• Title/Summary/Keyword: 해외 건축 사업

Search Result 63, Processing Time 0.06 seconds

Preliminary Analysis of the Bid Success Ratio according to the Characteristics of Overseas Construction Projects (해외건설 프로젝트 특성에 따른 입찰 성공률 분석에 관한 기초연구)

  • Kim, Seung-Won;Lee, Kang-Wook;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.122-133
    • /
    • 2019
  • In the construction industry, bidding competitiveness is the most basic and important competence of the company. Bidding competitiveness comes from competitive advantage, but the strategy of the company to capture bidding competitiveness varies with the characteristics of the project. In particular, overseas construction is where uniqueness of the construction industry and the specificity of international business coexist. This study analyzes the bidding success ratio and the level of bidding difficulty by project characteristics with 12,952 overseas construction bidding cases. Consequently, it was found that the bidding success ratio of Middle East and North Africa (MENA) and civil engineering was the lowest in each group of project characteristics, and therefore the level of bidding difficulty is high, respectively. In addition, it was confirmed that the bidding success ratio of small size or short duration project was relatively high, and the bidding success ratio of both the negotiated bidding in the bidding method group and the private sector in the client type group was respectively high. However, Kruskal-Wallis test in contract type and period shows that there is no statistically significant difference in the bidding success ratio by group.

악재를 딛고 시공능력평가 1위 쾌거를 거둔 (주)대우건설

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.195
    • /
    • pp.63-67
    • /
    • 2006
  • 1973년 창업한 (주)대우건설은 IMF 이후 지난 2000년 그룹 해체와 WORKOUT에 들어가는 어려움을 겪었다. 그러나 전 임직원이 일심단결 해서 어려움을 슬기롭게 극복하여 2005년에는 수주 8조, 1,900억원, 매출 5조 756억원, 영업이익 4,315억원으로 업계최고의 실적을 올렸다. 또한 최근 발표한 2006년 시공능력평가에서 드디어 1위로 등극해 명실상부한 최고의 건설사로 올라서는 쾌거를 달성했다. (주)대우건설은 건축, 주택, 토목, 플랜트, 해외사업 등 건설 전 분야에서 업계최고의 실적을 유지하고 있다. 특히 주택 분야에서는 푸르지오의 브랜드를 앞세워 5년 연속 주택 공급 1위의 실적을 자랑하고 있다. 2006년 (주)대우건설은 업계최고의 기술력과 영업경쟁력, 우량재무구조를 바탕으로 수주8조 5,000천억 매출 5조 5,826억원의 경영목표를 세웠으며, 이를 위해 전 임직원이 「도전과 열정」, 「자율과 책임」의 핵심 가치를 바탕으로 오늘도 매진하고 있다.

  • PDF

종합건설업체 탐방(13)-투명.윤리경영 실천을 통해 최고 종합건설사로 발돋움하는 남광토건(주)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.7 s.204
    • /
    • pp.51-56
    • /
    • 2007
  • 1947년‘남광토건사’로 창립, 올해 60주년을 맞이한 남광토건(주)은 한국전쟁으로 피폐된 국토재건에 나서며 토목분야에 빠른 성장을 거듭했다. 국내에서는 축적된 기술력과 시공경험을 바탕으로 국내 최초 한강하저터널인 지하철 5호선 공사를 비롯, 서울지하철 2~8호선 공사를 성공리에 마쳤다. 또한 필리핀과 중동, 아프리카 등 해외 건설분야에 진출해 특히 앙골라에서만 총 55,200만 달러를 수주하는 등 괄목할 만한 성과를 나타내고 있다. 남광토건(주)은「설계가 다른 아파트」를 컨셉으로 건축미학과 편리함을 갖춘 자연친화적 아파트브랜드‘하우 스토리’를 개발, 주택사업 비중을 높이고 있으며 올해 1조3,800억원 수주와 매출 6,500억원, 경상이익 300억원 을 목표로 하고 있다. 남광토건(주)은 효율성을 극대화 하고 개개인의 역량을 최대한 끌어내 시너지효과를 창출 할 수 있도록 정비할 예정이며 투명·윤리경영으로 종합건설업계 30위권 진입을 위해 오늘도 정진하고 있다.

  • PDF

Variation Landscape Enhancement Strategy through Coloring Plan in the Busan North Port Redevelopment (부산북항재개발사업에서 색채계획을 통한 경관조성방안)

  • Kwon, So-Hyun;Lee, Joong-Woo
    • Journal of Navigation and Port Research
    • /
    • v.36 no.8
    • /
    • pp.651-657
    • /
    • 2012
  • In the Busan North port redevelopment project, which is the first large scale port redevelopment project in this country, it adopted the national landscape plan for competitiveness of port city. Furthermore, it includes many efforts on landscape formation in the process of improvement of ocean city image and enhancement of its value, which fits for the situation and characteristics of the original nature, history, and culture resources, together with all facilities, structures, symbols, and eco green belt. Firstly this study attempted to analyze the characteristics of Busan landscape, Busan city design plan(2010), especially coloring plan, together with the case study of landscape color plan for foreign countries. From the basis of this analysis, it was proposed a landscape enhancement strategy in the Busan North port redevelopment project through the coloring plan and it is expected that the result would be used for the basic data for other redevelopment project.

Research to define facility type, project consideration and restriction when conceiving civil-military sharing facilities, by applying the Delphi technique (델파이기법을 활용한 민군간 공용 시설유형 및 고려요소 판단 연구)

  • Gong, Keum Rok;Kang, Han-Seung;Ahn, Jin-Ho;Park, Young Jun
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.2
    • /
    • pp.57-66
    • /
    • 2018
  • When developing projects to build facilities to be shared by both military bases and surrounding communities, strategies are needed to achieve two objectives: 1) minimize missteps and opposition from local communities in the process of developing and implementing such projects, and 2) promote cost-benefit optimization and user-satisfaction. With aim of promoting co-operation and co-existence between military bases and adjust communities, this research proposes esthetical factors to be considered in conceiving civil-military sharing facilities. It seeks experts' opinions on the development of civil-military sharing facilities, and examines critical factors (economic feasibility, security, and satisfaction, etc.) for project development as well as building types suitable for shared-use between military bases and local residents. It then establishes a method to prioritize facility-type and narrow down design factors (considerations and restrictions) in project development by applying quantitative analysis. The methodological approach of the research employs the Delphi survey method to quantitatively analyze qualitative information drawn from experts' opinions. At the first round of the survey, facility types, items for consideration and restrictions are drawn, and then at the second round of the survey, criticality of each item is analyzed. Finally, it reaches a conclusion on suitability of facility types for civil-military sharing facilities, and selects project considerations and restrictions when developing this kind of project.

Framework and Core Competency of Integrated Design Management (IDM) (통합설계관리의 개념적 틀 및 역량강화 요소 - 건축과 플랜트를 중심으로 -)

  • Kim, Yesol;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.122-133
    • /
    • 2014
  • Recent diversification of project delivery systems coupled with increasing mega-projects requires highly advanced construction management techniques. Among those techniques, procurement and design management are recognized as being the first priority for overseas construction projects. Nevertheless, previous research in design management has been limited to the quality management of the design documents at design stage. Therefore, it is necessary to explore the design management from a comprehensive perspective throughout the project life cycle. In this context, the purpose of this paper is to propose a conceptual framework for integrated design management (IDM). Several different concepts in relation to design management were investigated first in order to identify the major variables of the IDM framework. A comprehensive comparison of construction management methodologies was also analyzed in order to identify key factors of IDM. Finally, an IDM framework was proposed by combining those factors and relevant issues. Based on the proposed framework, a survey was conducted in order to validate the framework as well as to identity important areas for improving competitive capability of Korean construction companies.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

Survey study on planning direction of integrated model for the disabled and the elder - Focusing on the case of foreign country - (장애인 및 노약자의 생활시설 통합모델 설정을 위한 조사연구 - 해외 시범사업 사례를 중심으로 -)

  • Kang, Byoung-Keun;Seong, Ki-Chang;Park, Kwang-Jae;Yun, Young-Sam;Kim, Sang-Woon;Lee, Joo-Hyung
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.15 no.2
    • /
    • pp.23-30
    • /
    • 2009
  • The purpose of this study is to suggest planning directions of architectural integrates model by analysing the foreign case of integrated services for the aged and the disabled. For this study, we have researched on three different aspects. Three aspects are the element of barrier-free, architectural planning, information technology and operation. Based on the analysis of overseas examples, the good circumstance for both the disabled and the elder as one of member in the local societies could be defined like the following conditions: that is, (1) IT technology facilitates both barrier-free architecture and life to be easier and safer, and (2) both the disabled and the elder in local societies live together with the non-disabled in the same community. To realize this purpose, for a short-term plan, the system of feedback, examining the results of the research through the examples of housing plan, should be improved. In addition to, the system of public service, such as introducing the institutes for social educations, should be developed to result in the change of social insight. For a long-term plan, the whole society should have the research and plan of the unified model in a dimension of cities, where the network of public welfare is deeply associated with the system of the architecture, traffic, streets, and living-supporting information.

  • PDF

Suggestion for Integrated Process Quality Control for Facility Management of Smart City at Construction Stage (Smart City 시공단계 시설물 통합품질관리 프로세스 제안)

  • Park, In-Woo;Kim, In-Han;Choi, Jung-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.6
    • /
    • pp.535-544
    • /
    • 2016
  • Korean government is promoting "K-Smart City" to overseas market which is an integrated solution of construction industry with ICT(Information and Communciations Technologies) industry. Due to nature of Smart City, construction quality and the development quality of the facilities need to be established to improve the overall quality. However, guidelines and regulations to initiate quality control for Smart City are behind the actual demand. This deficiency is bringing quality control for construction and ICT to be controlled separately causing lack of synergy and resulting in overall quality degradation. This research is designed to improve the construction quality of Smart City during its establishment stage by integrating ICT system with on-site construction (Integrated control center and on-site equipment). The adoption of this research to a real Smart City case had resulted in 22% reduction of construction inspection failure (Audit), and also allowed Construction Company to pre-align quality control of all purchased items of ICT Infra that resulted in 18% reduction of nonconformity, thus contributing to an overall quality improvement. This research is expected to be used widely among all construction industry of Smart City.

A Study on Site Evaluation Process for Thalassotherapy Complex (해양치유단지 조성을 위한 입지평가프로세스에 관한 연구)

  • Lee, Han-Seok;Doe, Guen-Young;Kang, Young-Hun
    • Journal of Navigation and Port Research
    • /
    • v.43 no.3
    • /
    • pp.219-230
    • /
    • 2019
  • The objective of this study is to suggest the evaluation method, the evaluation index and items, and evaluation criteria for rational and systematic evaluation of the thalassotherapy complex site. Evaluation items and indicators are determined based on overseas cases of thalassotherapy complex, the central governments' thalassotherapy business policy, and the local governments business plan. 3 major evaluation items, 8 middle evaluation items, 5 small evaluation items and 26 evaluation indexes are selected as evaluation items. The evaluation criterion for each evaluation index is then determined. As per the evaluation process, first, weights are assigned to the evaluation items by an evaluation committee composed of experts. Secondly, each committee member assigns a weight and a score to each evaluation indicator for evaluation score calculation. This score is then multiplied by the weight of the evaluation item to determine the final score for each evaluation index. The ultimate scores of all the evaluation indexes are then added to the evaluation score of each committee member. Lastly, the arithmetic mean of the evaluation scores of all committee members becomes the final evaluation result of a site.