• Title/Summary/Keyword: 프로젝트성과

Search Result 920, Processing Time 0.033 seconds

A Study on the Establishment of Priority for IT Project Management Using AHP (AHP 기법을 이용한 IT 프로젝트 관리 우선순위 수립에 대한 연구)

  • Kyung, Tae-Won;Kim, Sang-Kuk
    • Information Systems Review
    • /
    • v.9 no.3
    • /
    • pp.157-181
    • /
    • 2007
  • Main concerns of IT project managements are concentrated on the output control and process management. IT project, however, is difficult to measure the quality of achievement, because it produces invisible and intangible outputs. Many studies have been carried on to quantify the intangible aspects of process management. However, most of them have been focused on the technological aspects. This study measures the priority of factors to manage IT project by applying the IT-BSC and PMBOK method. Established indexes include the factors of managerial, social and future-oriented perspectives to check the different aspects of project management over the technical factors. This study uses AHP method for quantitative measurement. This study can be meaningful because of following reasons. First, this study re-arranges IT project management evaluation indexes by balanced scorecard. Second, this model includes human factors of developers and users who are directly related to the project development and operation. Third, important items of each stakeholder have been separated, and the weights of each item have been quantified to have fixed values.

The Team Structure Design, Team-Coaching, Team Development, and Team Performance of Cross-Functional Project Team (다기능프로젝트팀의 설계, 팀 코칭, 팀 개발과 성과)

  • Park, Jong-Hyuk
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.8
    • /
    • pp.260-273
    • /
    • 2011
  • Utilizing cross-functional project teams is an attractive organizing option, particularly in solving complex and innovative problems that require diverse sources of information, knowledge, and expertise brought by individuals from different functional backgrounds. This study is aiming at finding the group dynamics surrounding and inside the teams for the better understand what makes cross-functional project teams effective. Adopting variables from small group research and organizational context research, I extract critical antecedents, mediator, and team-coaching that lead to team performance. Data from 32 cross-functional project teams consisting of 214 individual respondents are analyzed through regression analyses for hypotheses testing. Results of the analyses demonstrate that the team process and team performance are significantly affected by the composition of competence in team and team compensation. Also I find that team-coaching as a leadership behavior has influence on team process and team performance. Some implications, future research directions, and limitations are discussed.

Evaluation the Relationship of Software Engineering Level and Project Performance by Organization Change Management (조직변화관리 수준에 따른 SW공학수준과 프로젝트의 성과)

  • Kim, Seung-Gweon;Yoon, Jong-Soo;Cho, Kwun-Ik
    • Journal of the Korea Society of Computer and Information
    • /
    • v.19 no.2
    • /
    • pp.209-219
    • /
    • 2014
  • With rapid convergence of information technology and expending role of software, many organizations have taken interested in We explore the relationship between the level of change awareness and deployment of software process improvement (SPI) approaches using a competing values framework. To measure awareness level of organization's change, DICE framework which provides means for predicting the outcome of change management initiatives is used. The four factors for organizaton's change: duration, integrity, commitment, and effort are evaluated and a score is calculated. In this paper, we apply the DICE(R) score as an independent variable to predict the outcome of a software process improvement. Our results indicated that the Organization have a higher chance of success have the better outcome in software process improvement.

Web 2.0 Cluster based Process and Performance Management System Modeling (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 모델 구축)

  • AHn, Jae-Gyu;Ong, Ho-Kyoung;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.892-898
    • /
    • 2007
  • This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.

  • PDF

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum - (계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 -)

  • Lee, Yoo-Seob;Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.155-163
    • /
    • 2007
  • Multiple parties-owners, engineering and construction contractors, and suppliers involve the delivery process of capital facility projects in the construction industry, and each party obtains or provides their workforce, material, equipment, or service tied into specific contracts. Considering that construction projects are based on the contracted relationship between the parties and that contract types are one of the significant factors determining project success. it is critical for project stakeholder to select appropriate contract types for successful deliveries of projects. With these considerations, this paper assesses impacts of different contract types on project cost, schedule, safety, change, or rework. Analyzing data from real construction projects, the differences in project performance between two contract types, Cost Reimbursable and Lump Sum are measured and statistically tested to investigate if the differences are significant. For this analysis, performance metrics developed by Benchmarking and Metrics program, the Construction Industry Institute are used.

The Effects of User Attitude and System Management level on the System Performance (사용자태도와 시스템 관리수준이 성과에 미치는 영향)

  • Han, Gyeong-Il
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.249-255
    • /
    • 2007
  • 본 연구의 목적은사용자 태도와 정보시스템 관리수준이 어떻게 조합되었을 때 정보시스템 성과에 영향을 주는가는 알아보기 위한 것이다. 시스템 관리변수로는 정보시스템의 평가기준관리와 프로젝트관리로 정의하였다. 정보시스템을 평가하기 위하여 시스템개발과 운영과정에서 개발자들이 중요하다고 생각하는 효과성, 생산성, 사용자 친숙성, 생산성 등 25개 항목을 조사하였고, 프로젝트 관리활동은 규모, 노력 기간, 결점등이 조사되었다. 연구목적을 달성하기 위하여 실증연구가 이루어졌다. 연구 결과는 보면, 사용자의 태도가 호의적이면 시스템 성과가 높은 것으로 나타났다. 그리고 비호의적인 집단에서도 평가기준관리와 프로젝트관리를 철저히 하면 성과가 높아지는 것으로 나타났다.

  • PDF

A Study on the Project Learning for The Game Developers (게임 개발자 양성의 프로젝트학습 연구)

  • Oh, Hyoun Ju
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2018.07a
    • /
    • pp.99-101
    • /
    • 2018
  • 본 연구에서는 게임 교육기관의 개발자 양성에 있어 프로젝트 학습법의 중요성과 필요성을 강조하고자 하였다. 교육에 있어 프로젝트 학습법의 기본 개념정리와 함께 이에 대한 궁극적인 목표, 운영과정과 활용에 대하여 선행이론을 검토하고 긍정적 효과와 유의점 등을 살펴보았다. 사례로 청강문화산업대학교 게임콘텐츠스쿨의 프로젝트 운영과정과 이에 대한 성과 등을 살펴보고, 이를 통해 긍정적인 면을 강조하는 동시에 한계점을 밝혔다. 미래사회의 다양성과 변화를 대비하는 측면에서의 교육 방향이자, 게임 개발자 인재육성에 가장 효율적인 학습법이 프로젝트 학습법임을 강조하고, 이에 대한 지속적이고 견고한 분석과 점검을 통해 한계점을 극복하고 더욱 발전시킬 수 있도록 하는 방향에서 학습자 중심의 미래형 인재 육성 교육 방안을 제시하고자 하였다.

  • PDF

The Strength of Network Ties in TV Drama Making Project: Performance Implication (TV 드라마 제작 프로젝트의 사회 네트워크 연결강도: 성과에 대한 함의)

  • Choo, Seungyoup;Limb, Seong-Joon
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.6
    • /
    • pp.1-12
    • /
    • 2015
  • This study attempted to verify the influence of strong and weak ties on the performance of project based organizations by examining various tie relationships in the Korean TV drama making industry. The extant literature has suggested that the impact of network ties depends not only on their strength but also the network contexts (i.e., project characteristics). Due to artistic and creative nature of TV drama making, it is hypothesized that weak tie networks among critical human resources would outperform strong tie networks. Empirical results support the hypothesis that weak tie networks indeed outperform strong tie networks in terms of viewing rate of drama.

Development of Project Success Model in Enterprise Using FCM (FCM을 이용한 기업프로젝트의 성공 모델 개발)

  • Park, Young-Man;Hwang, Seung-Gook;Park, Kwang-Bak;Lee, Young-Joo
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.20 no.1
    • /
    • pp.123-128
    • /
    • 2010
  • To increase the chance of the success of project, it is necessary to identify the important factors influencing the performance of project. Cognitive map has been used for analysing by investigating causal links among relevant factors. A fuzzy cognitive map (FCM) is an extension of a cognitive map with the additional capability of representing feedback through weighted causal links. Project performance is influenced by several factors such as input resources, possibility of achievement, concern of others and so on. The object of this paper is to develop the project success model of enterprise using a fuzzy cognitive map approach to investigate the degree of causal relationship between project performance and these factors.