Experimental Studies on PSC Airpit-Slab with Fire Resistance Panel under Static and Dynamic Loads (내화패널이 부착된 프리캐스트 PSC 풍도슬래브의 정적/동적하중에 관한 실험연구)

  • Kim, Tae Kyun;Bae, Jeong;Choi, Heon;Min, In Gi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4A
    • /
    • pp.245-253
    • /
    • 2012
  • In the longway tunnel and underground traffic road, the structure of transverse ventilation system is constructed by the airpit slab. In this study, the full scale specimens of the PSC airpit slab that attached fire resistance panel are performed the static and dynamic loading tests for evaluation of bending capacity. The first of all, it confirmed the evaluations about the fundamental efficiency of the fire resistance panel and PSC slab by the 3-point bending test and pull-off test. The tests are performed for evaluation of the bending resistance under ultimate static load and the bonded capacity under dynamic fatigue load. A fatigue test is performed for an investigation of the effect on wind pressure that is developed by transit of traffic. The damage or debonding on surface between fire resistance panel and PSC slab was not developed in dynamic fatigue load test, also the behavior of the specimens is very stable and the debonding of the fire resistance panel attached at the bottom surface of PSC slab was not developed in static load test, too. Therefore, the crack or debonding of the fire resistance panel will be not developed by external loads during the construction or completion of the precast fire resistance system.

Fire resistance assessment in construction joint of precast fireproof duct slab (프리캐스트 방식 내화풍도슬래브 시공조인트부의 화재저항성능 평가)

  • Choi, Soon-Wook;Kang, Tae-Ho;Lee, Chulho;Kim, Se Kwon;Kim, Tae Kyun;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.359-370
    • /
    • 2021
  • Duct slabs, which are used to build ventilation facilities in underground spaces with transverse ventilation system, need to secure fire resistance according to longitudinal and heavy vehicle traffic of tunnels. This study measured the temperature change at the construction joint of the precast fireproof duct slab which integrates fire resistance material and duct slab under the RWS fire scenario. As a result, it was confirmed that if there is no reinforcement of the construction joint, damage will occur in concrete inside the construction joint, leading to damage to the fireproofing layer. On the other hand, when one side of the construction joint was reinforced with fireproofing materials, it showed more than three times the fire resistance performance compared to when there was no reinforcement. At this time, cross-sectional losses of concrete and fireproofing layer were shown in blocks without reinforcement, but no damage was seen in the reinforced blocks.

Fire resistance assessment of precast fireproof duct slab (프리캐스트 방식 내화풍도슬래브의 화재저항성 평가)

  • Choi, Soon-Wook;Kang, Tae-Ho;Lee, Chulho;Kim, Se Kwon;Kim, Tae Kyun;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.669-680
    • /
    • 2020
  • In Korea, fireproof performance is evaluated through a series of fire-resistance tests for important structures, and the performance standard follows the guidelines suggested by ITA. The fireproof duct slab manufactured by combining the slab and the fireproof material with a precast method is effective in that it can eliminate the construction time of the fireproof material. In this study, a series of fire resistance tests was performed on the fire test specimens under the RWS fire scenario in order to secure the fire resistance performance of the precast fireproof duct slab. As a result of the test, it was found that the fireproof performance was secured when the thickness of the fireproof material was 30 mm or more. In both fireproof materials and concrete, the rate of temperature change initially increased, then decreased, and then increased again, and the temperature at the inflection point was measured as 110℃ for all fireproof materials and concrete. It is judged that this occurs when the C-S-H (CaO-SiO2-H2O) generated by the hydration reaction in both the fireproof material and concrete is dehydrated.

Experimental Study on the Fire Proofing Characteristic of Fire Resistance Panel that it attaches to PSC Airpit-Slab (PSC 풍도슬래브에 부착된 내화패널의 내화특성에 관한 실험연구)

  • Lee, Doo Sung;Bae, Jeong;Choi, Heon;Min, In Gi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.465-473
    • /
    • 2013
  • In this Study, the performance of precast PSC slabs with fire resistance panel for fire resistance of the tunnel system was evaluated by experimentally. The fire test was performed in fire resistance (electric) furnace according to RABT(Richtlinien fur die Ausstatung und den Betrieb von stra${\beta}$entunneln) time heating temperature curve. The test results showed that the measured temperatures at the t=0 mm depth of PSC slab with precast fire resistance panel during a fire was maximum temperature $367^{\circ}C$, lower than $380^{\circ}C$ (ITA 2004), when damage occurs. Also, at the t=25 mm, the maximum temperature was $239^{\circ}C$, which was lower than the damage temperature of rebar, $250^{\circ}C$. From the results, the use of precast fire resistance panel (t=25 mm) improves fire resistance of PSC structures.

An Experimental Study on the Application of Fireproof Panel in Tunnel Duct Slab (터널 풍도슬라브에 사용된 내화패널의 적용성에 관한 실험연구)

  • Woo Jin Choi
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.2
    • /
    • pp.262-269
    • /
    • 2023
  • Purpose: In this study,fire-resistance test were executed to evaluate the effectiveness of the fireproof panel attached to the PSC slab in tunnel. Method: For the fire resistance test, the RWS curve was applied and the furnace of the KICT was used. Result: As a result of the experiment, the maximum temperature measured on the concrete surface of the PSC slab with the fireproof panel was 321.8℃, which was lower than the damage limit temperature of 380℃ for concrete. Also, at the t=25mm, the maximum temperature was 35.2℃, which was lower than the damage temperature of steel, 250℃. The use of precast fire resistance panel(t=30mm) improves fire resistance of PSC structures. Conclusion: As a result of the test, a reinforcement method for attached a fireproof panel in case of fire in a tunnel or an underground roadway is provided to protect a structure from fire. In the future, it is necessary to perform the static performance test of the slab to which the fireproof panel is attached, and to confirm the adhesion performance of the fireproof panel by performing the pull-off test and the fatigue test.

A study on the structural safety of middle slab in double deck tunnel under live loads (활하중에 대한 복층터널 슬래브의 구조적 안전성에 관한 연구)

  • Kim, Tae Kyun;Kim, Se Kwon;Kim, Hyun Jun;Kim, Chang Young;Yoo, Wan Kyu;Hwang, Sung-Pil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.171-183
    • /
    • 2020
  • The purpose of this study is to analyze in advance the problems and improvements that may occur during the construction of intermediate slabs and the loading of intermediate slabs through the preliminary structural safety evaluation of intermediate slabs for Test bed structures in deep depth tunnels. The Test bed construction can verify and confirm the results of the design and construction technology development of large depth double deck tunnel through the process, and can also be used as a learning site for engineers and the general public to speed up the time of underground space development. There will be an opportunity to do this. In particular, the design load of middle slab built inside the circular deep-depth double-sided tunnel cross-section varies depending on the construction method and the construction equipment load used. Class 3 truck load of KL-510 assumed to be common load to upper and middle slab during loading and installation is loaded on upper and lower slab with different working position for each load combination Analyzed.

Fire Resistance Assessment of Precast Duct Slab with Fireproof using Hardening Accelerator (경화촉진제를 사용한 내화재 일체형 프리캐스트 슬래브의 화재저항성능 평가)

  • Soon-Wook, Choi;Tae-Ho, Kang;Chulho, Lee;Se Kwon, Kim;Tae Kyun, Kim;Soo-Ho, Chang
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.363-372
    • /
    • 2022
  • Precast concrete is an effective method to increase the construction quality and construction speed by optimizing and making the manufacturing conditions similar. In order to more effectively produce a fireproof material-integrated precast duct slab, the purpose of this study was to determine whether the fire resistance performance of the fireproof layer is maintained when a method of increasing the curing rate using a hardening accelerator is used. As a result of performing a fire resistance performance test on specimens classified according to whether or not the hardening accelerator was included, increase of temperature inside the specimen was high in the specimens using the hardening accelerator, and the section loss of the fireproof layer occurred locally on the surface exposed to fire heating. In conclusion, it is judged that the fireproof layer in the case where the strength at 3th day of age is gained within 1 day curing age using a hardening accelerator does not guarantee sufficient fire resistance performance in the conditions used in this study.