A study on the structural safety of middle slab in double deck tunnel under live loads
![]() |
Kim, Tae Kyun
(Hong G Co., Ltd.)
Kim, Se Kwon (Hong G Co., Ltd.) Kim, Hyun Jun (Hong G Co., Ltd.) Kim, Chang Young (Future Infrastructure Research Center, Korea Institute of Civil Engineering and Building Technology) Yoo, Wan Kyu (Korea Institute of Civil Engineering and Building Technology) Hwang, Sung-Pil (Korea Institute of Civil Engineering and Building Technology) |
1 | Chung, C.H., Sung, Y.E., Hyun, B.H., Park, S.J. (2008), "Experimental study on connectability of half-depth precast deck panels with loop joint", Journal of the Korean Society of Civil Engineers, Vol. 28, No. 4A, pp. 581-590. |
2 | Kang, K.N., Lee, S.H., Song, K.L., Liu, L., Motamedi, S. (2019), "Performance-based evaluation of a double-deck tunnel and design optimization", Sustainability, MDPI, Open Access Journal, Vol. 11, No. 1, pp. 1-20. |
3 | Kim, B.Y., Lee, D.S., Choi, W.S., Kim, K.Y. (2016a), "An experimental study on precast road deck slab of double deck tunnel in great depth under fatigue loads", Proceedings of the Korean Society of Civil Engineers, Vol. 2016, No. 10, Jeju, pp. 89-90. |
4 | Kim, B.Y., Lee, D.S., Kim, T.K., Bae, C.K., Kim, J.G. (2016b), "The experimental study on transverse field connection method of precast road deck slab of double deck tunnel in great depth", Proceedings of the Korea Concrete Institute, Vol. 28, No. 1, Goseong, pp. 125-126. |
5 | Kim, B.Y., Lee, D.S., Kim, T.K., Kim, Y.J. (2016c), "An experimental study for the improvement of construction speed on pc and steel bracket", Proceedings of the Korean Society of Civil Engineers, Vol. 2016, No. 1, Jeju, pp. 91-92. |
6 | Kim, T.K., Bae, J., Choi, H., Min, I.G. (2012), "Experimental studies on PSC airpit-slab with fire resistance panel under static and dynamic loads", Journal of the Korean Society of Civil Engineers, Vol. 32, No. 4A, pp. 245-253. DOI |
7 | KSSC (2011), Korean steel structure design code and commentary-load and resistance factored design, Korean Society of Steel Construction. |
8 | Lee, D.S., Kim, B.Y., Bae, C.G., Hur, J.H. (2017), "The experimental study on transverse field joint method of precast road deck slab of double deck tunnel in great depth", Journal of the Korea Concrete Institute, Vol. 29, No. 1, pp. 23-32. DOI |
9 | Lee, D.S., Kim, T.K., Chae, G.B. (2015), "The experimental study of full-scale optimized composite beam (OCB) reinforced with open strands", Journal of the Korean Concrete Institute, Vol. 27, No. 5, pp. 471-480. DOI |
![]() |