• Title/Summary/Keyword: 타일공사

Search Result 12, Processing Time 0.027 seconds

A Study on Analysis of Defect Types and Measures for Reduction of Tile Construction for Apartment Houses (공동주택 타일공사의 하자 유형 분석 및 저감 대책에 관한 연구)

  • Park, Hyun Jung;Eom, Yong Been;Jeong, U Jin;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.701-712
    • /
    • 2021
  • As the domestic housing supply problem has been resolved, the apartment construction market has shifted to a consumer-oriented market that wants high quality, and in particular, expectations in the area of finishing quality have increased. Looking at the status of complaints regarding apartment housing defects supplied by Korea Land and Housing Corporation, tile-related complaints are the type occurring the most frequently. While the Ministry of Land, Infrastructure and Transport(MOLIT) is making an ongoing effort to reduce complaints related to defects, through approaches such as drafting amendments to 「Investigation of defects in apartment houses, calculation of repair costs, and standards for determining defects」, the provision of preventive measures has been insufficient. In addition, by reviewing studies, there has been insufficient research to construct a classification system after deriving the characteristics of each type using the qualitative knowledge of experts, various quantitative indicators, and suggesting measures for reduction according to the causes of each type. Therefore, this study will reflect qualitative indicators to use the AHP analysis that makes it easy to identify the relationship between defects by surveying construction experts. Then, by visualizing the weight of 'Possibility of recurrence after repair,' 'Degree of difficulty in repairing defects' and 'Fault frequency' using a radial graph, we will analyze the characteristics of each type of tile construction defect and establish measures for reduction according to the cause. This will improve the quality of the living environment and contribute to the establishment of a system for smooth defect management and reduction of defects in apartment tile construction.

Study on Tile Waterproof Adhesive Using Geopolymer (지오폴리머를 이용한 타일방수접착제에 관한 연구)

  • Kang, Byeong-Kwen;Chang, Jin-Ho;Chang, Sung-Joo;Bae, Gi-Seon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.35-36
    • /
    • 2017
  • This study used Geopolymer to study tile waterproofing adhesives. The materials used in this study were polymer and acrylic resin, and were evaluated based on adhesion and water resistance. In particular, the adhesion was evaluated under various conditions, and the substrate was comparatively evaluated on the concrete and tile surface conditions.

  • PDF

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

Classifying Sub-Categories of Apartment Defect Repair Tasks: A Machine Learning Approach (아파트 하자 보수 시설공사 세부공종 머신러닝 분류 시스템에 관한 연구)

  • Kim, Eunhye;Ji, HongGeun;Kim, Jina;Park, Eunil;Ohm, Jay Y.
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.10 no.9
    • /
    • pp.359-366
    • /
    • 2021
  • A number of construction companies in Korea invest considerable human and financial resources to construct a system for managing apartment defect data and for categorizing repair tasks. Thus, this study proposes machine learning models to automatically classify defect complaint text-data into one of the sub categories of 'finishing work' (i.e., one of the defect repair tasks). In the proposed models, we employed two word representation methods (Bag-of-words, Term Frequency-Inverse Document Frequency (TF-IDF)) and two machine learning classifiers (Support Vector Machine, Random Forest). In particular, we conducted both binary- and multi- classification tasks to classify 9 sub categories of finishing work: home appliance installation work, paperwork, painting work, plastering work, interior masonry work, plaster finishing work, indoor furniture installation work, kitchen facility installation work, and tiling work. The machine learning classifiers using the TF-IDF representation method and Random Forest classification achieved more than 90% accuracy, precision, recall, and F1 score. We shed light on the possibility of constructing automated defect classification systems based on the proposed machine learning models.

Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing (지급자재 조달관리부담 평가에 기초한 중소기업 공사용자재 직접구매제도 대응방안: 공공아파트를 공급하는 발주자를 중심으로)

  • Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.425-434
    • /
    • 2013
  • The Small and Medium Business Administration specified 123 construction materials mandatory to purchase directly and forced the public owners to provide the contractors with materials as required by related law. This study extensively reviewed various characteristics and management factors of the owner-providing materials consumed in the public apartment housing under Direct Buying System(DBS) from the public owner's perspective. Subsequently, the major managed materials were identified, and the proper response plan was developed along the material procurement process. The Procurement Management Load Indices (PMLI) of 43 materials were evaluated according to rating criteria with procurement path, project-specified level, user requirement level, supplier's responsibility, on-site work requirement, additional parts, and inspection standards. The tile and aluminum windows were classified in the group needing high-level procurement efforts to reduce the errors and ensure the efficiency. The accurate quantity estimation method, definite purchase details, management activity definition before and after production, additional quantity for rework, interference coordination were defined as the essential activities for effectively responding to DBS.

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.

Mobile Underground High-capacity 3D Spatial Information Tiling Transfer Protocol Development (모바일 지하 대용량 3D 공간정보 타일링 전송 프로토콜 개발)

  • Lee, Tae Hyung;Jo, Won Je;Kim, Hyun Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.491-496
    • /
    • 2021
  • In line with the modern era in which the safety of underground facilities and the use of underground information are increasingly emphasized, the state is pushing for more precise and accurate underground spatial information to be secured and utilized. Therefore, we need to pay more attention to subsurface geospatial data. In the future, the Ministry of Land, Infrastructure and Transport will actively utilize the 15 types of Integrated Underground Geospatial Information Map(6 types of underground facilities, 6 types of underground structures, 3 types of ground) that the Ministry of Land, Infrastructure and Transport is building as three-dimensional underground spatial information, and contribute greatly to improving national safety and convenience in underground construction. expected to do However, when a site manager requests an Integrated Underground Geospatial Information Map with a mobile device, if the large-capacity integrated underground space map is not quickly transmitted over the wireless section and is not serviced, it causes inconvenience to the site manager and delays work. In this paper, the goal of this paper is to enable field managers to quickly receive a tiled Integrated Underground Geospatial Information Map with minimal information exchange. Therefore, the tiling system is configured according to the dataset for high-speed Mobile Integrated Underground Geospatial Information Map transmission. In addition, a transmission system for the Mobile Integrated Underground Geospatial Information Map is established, and a TCP/IP (Transmission Control Protocol/Internet Protocol)-based spatial information tiling transmission protocol dedicated to the on-site Integrated Underground Geospatial Information Map is developed.

Hydraulic Experiment on Roughness Coefficient of PE pipe (폴리에틸렌관의 조도계수에 관한 수리모형실험)

  • Dongwoo Ko;Byeong Wook Lee;Jae-Seon Yoon;Hyun-Gu Song
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.288-288
    • /
    • 2023
  • 도로, 철도 등의 횡단통로, 오폐수관로, 지하배수관 등 연약지반에서 상재하중과 부등침하에 의한 파괴 위험을 줄이기 위해 구조적인 안전성과 내구성이 개선된 다양한 관로들이 활용되고 있다. 관은 매설특성에 따라 콘크리트관, 도관, 합성수지관, 덕타일 주철관, 파형강관, 유리섬유 강화 플라스틱과 폴리에스테르수지 콘크리트관 등의 종류로 구분된다(환경부, 2017). 수리설계 시 이러한 관의 단면 규모 결정 및 흐름 특성을 파악하기 위해 관수로 유량측정에 이용되는 Manning의 경험식을 이용하고 있으며, 관로의 주요 재질에 따른 다양한 조도계수가 제시되어 있다. 새로운 재질을 이용하여 제작된 관은 수리실험을 통해 조도계수를 결정하는 것이 바람직하지만, 조도계수 실험은 대규모의 실험시설과 유량공급이 요구되기 때문에 여러 한계가 있다. PE관의 경우, 미국의 ASTM 표준에 의해 저밀도 폴리에틸렌(LDPE), 선형 저밀도 폴리에틸렌(LLDPE), 고밀도 폴리에틸렌(HDPE) 등으로 분류되는데 본 연구에서는 HDPE 재질의 서로 직경이 다른 다중벽관 PE관을 대상으로 조도계수를 결정하기 위한 현장 실규모 수리실험을 수행하였다. 본 실험에서는 식생, 수로의 불규칙성, 수로노선, 침전과 세굴, 장애물, 계절적 변화, 부유물질과 소류사는 무시되며 표면조도, 관의 크기와 형상, 수위와 유량이 조도계수에 영향을 미치는 주요 인자라고 할 수 있다. 수리실험은 실물모형(Prototype)으로 한국농어촌공사 농어촌연구원의 대형수리모형실험장에서 수행되었으며. 길이 24 m, 직경 150 mm의 PE 관은 고정식 개수로, 직경 800 mm의 관은 대형유사순환수로에 각각 설치되었다. 관로의 전면에 차폐막을 설치하여 상류부 수위를 안정시킨 상태에서 실험을 수행하였고, 차폐막으로부터 하류방향으로 약 7 m(측정기준지점), 11 m, 13 m, 15 m, 17 m 떨어진 곳에서 각각 수위와 유속을 측정하였다. 실험 결과, φ150관은 직경대비 수심이 클수록 조도계수가 감소하는 경향이 나타났고, φ800관은 직경대비 수심의 변화에 따른 조도계수의 경향이 크게 드러나지 않았다. 결론적으로 PE관의 조도계수는 수심별로 변화하는 것으로 나타났으며, 특정 수심을 지나면 조도계수가 다시 감소할 것으로 판단된다.

  • PDF

A Study of the Prevent Measure by Case Analysis of Apartment Building Defect Lawsuit (공동주택 하자소송 사례분석을 통한 분쟁방지 대책에 관한 연구)

  • Pyeon, Su-Jeong;Kim, Jong-Ho;Kim, Gyu-Yong;Choe, Gyeong-Chol;Son, Min-Jae;Nam, Jeong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.257-268
    • /
    • 2021
  • This study analyzed the major issues of 24 defect litigation precedents before and after 2013, based on 2013, when defect litigation in relation to the rapidly increasing defect disputes in apartment houses. The amount of defect removal per household is 2,572 thousand won per household, which is about 5% less than before 2013 from 2013, but the judgment amount per household has rather increased by about 19%, showing 1,916 thousand won per household after 2013. By type of construction, defects on cracks accounted for the largest proportion before and after 2013. Before 2013, equipment, tiles, and windows appeared in the order, and after 2013, landscaping, tiles, insulation and window work were in the order. In order to prevent such defect disputes, efforts to prevent defect disputes will be needed in the design stage, construction stage, and maintenance stage.

A Guideline for Construction Management Plan Based on the Characteristics of $CO_2$ Emissions: A Case Study for a High-Rise Residential Building Project ($CO_2$ 배출 특성을 고려한 건설폐기물 관리방안 수립기준: 고층 주거건물 건설 프로젝트를 대상으로 한 사례조사)

  • Kim, Jee-Hye;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.150-158
    • /
    • 2007
  • As the amount of $CO_2$ emission in Korea is ranked 9th and the increasing rate of $CO_2$ emissions highest in the world, it is strongly necessary to devise methods to decrease the amount of $CO_2$ in each industry as the basis of establishing environmentally sustainable production system. This paper aims to identify the characteristics of $CO_2$ emissions from construction wastes throughout the simplified LCA (Life Cycle Assessment) and suggest the strategic guideline for the construction waste management plan to decrease $CO_2$. As a result of LCA on the case of a high-rise residential building project, total sum of $CO_2$ emission generated from construction wastes appeared as 6,818,123kg-$CO_2$ and $CO_2$ emission per unit floor area as 21.01kg-$CO_2/{\beta}{\ge}$. The principal waste materials generating more than 95% of $CO_2$ are materials such as reinforcing bar, temporary materials, cement, ready-mixed-concrete, concrete products, and tile, which have relatively high unit emission rate of $CO_2$ in the process of production. Besides, more than 92% of $CO_2$ was generated from the activities such as structure work, plaster work, temporary work, and tile and stone work, which are generally executed in the early phase of the whole construction period. Reflecting these results, the guideline for the construction waste management plan was recommended. If the waste management plan is established considering the guideline suggested, there would be high potential to decrease the amount of $CO_2$ generated from construction wastes.