• Title/Summary/Keyword: 하자 분석

Search Result 206, Processing Time 0.024 seconds

Studies of the Membrane Formation Techniques and Its Correlation with Properties and Performance: A Review (막 형성 기술 및 특성과의 상관관계 연구 및 성능: 리뷰)

  • Kumari Nikita;Chivukula Narayana Murthy;Sang Yong Nam
    • Membrane Journal
    • /
    • v.33 no.3
    • /
    • pp.110-126
    • /
    • 2023
  • In this review, the approaches, properties, and elements involved in the formation of polymeric membranes for various materials are discussed. The present research emphasizes the proficiency in several membrane formation processes such phase inversion, interfacial polymerization, stretching, track etching, and electrospinning. Additionally, the obstacles and applicability of various application manufacturing processes are addressed. Various polymeric membranes are reviewed with regard to significant surface properties such as surface roughness, surface tension, surface charge and surface functional group. Additional enhancements of popular membrane formation processes like phase inversion and interfacial polymerization are required to ensure advancements in membrane efficiency. Analysing the possibilities of modern manufacturing practices like track etching and electrospinning is also crucial.

A Study of The Present State Analysis and Development Plans About Construction Monitoring and Monitoring Industry (건설 계측 및 계측업의 현황 분석과 발전 방안 연구)

  • Woo, Jong-Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.163-169
    • /
    • 2010
  • Construction monitoring and monitoring industry have been rapidly developed with advance of IT industry and telecommunication. However institutional, legal supports that need to settle the construction monitoring are practically inadequate. So development plans that are reflected enquete results about the present state of construction monitoring are considered. A way that consider establishment Korea construction monitoring association and society, deal with relevant law appointing monitoring industry, consider enactment and revision of construction monitoring design standard and specifications, appoint practical construction monitoring educational institution, appoint an efficiency test specialty institution of monitoring equipment, consider the term of guarantee of monitoring equipment consider enactment and revision of estimating cost of construction measurement, consider ratio of monitoring equipment loss for developing construction monitoring and monitoring industry are proposed.

Classification and Analysis of Characteristics of Changes in Apartment Landscape Work (아파트조경공사 설계변경의 유형분류와 특성분석)

  • Park, Chun-Soo;Park, Seung-Burm
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.1
    • /
    • pp.28-42
    • /
    • 2009
  • In the wake of categorizing the design changes occurred during the period from 2004 till the first half of 2006 in Choongcheong province area, based on purpose and reason of design changes identified by the Korea National Housing Corp, it included 11 types such as the image of the apartment complex, scenic elements, consideration by the user, prevention of the defect, constructability, site conditions, incompatibility between the activities, superordinate standard, prevention of civic complaints, design details and others, along with 47 subordinate elements. And the evaluation intended to identify the corelation between the number and time of design change approval, frequency and scale of design change by type and the cost variations indicated that; firstly, enhancing the image of the apartment complex proved to be the main reason for design changes, accounting for 22% in terms of frequency and 54.9% in terms of cost variation. Secondly, the higher the increase in cost by design change aimed at improving the image of the complex, the lower the decrease in cost by design change for uncertain reasons, dubbed the inverse proportional relations, indicating that the design changes for uncertain reasons were mostly aimed at reducing the construction cost. Thirdly, with regard to the number of design change approval and the time of the initial approval, twice or less and 90 days or less before completion of the construction work, respectively, accounted for $52{\sim}53%$, indicating the design change deliberation and approval tended to have been carried out collectively in the form of ex post facto approval, which seemed to be attributable to the attempt of reducing the construction cost or budget problem, as a result of comparing with the cases in which the cost was reduced.

Management Period Setting Study of through Analysis of the Growth Amount after Planting of Deciduous Broadleaf Species Planted in Ecological Restoration Sites (생태복원지에 식재된 낙엽활엽수종의 이식 후 생장량 분석을 통한 관리기간 설정 연구)

  • Lee, Soo-Dong;Bae, Soon-Hyoung
    • Korean Journal of Environment and Ecology
    • /
    • v.36 no.5
    • /
    • pp.496-506
    • /
    • 2022
  • The growth of trees planted through transplantation rapidly decreases immediately after planting due to extreme disturbances such as root cutting and crown damage. Although the growth rate is recovered as time elapses, the time required to restore the original growth varies by species. Therefore, it is necessary to set an appropriate tree management period for survival after transplantation by analyzing each species' annual growth change. In this study, we analyzed the growth amount of deciduous broad-leaf species planted in the area where the riparian ecological belt was formed and proposed the management period based on the results. Slowed growth immediately after planting is a common phenomenon due to root cutting and pruning, the pre-works performed to increase tree survival rate during the transplantation process. Afterward, the original growth rate is recovered as time passes, but the time required may vary depending on the species and planting environment. Most of the trees showed a rapid decrease in growth immediately after transplantation. After that, although it is different for each species, most of them showed a gradual recovery from 2 years onwards. The analysis of the growth rate by tree species confirmed that it took 2 to 4 years, depending on the tree species, to recover the growth level before transplantation after a rapid decrease in growth immediately after transplantation. The results suggest that improving the defect rate of planted trees is necessary to meet the project objectives: ecological restoration and pollutant reduction. It requires setting a tree management period of at least two years and creating an appropriate base environment.

An Analysis of the Mechanism of Crack Stop-bar for Floor Plastering of Apartment Buildings (공동주택 바닥미장 균열차단막의 메커니즘 분석)

  • Song, Yong-Sik;Lee, Dong-Hoon;Lee, Sung-Ho;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.4
    • /
    • pp.333-344
    • /
    • 2011
  • The recent expansion in the number of housing construction projects has been accompanied by substantial improvements in construction quality, which can be attributed to the development of new construction technologies and materials. In apartment complex construction projects, numerous mechanization technologies have been adopted as part of the floor plastering process to counter increasing difficulties in securing labor and the pressing need to reduce lead time, but these have also triggered setbacks such as additional costs or loss of time to fix cracks in or loosening of floor. Cracks developing in the floor of an apartment housing unit, in terms of materials in use, are the products of a complex combination of material makeup, construction workmanship, concrete curing and the protection method. Controlling such elements from the perspective of materials in use may ensure partial success in reducing cracks, but fall short of eliminating them completely. Any attempt to prevent cracks from developing in the first place requires systematic analysis as to their potential causes and viable solutions to reduce them. On this backdrop, this paper aims to provide an analysis of potential causes of cracks found in floor plastering, and consider the mechanism of a crack stop-bar as a fundamental safeguard against them.

Deduction of Considerations During Design and Construction by Analysing Domestic and Abroad Case Analysis of Freeform Building Envelope (국내외 비정형 건축물 외피시스템 사례 분석을 통한 설계 및 시공시 고려사항 도출)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.84-96
    • /
    • 2013
  • Recently, architectural design has been changing from formal design to freeform design due to the digitalization of construction industry. Especially, the formal design has been accepted as a design trend recently and applied many times as a design concept in the architectural design competitions such as turn-key. However, various deflects such as water leak and cracks have been occurred because the traditional construction methods had been applied without any revision or adaptation of the formal construction method for the freeform building construction. Design and construction of freeform building has been developed as an new method in order to solve the problems and minimize the construction duration and cost for the freeform building. Therefore this research deduced the positive implications for developing freefrom envelope by analyzing the domestic and abroad cases and proposed the considerations during design and construction of the freeform envelope as follows. First, the freeform design should consider the constructability for the freeform envelope. Second, manufacturing technology for the two-way curvature of the unit panel should be developed. Third, exposed concrete form method should be developed for the freeform envelope of concrete. Forth, material characteristics, construction method and facility management should be considered in order to manage precipitation and keep water-proof according to the classification of the freeform envelope area.

Proposal of a Classification System of Checklists for Safety Management of On-Site Workers in Modular Construction (사례분석을 통한 모듈러 건축의 현장 작업자 안전관리 체크리스트의 분류 체계 제안)

  • Jun, Younghun;Kim, Kyoontai;Jeon, Eunbi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.120-130
    • /
    • 2021
  • Recently, the government is reinforcing safety management at construction sites to prevent safety accidents in construction works, and the safety management plan of workers is an important situation. Meanwhile, modular construction is expected to be gradually expanded to middle and high-rise buildings, but active measures to ensure worker safety are insufficient. This study is a preliminary study of the development of a checklist for preventive worker safety management. The purpose of this study is to derive a checklist classification system for the safety management of workers in the field of modular construction by preceding studies, case analysis, and expert advisory opinions. The classification system consists of large categories of factory manufacturing, transportation, and on-site construction, and the sub-system consists of six sub-classes: foundation work, frame work, modular frame installation work, finishing work, and facility work. Among them, the sub-classification of modular frame installation work consists of 12 unit works, centering on module lifting and assembly module work, which are the main construction processes. And the classification system reflects the three main management factors and contents for defined safety management. It is expected that the research results of this study can contribute to efficient safety management at the modular construction site.

A Study on Improving Architect Property Insurance for Safety Accidents of Building (건축물 안전사고에 대비한 건축사 손해보험 개선 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.32-40
    • /
    • 2019
  • This study analyzed operating condition and the problems of damage compensation insunace (property insurance) for qualified architect and derived some suggsetions for improvement. The Certified Architects Act requires all building design and construction supervision to buy property insurance. This study proposes following suggestions to solve problems of current architect property insurance. Firstly, we need to increase the insurance purchasing rate of damage compensation insurance for qualified architect. It is necessary to clearly specify the matters concerning the submission of insurance policies by the architects, which is currently carried out by the Minister's official letter, in the form of official announcement. Secondly, proper insured amount should be adjusted. In order to insured substantial compensation capacity, total amount of insurance should be enlarged. Thirdly, the insurance period should be extended to one year after completion of building to allow compensation for accidents due to design negligence. Generally, the design defect can mostly be identified within one year after completion. Fourthly, insurance coverage should be extended. In the long run, it is essential to enlarge the scope of the security not only to property damage but also to human losses. Finally, an accident record sharing system should be established among insurance companies, so that proper insurance premiums or discounts can be made based on the system.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

A Analysis of Teachers' Perception of the Chemistry I & Chemistry II in the 7th National Curriculum and Their Demands on Curriculum Revising (제7차 고등학교 화학 선택 교육과정에 대한 교사들의 인식 및 요구 분석)

  • Hong, Mi-Yeong
    • Journal of the Korean Chemical Society
    • /
    • v.50 no.5
    • /
    • pp.394-403
    • /
    • 2006
  • purpose of this study was to analyze high school chemistry teachers perception of the Chemistry I & Chemistry II in the 7th national curriculum and their demands on the revision of curriculum. A nationwide survey was administered to obtain the responses from 108 high school chemistry teachers. More than half of the participants thought the current curriculum of Chemistry I and Chemistry II needed revising. As the results, a major drawback of Chemistry I was a difficulty in explaining phenomena due to absence of basic concepts, and that of Chemistry II was an excess of the contents for high school science courses. Unfortunately, it was found out that inquiry activities existed only in name, especially in case of Chemistry II. Regarding the manner of content organization of Chemistry I in new curriculum, demand on a concept-based approach outnumbered theme-based approach. For revising Chemistry, the majority of participants demanded basic chemistry concepts to be introduced, without supplementation of quantitative approaches and deepening level of concepts. An urgent request for Chemistry II was reducing content by shifting relevant concepts to Chemistry I. Implications for high school chemistry education including revising curriculum were discussed.