• Title/Summary/Keyword: 프로젝트 성공요인

Search Result 216, Processing Time 0.023 seconds

ERP System Education/Training and Other Related Factors Which Have Critical Influence On ERP Implementation Success (ERP 시스템 성공을 위한 ERP 시스템 교육/훈련 및 관련 요인 분석)

  • Kim, Yeong-Real
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.13 no.3
    • /
    • pp.100-109
    • /
    • 2008
  • In the 1990s and 2000s there was considerable growth in implementation of Enterprise Resource Planning(ERP) Systems. It is estimated that the ERP market will grow to about $65 billion by 2009. Companies expect these systems to support many of the day to day business transactions. However, the implementation projects of ERP are big, strategic and complex projects which involve lots of time, scope and costs. Because of that, companies have to create conditions, in which they can implement chosen solution in expected time, scope and budgeted costs. This means that companies should be aware of what most critical factors for success of ERP implementations are. This study will first investigate the ERP implementation CSFs by studying prior published researches on the field of ERP implementation. Then, this study will discuss in depth some important factors of ERP implementation and represent preliminary results CSFs of ERP implementation empirical survey.

  • PDF

Online Document Mining Approach to Predicting Crowdfunding Success (온라인 문서 마이닝 접근법을 활용한 크라우드펀딩의 성공여부 예측 방법)

  • Nam, Suhyeon;Jin, Yoonsun;Kwon, Ohbyung
    • Journal of Intelligence and Information Systems
    • /
    • v.24 no.3
    • /
    • pp.45-66
    • /
    • 2018
  • Crowdfunding has become more popular than angel funding for fundraising by venture companies. Identification of success factors may be useful for fundraisers and investors to make decisions related to crowdfunding projects and predict a priori whether they will be successful or not. Recent studies have suggested several numeric factors, such as project goals and the number of associated SNS, studying how these affect the success of crowdfunding campaigns. However, prediction of the success of crowdfunding campaigns via non-numeric and unstructured data is not yet possible, especially through analysis of structural characteristics of documents introducing projects in need of funding. Analysis of these documents is promising because they are open and inexpensive to obtain. We propose a novel method to predict the success of a crowdfunding project based on the introductory text. To test the performance of the proposed method, in our study, texts related to 1,980 actual crowdfunding projects were collected and empirically analyzed. From the text data set, the following details about the projects were collected: category, number of replies, funding goal, fundraising method, reward, number of SNS followers, number of images and videos, and miscellaneous numeric data. These factors were identified as significant input features to be used in classification algorithms. The results suggest that the proposed method outperforms other recently proposed, non-text-based methods in terms of accuracy, F-score, and elapsed time.

A Study on CSFs in the 4th Industrial Revolution (제4차 산업혁명의 성공요인에 관한 연구)

  • Sung, Tae kyung
    • Journal of Service Research and Studies
    • /
    • v.10 no.1
    • /
    • pp.69-83
    • /
    • 2020
  • The purposes of this study is to identify the critical success factors for the 4th industrial revolution through literature review and to empirically evaluate the validity of these factors through questionnaires from executives engaging in the industries of the 4th industrial revolution. Literature review identifies leadership, change management, top management support, strategic fit, training, empowerment, teamwork, organizational culture, communication, and project management as ten critical success factors, Questionnaires were administered to CIOs and CEOs in the industries belong to the 4th industrial revolution. Response rate was 64.4% which shows quite high participation. Respondents rated strategic fit as the most important factor, followed by top management support, leadership, change management, project management, teamwork, communication, training, organizational culture, and empowerment. To successfully pursue the 4th industrial revolution, the followings are recommended. (1) detailed and refined execution strategy, (2) establishment of effective network among government, public companies, research institutes, universities, and industries, (3) strategic and long-term plan, (4) differentiated execution strategy from other countries and global cooperation system.

Effect of PMIS Quality on Intention to Use and User Satisfaction (건설 PMIS 품질이 사용의도 및 사용자 만족도에 미치는 영향)

  • Sung, Min-Woo;Kim, Ka-Ram;Lee, Seul-Ki;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.122-132
    • /
    • 2012
  • Establishing a success model of a specific information system is critical to understanding the mechanism of IS success, the various dimensions of IS performance, and the factors and their causal relations in IS success. As one of the key IT applications, the project management information system (PMIS), particularly the web-based PMIS (Web-PMIS), has played a significant role in construction management processes in Korea. However, there have been few research attempts made to construct a Web-PMIS success model. This study primarily aims to propose a Web-PMIS success model based on DeLone and McLean's IS success model, and to discuss whether or not the D&M IS success model can be applied to the construction Web-PMIS. A questionnaire was sent out to Web-PMIS users (construction managers and constructors), and 253 completed questionnaires were received. Through multi-regression analysis, it was confirmed that it is statistically acceptable to apply the D&M IS success model to the Web-PMIS. However, the explanatory power of the model is not sufficient, and some of the model factors are not statistically significant enough. Relying on the statistical analysis results, this study also discusses the development direction for the Web-PMIS success model.

A Study Of the Construction Management Applied to BAT Korea Factory Construction Project in Korea (BAT Korea Factory 건설 프로젝트의 CM 적용사례 연구 - Cost Management 사례를 중심으로 -)

  • Kim Duk-Kon;Kwon O-Kyung;Kim Jong-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.48-57
    • /
    • 2003
  • BAT Korea's Factory is the one of the major projects that clearly confirms and demonstrates that Construction Management (CM), provided by a Korean CM Company to the foreign clients, enables them to successfully complete projects; with savings in time and reduction in cost, which it is $15\%$ lower than the cost of the overseas construction. Also, throughout the thorough schedule management, it was possible to commence with manufacturing one month after the completion date. The Key Success Factors was generated by the excellent construction management skills, and more importantly by the confidence gained by the client in giving a CM company full authority for the construction management of the project. This study has focus on elements of construction management applied to this project throughout the concept of 'One Stop Shop', including cost managements, contract management and value engineering etc. We hope that this study will provide useful data to enable public clients to take advantages of construction management, in a similar way to. the private clients, who have already implemented CM actively.

  • PDF

A Study on Antecedents of Cognitive and Affective Trust Leading to IT Service Project Performance (IT서비스 프로젝트에 있어서 인지적 신뢰와 정서적 신뢰를 형성하는 요인들에 관한 연구)

  • Yoon, Jungin;Park, Jun-Gi;Lee, Jungwoo
    • Information Systems Review
    • /
    • v.16 no.1
    • /
    • pp.51-71
    • /
    • 2014
  • This study explores the influence of cognitive and affective trust on IT service project performance. Technology and Business expertise are posited as antecedents for cognitive trust which social bonding and relationship conflict as over for affective trust. Communication is posited as the commons antecedent for both kind of trust. A study was administered among IT Project leading in different projects. Analysis of 169 data point in general supports the research model. For building cognitive trust, Communication is formal to be must important while business expertise the second and technical expertise the third. For affective trust, the influence of antecedent are relatively smaller than the case of cognitive trust. For project performance, Cognitive trust seem to have stronger impact as IT may have direct impact as well as indirect impact via affective trust. Findings trust though the impact is smaller than the cognitive trust. In practice, this means to maintain Balanced approach in fostering trust-cognitive and affective.

A PMO Function Study through RFP Analysis of Financial Next- Generation Project (금융권 차세대 프로젝트 제안요청서 분석을 통한 PMO 기능 연구)

  • Choi, SeongJun;Lee, SeoukJoo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.10a
    • /
    • pp.932-935
    • /
    • 2015
  • 여러 산업 분야에서 신기술 도입 및 고객의 요구 사항 변화에 따라 급속한 정보화가 진행 중이다. 정보 시스템을 주요 기반으로 한 금융산업의 경우, 이러한 변화에 대응하기 위해 상당한 규모의 차세대 프로젝트를 진행하고. 이를 통해 기업은 법률, 규제 및 고객 요구 사항 등 외부 요인에 신속히 대응하고, 내부 프로세스 개선을 통해 기업의 가치를 성장시키려고 한다. 차세대 프로젝트란 기업이 반드시 성공시켜야 하는 프로젝트로, 금융권은 프로젝트 성공률을 높이기 위해 PMO 제도를 도입하고 있는 추세이다. 본 연구는 프로젝트 준비단계 산출물인 제안요청서 (RFP)를 국제 프로젝트 관리 표준인 ISO 21500 (Guidance on Project Management)을 기준으로 제안요청서 (RFP)가 프로젝트 성공에 필요한 제반 기능과 정보를 포함하고 있는지 분석하였다. 분석 결과 차세대 금융 PMO의 RFP는 ISO21500의 기준과 상당한 차이가 있음을 발견하였다. 향후 제안요청서(RFP) 작성의 중요성을 인식하고, ISO21500 관리 기준에 맞춰 기능을 개선하고 보완해 나간다면 프로젝트 성공률을 높일 수 있을 것이다.

Integrated Project Delivery in the Pre-construction Phase : Case Study of IPD for Lean Construction (사례 연구를 통한 Pre-con 단계의 린 건설 기반 IPD 프로젝트 적용 방안 도출)

  • Jang, Hanbyeol;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.11-22
    • /
    • 2019
  • Current construction project processes pose difficulties for construction management as inefficient communication between project participants seldom accurately reflects the needs of the owner. To solve this problem, lean construction-based Integrated Project Delivery (IPD), which facilitates cooperation and builds trust through the formation of horizontal relationships among participants, is becoming increasingly popular. However, although lean construction-based IPD improves productivity in the construction industry, few studies have focused specifically on developing effective methods that maximize the benefits gained from lean construction-based IPD. This study therefore analyzed success factors for lean construction-based IPD projects by analyzing prior studies to identify factors that support IPD success. Application methods were analyzed and an example of how they are actually used in the field was examined through an in-depth single case analysis. The findings of this research can be applied to support lean construction-based IPD projects in Korea, improving their efficiency and boosting owner satisfaction.

Knowledge/Skills and Career Path of IS Project Managers (IS 개발 프로젝트 관리자의 지식과 기술 그리고 경력개발경로)

  • Moon, Yong-Eun
    • Information Systems Review
    • /
    • v.4 no.2
    • /
    • pp.343-360
    • /
    • 2002
  • Ideal project manager is a critical factor for successful IS development. The purpose of this paper is to investigate the knowledge and skills requirement of IS project managers and to suggest ideas of a career path development for powerful IS project managers. From a previous research work, this paper was conducted to classify 6 domains-strategic management, business function, innovation, general management, personnel management, and technical expert- as knowledge and skills of IS project managers, and to generate IS project manager's career path which is developed through engineer, analyst and designer, planner, and project leader. The results provide a good framework to train and develop knowledge and skills of IS project mangers.

A Stochastic Network Simulation Model for Project Risk Analysis (확률적 네트워크 Simulation 방법을 이용한 프로젝트의 위험분석모델)

  • 황흥석
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2000.11a
    • /
    • pp.16-21
    • /
    • 2000
  • 본 연구는 대형 프로젝트의 위험분석을 위한 확률적 Network 시뮬레이션모델의 연구로서 Simulation방법으로 프로젝트의 성공 및 실패확률을 산정 하였다. 프로젝트의 주요 불확실성 요소(Uncertainty Factors)인 프로젝트의 수행기간(Time), 비용(Cost) 및 성과(Performance) 등의 계획은 실패 없이 추진되어야 하는 것이 중요하다. 연구 개발 및 신기술개발과 같이 대형 프로젝트의 경우, 그 성과 달성의 위험(Risk)성은 매우 크며 이러한 위험 예측 및 분석이 프로젝트의 성공적인 수행을 위하여 매우 중요 시 된다. 본 연구에서는 이를 위한 위험분석(Risk Analysis)의 방법으로 일반적으로 쉽게 사용할 수 있는 위험요인법(Risk Factor Analysis)과 확률적 Network 시뮬레이션모델을 제시하였으며 또한 이를 위한 Simulation프로그램을 개발하였으며 이를 신 기술개발 프로젝트에 응용하는 과정을 보였다. 본 연구에서 개발된 관련 프로그램을 보완 할 경우 대형 프로젝트의 각종 의사결정 시에 매우 유용하게 활용될 수 있으리라 생각된다.

  • PDF