Korean Journal of Construction Engineering and Management
/
제10권4호
/
pp.38-49
/
2009
In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.
Korean Journal of Construction Engineering and Management
/
제12권5호
/
pp.117-126
/
2011
With Public-private partnership PF (project financing) deals saw explosive increase in quantity since its introduction to Korea in 2001, but, met with severe recession in the fallouts of the financial crisis that hit the global economy in 2008. This study intends to identify the risk factors corresponding to issues of public-private partnership projects financing structure and classify and analyze them by project phase. Outcomes of this research are expected to help recognize risk factors in each project phase during project planning and develop risk control and mitigation strategy during project implementation.
정부는 1단계 광산업 집적화 프로젝트를 2003년까지 추진하여 국내 광산업도약의 기틀을 마련하고, 2010년까지는 2단계 프로젝트로서 산업경쟁력 강화시책을 본격 추진해 명실 공히 광산업을 선진국 수준으로 끌러올린다는 단계별 발전전략을 추진하고 있다. 우선 1단계에서는 광주지역을 광산업 집적화 단지로 삼아 한국광산업진흥회, 한국광기술원 설립 등 물리적인 인프라 구축, 요서기술 개발, 인적자원 개발, 정보화 및 시장정보 데티어베이스화, 광관련 중소ㆍ벤처기업지원을 중점 추진하며, 이를 위해 국비, 지방비 및 민자를 포함해 총 4천 20억원을 추입해오고 있다. 이러한 투자는 국내 광산업의 세계시장 점유율을 현재 5%에서 2010년에는 15%까지 끌어올리는 동시에 9만명 이상의 고용효과를 창출을 목표로 하고 있다.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
한국건설관리학회 2007년도 정기학술발표대회 논문집
/
pp.277-282
/
2007
Construction process works in sequence order and there are many different software for managing project and activity. So, there are many limitations such as in the stage of activity data loss can occur, in each stage concurrent cannot operate in construction industry. In order to solve these problem, agents have to cooperate each other and they need to share of data. Therefore, the purpose of this paper is to develop a process model and the process model will be use in the future to make Construction Project Life-Cycle Management based on concept of PLM(Product Life cycle Management) in the manufacturing industry, CE(Concurrent Engineering) and BlM(Building Information Modeling)
정보시스템 감리 시 시간적인 제한과 제한적인 검토로 인하여 문제점 도출에 한계가 있다. 이로 인하여 정보화계획 수립, 분석, 설계, 구현단계 산출물과 시스템에 대한 지적사항이 단편적으로 된다. 본 연구에서는, 정보시스템 감리 보고서에서 지적되었던 프로젝트관리에 대한 검토사항 및 지적사항을 유형별로 분석 하여, 체크리스트를 개선하였고, 이를 적용하여 프로젝트 관리를 효과적으로 하도록 제안하였다. 개선된 체크리스트를 이용하여 정보화 사업관리자가 관리의 포인트로 활용할 수 있고, 감리 시 생산성을 높이며 정보시스템 감리의 품질이 향상 될 것이다. 본 연구에서 제안한 개선된 체크리스트는 향후 자료를 보완하고 유형별 사례를 보완하면 프로젝트 관리 성과 측정 툴로서도 활용될 수 있을 것으로 기대한다.
The Journal of Korean Association of Computer Education
/
제22권2호
/
pp.39-50
/
2019
We designed and applied team project based learning for effective computer programming education and analyzed the effect on learning effect. Throughout simplified traditional theories and practices, teamed up with random lottery, divided role & responsibility, and conducted problem solving projects in a competitive way for a given task. When after completion of the course, we conducted questionnaires on learners in order to grasp the influence factors on the learning effect. As a result of the structural equation model analysis, it was shown that Team Project had a direct effect on the learning effect. The learning effect based on the relationships among the factors derived through exploratory factor analysis. Based on this analysis, we propose a more effective computer programming education way.
Proceedings of the Korea Information Processing Society Conference
/
한국정보처리학회 2010년도 춘계학술발표대회
/
pp.1020-1023
/
2010
소프트웨어 개발은 복잡도가 높고 가시성 확보가 어려워 전략적으로 접근해야 한다. 일반 개발 프로젝트에서 개발 전략은 특정 개발 모델과 프로젝트 관리 기법을 사용하겠다는 것이 주류를 이루고 있다. 이러한 방법은 각 개발 단계에서 업무를 진행하는 프로젝트 참여자가 프로젝트 전체를 보지 못하고 각자의 전문 분야만을 국지적으로 개발하여 초기에 의도된 대로 개발되지 않는 결과를 초래하는 경우가 다반사여서 개발 전략으로서의 역할을 적절히 수행하지 못하는 문제가 있다. 본 연구에서는 리스크 기반의 개발 전략을 제시한다. 개발 프로젝트 전체는 물론 개발의 각 단계 별로 전략이 존재할 수 있으며, 전사 차원과 프로젝트 차원의 전략이 존재한다. 분석한 리스크 레벨에 차등적으로 개발 리소스를 할당하고, 개발 기법을 사용하고, 리뷰 및 검증 활동을 진행하여 제한된 개발 리소스를 합리적이고 적절하게 사용하여 개발하고, 개발 과정을 모니터링 및 제어하는 접근법이다. 이미 개발의 일부인 테스팅 분야에서는 리스크 기반 테스팅 전략이라는 이름으로 활용하여 직간접적인 효과를 보고 있으며, 같은 개념을 개발 전체로 확장하여 개발 전략으로 체계화하여 제시한다.
The Journal of Korean Association of Computer Education
/
제19권4호
/
pp.45-58
/
2016
This paper tried to analyze cases of one year team-based project of gifted students who spent two year programs in a math-IT integrated class as part of formative evaluation and extracted the factors associated with future enhancement for the program. The researcher as an advisory professor tried to guide the students as minimally as possible considering their levels of IT skills so that they could self-directedly perform the IT-fused project on a team basis. The data collection included documents, annual report, photos, video, artifacts and interview data with the students for the whole team project carried out between February and December, 2015. The overall pattern of the project activities has been stabilized in the middle of the course compared to the initial stages of brainstorming and design work even though the students revealed the differences of their programming skills and preferences toward the project theme. Their project outcomes were qualitatively analyzed according to the 9 steps of R&E model and has shown individual differences according to low, middle and high level. At the end, the analysis suggested several implications for further improvement of the mentorship program.
Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort varies according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differs from one project to another. This paper suggests models for effort allocation in planning, specifying, building, testing and implementing phases followed by the project size and development types. These models are derived from 155 different projects. Therefore, these models can be considered as a practical guideline in management of project schedule and effort allocation.
Journal of the Korea Academia-Industrial cooperation Society
/
제16권7호
/
pp.4897-4911
/
2015
Technology developments accelerate the change of the society and companies with unparalleled pace, so large scaled projects are in progress urgently. Large scaled projects deal with high technologies and massive tasks, and these need enormous labor force and costs, it is necessary to manage strategic conflicts based on human psychology and complex system theory. However, traditional management plan fails to suggest practical mechanism for successful projects. We study failure cases and key elements, leadership for projects, and suggest project management plan with psychological and behavioral economy approach by focusing on complexity and conflict structure on large scaled projects. Project behavior management plan, suggested in this study, is designed with phased strategy and practice to solve the failure of large scaled IT projects originally and preemptively. We verified the effectiveness of behavior management plan suggested by investigating experts and working groups, and stable projects are to be progressed with introducing this plan on large-scaled projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.