• Title/Summary/Keyword: 프로젝트관리지식체계

Search Result 53, Processing Time 0.024 seconds

A Study of Knowledge Classification Structure Improvement through Adopting BPM (BPM 도입을 통한 지식분류체계 개선에 관한 연구)

  • Hwang, Jin-Won;Choi, Hyung-Won;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.720-724
    • /
    • 2008
  • Concentration about value of invisible asset has increased in the condition of rapid business circumstance change. As one of these concentration, many company adopted knowledge management, and construction industry also tried to adopt knowledge management. However, it is difficult for construction company to get expected effects because of knowledge management system in no relation with business process. To solve this problems, this study adopted BPM that has many functions, such as business process design, operation, monitoring, sustainable improvement, to knowledge classification structure.

  • PDF

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

사업관리 절차서 개선 효율화 방안

  • Yun, Jae-Ho
    • Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.58-64
    • /
    • 2003
  • 건설 프로젝트를 수행함에 있어서 사업관리운영 절차서는 매우 중요하다. 국내에서는 일부 대형 공공 사업을 제외하고 프로젝트의 특성에 맞는 절차서를 개발하여 적용한 예는 드물다. 이러한 점을고려하여 현재 공사가 진행죽인 대표적인 국내민간자본 SOC사업을 표본으로 삼아 절차서의 활용현황을 검토분석하고 그에 따른 효율화 방안을 구하여 보았다. 이를 위해서 사업수행주체인 발주자, 사업관리자, 감리자, 설계자, 시공계약자 등을 대상으로 현재 보유/사용하고 있는 절차서에 대한 이해도, 사업관리지식체별 업무절차에 대한 이해도를 설문조사하였다. 설문조사의 분석결과를 토대로 건설사업관리수행상 업무수행절차의 전반적인 이행실태를 점검하여 문제점을 도출함으로서 향후 사업관리운영절차서의 체계적인 개발을 위한 추진방향을 설정하고 사업관리전반에 대한 인식제고와 효율적인 사업관리체계의 적용방안을 모색하여 제시하였다.

Development Of EPC Project Management Procedure Manual System For Plant Project Management (플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발)

  • Park, Bum-Jin;Lee, Min-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.487-491
    • /
    • 2006
  • As Korea has been industrialized high recently, the constructional plant part which is the major driving force to Korean economic growth is being developed. In spite of the great importance, there are many ill-prepared parts in EPC project management procedure, and working in practice of EPC project management procedure manual is not systematic. That is why the governmental progressive policy on the relevant technology and the establishment of EPC project management procedure are needed. This study was aimed to derive reform measures by analyzing problems of EPC project management procedure manuals which are in use at 13 large-sized construction companies currently. The reform measures which are based on the theory of PMI(Project Management Institute)'s PMBOK(Porjcet Management Body Of Knowledge) are about deriving administration factors to control the project, and EPC project administration factors are derived from the definition of CMAA(Construction Mangement Association of America). The reformed electronic EPC project management procedure manual system is set up by standardizing derived administration factors.

  • PDF

Management Research in Plant Construction;Introduction of research center (플랜트 프로젝트 관리체계 표준화 기술 개발;연구단 소개)

  • Lee, Young-Nam;Kim, Chan-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.213-220
    • /
    • 2006
  • Plant construction industry is a high value-adding industry because it is complex industry comprising engineering, procurements of equipments and construction. So, Revenue increase in overseas plant projects would boost up not only domestic construction industry but also growth of national economy. Recently, overseas plant-construction market is expanding dramatically. For instant, Middle-east countries are constantly increasing their orders for the construction of petro-chemical plants stimulated by sky-rocketing oil prices. The purpose of this research is to develop management techniques for plant projects such as work break-down structure, knowledge management system, logistics & procurement system, and risk assessment tools. We believe our research would contribute to the competion of Korean engineeing companies and contractors in overseas plant-construction market.

  • PDF

A Study on the Application of Information Classification for Integration of Construction Information in Construction Phase (시공단계의 건설정보 통합을 위한 분류체계 적용에 관한 연구)

  • Kim Jin-Young;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-455
    • /
    • 2002
  • Construction market situation has been changed quickly in the 21st century. One is a large variety of information, the other is the development of IT technology among the rest of the change. Accordingly, it is very important that information is managed systematically and made good use of broadly in proportion to the increase of information volume. Therefore, the purpose of this study is to propose a applicable classification system in the construction phase. First of all, the Construction Information Classification proposed by the government is studied to apply the actual work and to build a applicable construction information classification for construction project. A base of the applicable classification system is the Construction Information Classification, SMM and Materials classification(Public Procurement Service). The applicable classification system to control and manage the construction information is consist of the 4 types : Facility classification, Element classification, Work classification, Resource classification (Materials, Equipment, Labor).

  • PDF

A Study on the Success Factors Related to the Performance of Power Plant Engineering Projects (발전플랜트 엔지니어링 프로젝트 성공요인 우선순위 도출 연구)

  • Suh, Jaeho;Lee, Dongmyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.11-22
    • /
    • 2024
  • Power plant engineering industry obtains EPC plan project and delivers results about electricity, measurement, machinery, and piping and so on. Its works are taken by projects. Although power plant engineering composes 2~5% of whole EPC project cost, it's one of the fundamentals because it affects process after planning step a lot. However, domestic power plant engineering companies' project performance ability is insufficient and there's a need for systematic performance. Thus, this study defined related factors of successful performance and analyzed the priority among them through analytical hierarchy process. All respondents recognized experience, knowledge, and communication as important factors. Administrators considered knowledge, experience, and communication. But hands-on workers considered experience, knowledge, human resources. Those who have experience in oversea project considered process, experience, human resources. However those who don't have experience in oversea project considered knowledge, experience, and communication. Recognition of important factors varies by the position and work experience of members.

Opportunity Tree and Algorithm design to schedule management (일정관리를 위한 Opportunity Tree 및 알고리즘 설계)

  • Lee, Eun-Se;Lee, Sang-Ho
    • The KIPS Transactions:PartD
    • /
    • v.12D no.7 s.103
    • /
    • pp.965-978
    • /
    • 2005
  • There are many defects that cause the schedule and qualify problems during software development. This paper designs the opportunity tree framer work that removes and manages the schedule and quality problems as well. For the similar projects, we can estimate defects and prepare to solve them by using domain expert knowledge and the opportunity tree framework which can greatly improve the software process. This research provides solution of schedule defect problem and detection of defect and its causes that happen on software development.

A Case Study of Risk Management factors in Web Design Project (웹 디자인 프로젝트에서 리스크 매니지먼트 요인에 대한 사례 연구)

  • 박은영
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.69-78
    • /
    • 2003
  • Risk Management is one of the most important factors in web design project management. The purpose of risk management is to identify reasons of risk to avoid risky situation and successfully achieve final goal of the project. This paper first describes concept of the web design project management and its processes. Secondly this study presents planning principles for systematic risk management process. Also it suggests a model of risk management. Finally this paper demonstrates utility of the risk management model through case studies based on the suggested risk management model.

  • PDF

Case Study on the Process oriented Micro-KMS (업무 프로세스 기반의 Micro KMS 사례연구)

  • Ma, Jae-Yong;Lee, Sang-Hun;Kwon, Min-Seok;Kim, Tae-Hyung;Yoo, Min-Hyuk
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2010.05a
    • /
    • pp.357-362
    • /
    • 2010
  • 기업에서 도입하여 활용하고 있는 지식관리시스템(KMS)의 목적은 다양한 정보와 지식을 다자간공유를 통하여 업무를 효율적으로 지원하는 데에 목적이 있었으나, 지식의 축적과 활용방법이 용이하지 않다는 문제점으로 활용도가 점차 낮아지는 경우가 발생되고 있다. 본 연구에서는 이러한 지식의 활용을 높이기 위하여, 보다 용이한 지식의 축적 방안과 업무를 수행하면서 적절한 때 요구되는 지식을 적시에 보여줄 수 있도록 하는, 업무에 지식을 결합시키는 방안을 제시하였다. 업무에 기반한 지식관리체계를 국내/외 사례를 통해 설명하고, Valtech Consulting에서 2009년 모공공기관의 프로젝트를 수행하며 직접 구현한 업무지원 시스템에 Embed된 Micro-KMS 사례를 소개하였다.

  • PDF