10):35-43.   DOI
13 Sacks R, Barak R. Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice. Automation in Construction. 2008 May;17(4):439-49.   DOI