• Title/Summary/Keyword: 타워크레인

Search Result 93, Processing Time 0.027 seconds

A Location Model for Tower Cranes of High-Rised Building Construction (고층건물 타워크레인 위치선정 모델)

  • Park Jung-Hyun;Lee Hyun-Shic;Hyun Chang-Taek;Koo Kuo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.614-617
    • /
    • 2003
  • Recently the demand of constructing high-rised building grows larger. So it becomes more important to make an exact plan of a tower cranes which has an important position in high-rised building construction. Nevertheless businessmen of construction sites only depend on a great store of experience without a clear process of locating tower cranes. The object of this study is to set up the process model for locating tower cranes. The study went off through a study of related documents, an interview with some experts and a visiting of job sites. In result the study suggests a process model which has four steps of considering an establishing, disjointing, a radius of working, easy working. Case study was examined to estimate the feasibility and applicability of the proposed model. As a result, the model is proven to be a method to locate tower cranes quickly and cleary, and to operate properly as a decision-making tool.

  • PDF

Comparative Analysis Study on Accidents Cases of Manned and Unmanned Tower cranes (유·무인 타워크레인의 사고 사례 비교분석 연구)

  • Jeong Kyeongtae;Jo Minje;Kim Hyein;Lee Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.6 no.1
    • /
    • pp.27-32
    • /
    • 2024
  • In this study, based on accident cases of manned and unmanned tower cranes, the types and causes of accidents were analyzed and tower crane accident prevention measures were proposed accordingly. As a result, 'lack of communication' was commonly analyzed as the biggest cause of accidents. Therefore, in this study, we investigated domestic and international systems and laws regarding signalmen responsible for communication between tower crane operators and workers and proposed the following three improvement methods. First, the signalman system must be legally and institutionally reestablished. Second, national agencies and private organizations with expertise should create standardized training manuals and distribute them to signalman educators, and create checklists to manage educators. Third, in the case of a site using a tower crane, the employer must mandatorily deploy a signalman with professional qualifications. Lastly, the results of this study are expected to highlight the differences in accident types and causes of manned and unmanned tower cranes and the need for legal and institutional improvement in the signal system.

Study to Secure the Safety of Tower Cranes through Disaster Case Analysis at Construction Sites (건설현장의 재해사례 분석을 통한 타워크레인 안전성 확보 방안 연구)

  • Son, Seunghyun;Kim, Ji-Myung;Ahn, Sungjin;Na, Youngju;Kim, Taehui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.1
    • /
    • pp.57-67
    • /
    • 2022
  • Tower cranes have an unstable superstructure, which means that there is a very high risk of accidents. It is necessary to establish preventive measures to ensure the safety of tower cranes at a time when active efforts are being made to reduce safety accidents involving tower cranes. As such, the purpose of this study is to analyze disaster cases to ensure the safety of tower cranes. For this study, 260 cases of tower crane disasters filed with the Korea Occupational Safety and Health Agency from July 2012 to July 2020 were analyzed. Through this analysis, it was found that lifting work was the most common of the work types, at 45.3%; while of the types of disasters, accidents caused by falls were the most common type, at 35.8%. In addition, with regard to the cause of accidents, work method defects was found to be the highest, at 38.8%. In the future, the findings of this study will be used as basic data to guide the establishment of policy to prevent tower crane accidents.

Curriculum Development for Training Tower Crane Drivers by DACUM Method (DACUM 방법에 의한 건설용 타워크레인 기능사 자격 교육과정 개발연구)

  • Kim, Jung-Sik;Park, Moon-Sun;Hwang, Uk-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.58-68
    • /
    • 2009
  • The purpose of this study is to suggest new subject to satisfy the lack parts of examination course of the existing driving tower crane certificate by using the DACUM method. For this, problems of education for the existing driving tower crane certificate and the existing subjects are examined and, based on these, comparing analysis of new subjects that follows the DACUM method and the existing subjects are conducted. The results of this study that were progressed following the purpose and method at the above are as follow : 1) It is analyzed that the existing subjects for the driving tower crane certificate could not be applied to construction fields immediately and the education to deal with disorders when driving the tower cranes. 2) The number of the subjects that have been advanced following the DACUM method is seven and those consist of five theoretical subjects and two practical subjects. It is analyzed that the developed and suggested subjects can be used in construction fields when considering the theoretical and practical parts in no time.

A basic study on the development of intelligent tower crane using IT (멀티미디어와 RFID 등 IT를 활용한 지능형 타워크레인 개발 기초연구)

  • Han Yong-Woo;Cho Hun-Hee;Lee You Seop;Kang Tai Kyung;Kim Jong Sum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.625-628
    • /
    • 2004
  • Even though the tower crane is a major equipment in a construction of high rise buildings, there are lack of studies of it. This study is presenting a framework of developing a intelligent tower crane applied with the technology of machine-vision, RFID(Radio Frequency Identification), or GPS(Global positioning System) and proposing the prototype of machine-vision module, sub module of this Framework. Through monitoring form CCTV(Closed Circuit Television) and LCD(Liquid Crystal Display) in machine-module the real time communication between in-site workers and crane operator is possible. this will improve the productivity and safety of the tower crane.

  • PDF

A study on the Inclination measurement with tilt sensor on the tower crane (기울기 센서를 이용한 타워크레인의 기울어짐 측정방안에 관한 연구)

  • Kang, Shin-Hyuk;Kong, Jung-Shik;Kwon, Oh-Sang;Jang, Mun-Suk;Shin, Woon-Chul;Lee, Dong-Kwang;Jang, Chol-Woong;Chung, Ki-Ho;Yeom, Moon-Jin;Lee, Eung-Hyuk
    • Proceedings of the KIEE Conference
    • /
    • 2007.10a
    • /
    • pp.91-92
    • /
    • 2007
  • 산업현장에서 사용되는 타워크레인의 전도 상황을 측정하기 위한 시스템은 현재 풍속계에 의존하고 있는데, 풍속계의 경우 타워크레인의 기울어짐을 정략적으로 측정할 수 없는 센서이기 때문에 정확한 상황 판단이 어렵고, 운전자나 관리자의 판단이 필요한 문제를 갖는다. 그래서 보다 정확한 정도를 측정하기 위해 타워크레인의 지브(jib) 휘어짐과 타워축의 휘어짐을 측정하여 정량적인 위험 상황을 경보 할 수 있는 전도 측정 장치가 필요하기 때문에 타워크레인의 좌/우 및 상/하 기울어짐에 대한 정량적인 측정이 가능한 기울기 센서를 이용한 센서 시스템을 구축하고, 타워크레인의 동작 위험성을 알리기 위한 경보 기법을 구축 했다.

  • PDF

A System for the Selection of the Optimum Tower Cranes(Opt-TC) (건설현장의 조건을 고려한 최적 타워크레인 선정시스템)

  • Ho, Jonh-Kwan;Kim, Sun-Kuk;Kook, Dong-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.216-226
    • /
    • 2007
  • The efficient vertical lift planning has been brought into relief in high-rise building construction projects. Particularly, the selection and stability examination of the tower cranes is the most important elements in vertical lift planning. Therefore, professional knowledge is needed to full fill the site condition for the plan. However, there are short of the number of specialists and information about tower cranes. This study proposes a system for the selection of the optimum tower cranes (Opt-TC) in high-rise building construction projects. The Opt-TC can give the selection and stability examination of tower cranes at once in real-time.

Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM) (DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구)

  • Kim, Seungho;Kim, Sangyong;Jean, Jihoon;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.151-159
    • /
    • 2016
  • Tower crane (T/C) is one of the major equipment that is highly demanded in construction projects. Especially, most high-rise building projects require T/C to perform lifting and hoisting activities of materials. Therefore, lifting plan of T/C needs to reduce construction duration and cost. However, most lifting plan of the T/C in construction sites has still performed depending on experience and intuition of the site manager without systematic process of rational work. Dependency structure matrix (DSM) is useful tool in planning the activity sequences and managing information exchanges unlike other existing tools. To improve lifting plan of T/C efficiently, this study presents a framework for the scheduling T/C using DSM through the case study in real world construction site. The results of case study showed that the scheduling T/C using DSM is useful to optimize the T/C lifting plan in terms of easiness, specially in the typical floor cycle lifting planning.

A Productivity Analysis of Tower Crane Installation Progress Based on Simulation Technique (시뮬레이션 기반의 타워크레인 설치 생산성 분석)

  • Kim, Yun-Sik;Cho, Jae-Kyong;Kim, Min-Ji;Cho, Kyu-Man;Hyun, Chang-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.33-40
    • /
    • 2010
  • Recently, the scale of construction work has been growing, and buildings are becoming higher. To enable greater efficiency of construction work, the use of vertical transportation equipment has been radically increasing. In this context, many studies have been conducted on tower cranes. While these studies have discussed issues such as the selection of tower cranes, the optimization of locations, and the hoisting time of tower cranes, there has been no research on the installation of tower cranes. As such, the installation of tower cranes on construction sites has been accomplished based on subjective judgment and technical assistance, and the experience of workers in equipment companies. Therefore, this study analyzes the productivity of tower cranes using simulation methodology, and proposes a generalized model of the installation process of tower cranes in order to offer a basic resource that site managers can directly utilize.

A Model on the Stability Analysis of Supporting Structure of Climbing-Type Tower Cranes (상승식 타워크레인 지지구조의 안정성 검토 모델)

  • Ho, Jong-Kwan;Kim, Ah-Young;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.190-198
    • /
    • 2008
  • Recently construction equipments have been used in line with building the structures that have become taller, larger and complex. And as the works at the elevated level for apartment and residential-commercial building projects have been on the rise, the number of tower cranes mobilized tends to be increased too. Due to such an increase in using the equipment serves the critical factor for the project management. The climbing-type tower crane, which increases its height following the structure, has been increased and the need for selecting the optimal model has been increasingly Important in securing the stability. The study hereby proposes the model to evaluate the stability of the climbing-type tower crane. The model was designed to assist in selecting the type of crane as well as in developing the design of Collar comprising the 3 types of support member, evaluating the stability and designing the embed. The model proposed is expected to make commitment in selecting the optimal type of equipment and evaluating the support member and embed for enhancing the stability, thereby ultimately enabling to implement the prefect in efficient way.