• Title/Summary/Keyword: 철도시설

Search Result 515, Processing Time 0.023 seconds

Frost Heave Force of Ground and Countermeasure for Damage of Structures (지반의 동상력과 구조물의 피해대책)

  • Rui, Da-Hu;Teruyuki, Suzuki;Kim, Young-Su
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.5
    • /
    • pp.43-51
    • /
    • 2007
  • Frost action may cause extensive damage to building, structures, roads, railways and utility lines in seasonal frost. The research about frost heave of natural ground has been considerably performed. In late years various structures have become complicated with the development of social infrastructure maintenance. Therefore countermeasure to frost heave becomes a matter of great importance from a new viewpoint. This study was aimed at catching natural ground frost heaving force quantitatively. Frost heaving forces on circular steel plates which were set on ground surface were measured in field test. The frost heaving forces arise at freezing front propagates to the structures through frozen soil layer. Besides, a full scale model of multi-anchored retaining wall was installed in field, and the freezing lines, frost heave pressure to act on a wall block, and so on were measured. Finally, the position and shape of frost line were estimated by using numerical simulation and a method to determine replacement range was suggested with soil properties and weather data.

A Regional Trip Modes Classification Methodology Using Mobile Phone Data (모바일 데이터를 활용한 지역간 수단통행 분류 방법론 개발)

  • Kyuhyuk Kim;Hyorim Han;Dongho Kim;Tai jin Song
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.4
    • /
    • pp.77-93
    • /
    • 2024
  • The recent development of data collection technology, which conveys various travel data in real-world such as mobile data and probe vehicle data, facilitates transportation planners identifying specified spatio-temporal travel patterns. In this study, an easily implementable travel mode classification methodology was proposed to classify inter-regional trip-modes without modeling by superimposing trajectories generated from mobile phone signaling and transportation infrastructure points into a polygon scale of a shapefile in a GIS system. Each regional mode trip was classified according to the rules such as the presence of transportation infrastructure in the trip trajectory, travel time, and the presence of access trips. An accuracy test generates Type I and Type II error results table to verify the proposed methodology. As a result, it was found that the methodology developed showed the F1-Score of the air mode 1.00, rail mode 0.95, bus mode 0.73.

A Study on the Delay Analysis Methodologies in Construction of Korea High Speed Railway (경부고속철도 건설사업의 공기지연분석에 관한 연구)

  • Yun Sung-Min;Lee Sang-Hyun;Chae Myung-Jin;Han Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.250-255
    • /
    • 2004
  • To analyze delay, Seoul - Daegu line of Korea High Speed Railway was divided into three sections and analyzed independently by the business characteristics. The analysis on the project delay reasons was performed on macro and micro scales. This analytic method was named as 'Macro-Micro Delay Analysis Method (MMDAM)'. The macro scale analysis has three approaches, which are (1) scheduling, (3) structural characteristic, (3) and responsibility of project administrative works. Micro analysis also has three, methodologies which are (1) As Planned Method, (2) As Built method, (3) Modified Time Impact Analysis for analyzing the most influential section which the largest delay occurred. Using elicited project delay reasons from above analysis, the questionnaire was carried out for analyzing the influence of project delay reason. The reasons of the delay were driven from two different aspects (1) structural characteristic and (2) responsibility of the people involved in the project. The reasons that were identified from aforementioned three sections are the factors of the delay of the large-scale government driven projects. Finally, the author suggested the methodology of identifying the project delaying factors. The author also analyzed delay reasons in both the overseas and domestic cases of high rapid railway construction and has elicited some benchmarks for the future projects.

  • PDF

Economic Feasibility of An Extra Stop Need at Kimpo Metro Station of AREX Express Trains (공항철도 직통열차 김포공항역 추가 정차에 따른 타당성 분석)

  • Kim, Dong-Hwan;Lim, Kwangkyun;Kim, Sigon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.5
    • /
    • pp.1547-1552
    • /
    • 2014
  • AREX (Incheon Airport Railway Express) operates trains between Seoul and Incheon Airport. One type of trains stops on every 10 stations, and another only on the two end-stations which called an Express train. The passengers traveled on express trains are very small since there are only two stops, Seoul and Incheon Airport Stations. The passengers of express trains will be more attracted if the express train stops on the intermediate stops (Gimpo station) since Line #9 and Line #5 are connected to from Gangnam. An on-board survey was conducted to predict the potential demand in case the express train stops at the Gimpo station. Further the costs required to improve platforms of the station were estimated to figure out the economic feasibility against the demand increases. It analyzed 938 increases for the case of intermediate stopping on the same travel time condition and 1,299 increases for the case of extra stop with decreased travel time. The study concluded the latter case appears desirable in the stance of long-term while both cases are economically feasible.

The Creation of Ttukseom Pleasure Ground and Its Transformation to a Park (뚝섬유원지의 생성과 공원화)

  • Kim, Jeoung-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.1
    • /
    • pp.127-142
    • /
    • 2018
  • Ttukseom was once a suburban area that had a government horse ranch for national use and a naenogpo (area of royal farm land). During the Japanese colonial period, a pleasure ground was built at Ttukseom, and after independence, it has been used as a park through the process of urbanization. This study examines the creation of the Ttukseom Pleasure Ground and the process through which the pleasure ground were transformed to a park. This study also explores its landscape and cultural aspects. In the 1930s, Gyeongseonggwedo (京城軌道), a private railway company, built a pleasure ground at Ttukseom to attract passengers, according to the business model of Japanese railway companies, in which recreational areas were developed near railway routes. Mass media portrayed this area as a "rural landscape" in contrast to the city. The Ttukseom Pleasure Ground emerged as a popular summer resort for Gyeongseong citizens. At the same time, it was managed by Gyeongseongbu (京城府). The city of Seoul began to manage the Ttukseom Pleasure Ground following independence, and development plans for Ttukseom as a pleasure ground or a park were continuously drafted but never implemented. Even after Korea's independence, the operation and use of the pleasure ground did not change significantly from the colonial era. In the late 1980s, the Ttukseom Pleasure Ground became the Ttukseom Han River Citizen's Park, and the sandy beach of the Han River was removed. Nonetheless, the previous facilities and major activities such as an open-air swimming pool, camp ground, and areas for boat recreation remained as major park programs. When the urbanization of Ttukseom was completed, its idyllic image disappeared and it became a park instead of a pleasure ground. Since parks expand their programs, it can be concluded that by providing those kinds of programs, the Ttukseom Pleasure Ground transformed to a park.

A Study on the Change of Urban Land Use According to the Change of Transportation Accessibility (교통 접근성 변동에 따른 도시 토지이용 변화에 관한 연구)

  • Won, Seok Hwan;Hwang, Chul-sue
    • Journal of Cadastre & Land InformatiX
    • /
    • v.47 no.1
    • /
    • pp.127-142
    • /
    • 2017
  • The purpose of this study is to examine the status of urbanization of Namyangju-Si from 2001 till 2008, analyze the correlation of the change of surrounding land use according to the change of accessibility and analyze the correlation of the change of land use. Based on the result from correlation analysis, I simulated from the view point of interactions between agents of land use and transportation accessibility by using MAS. I tried to forecast, based on space, the change of surrounding land use caused by the change of accessibility. I conducted landscape analysis by using a land registration map. Also, I conducted GIS analysis statistical analysis simulation analysis of traffic data, land use data in order to analyze the correlation of the change of surrounding land use according to the change of accessibility. I could find out a certain pattern that new roads and railroads causes the within 500m adjacent land to change into urban land use, which led me to construct a system through which land use changing phenomenon can be expected according to the change of accessibility. It is expected that it can make the best use of selecting the location where new transportation facilities are constructed.

The design and construction with the JES method used steel elements for under pass in korea and the practical use of the JES method (강재 엘리먼트를 이용한 기계식 UNDER PASS 공법(JES 공법)의 국내 적용 사례 및 활용 방안 연구)

  • Jeong, Gyeong-Hwan;Jung, Sun-Tae;Kim, Do-Hyeong;Kim, Jung-Sung;Hwang, Young-Chul;Park, Min-Kwan
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1498-1508
    • /
    • 2009
  • Recently, the expansion of roads are necessary because the population and vehicles have rapidly increased, but those are restricted because of the limited site. JES(Jointed Element Structure) method is the method of the new cross-structure, which is element-traction method which draws and excavates elements under the existing structure with high accuracy within a short time. Also JES(Jointed Element Structure) method has a facility of the economical execution, a small effect on the train-service during construction period and no limit of the crossing length under the trade In this study, the tractive force and settlement are compared with the upper element, side wall element and the lower element respectively in the section which the JES method is applied In the case of element located at left side wall, the tractive force measured by a guage is double or more than the tractive force calculated by a formula. It is expected that many boulder contented in the ground contrary to the site investigation data cause high tractive force. For comparison of the settlement, the settlement as excavating the upper element is the largest in all steps. It is expected that this is the same as the cause of high tractive force. Also in this study, the practical use of the JES method when some under pass structures are extended in the future is studied.

  • PDF

Analysis of Acceleration and Deceleration on High Performance Train for A Metropolitan Rapid Transit System (대피선 최소화를 고려한 광역·도시철도 급행화를 위한 고성능 열차 가감속도 분석)

  • KO, Kyeong Jun;KIM, Jung Tai;KIM, Moo Sun;JANG, Dong Uk;HONG, Jae Sung;RYU, Sang Hwan;JUNG, Jong Deok
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.6
    • /
    • pp.564-574
    • /
    • 2015
  • As shown by the popularity of the rapid train in the Seoul Metro Line No. 9, the demand for the rapidization of the metro transit has been continuously increased. However, it needs tremendous cost to construct new additional infrastructures to the existing line for the rapidization. In order to overcome the problem, utilizing the existing infrastructures such as crossing tracks as railroad sidetracks can be considered to be a good method of reducing the cost. In this case, there is a way exploiting the existing train as an express train and the advanced train, which increases both acceleration and deceleration, as a local train, but achievable acceleration and deceleration have not been analyzed rigorously. In this paper, we analyze feasible ranges and optimal values of both acceleration and deceleration of the advanced train analytically when we consider the rapidization of the metro transit utilizing the existing infrastructures and verify the results in Seoul Metro Line No. 3. Simulation results show ranges and optimal values of achievable acceleration and deceleration exist when minimum gap between an express train and a local train is smaller than 40 seconds.

Establishment Model of Entrance and Exit User of Urban Railway Station (도시철도역 출입구 유출입 이용자 추정 모형 수립)

  • Kim, Hwang Bae;Lee, Sang Hwa;Bae, Choon Bong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.1
    • /
    • pp.81-91
    • /
    • 2019
  • Although the number of users of urban railways is greatly influenced by the land use plan around the railway station, Korea has been studying this problem in a small scale, so that the entrance width is uniformly calculated irrespective of the land use plan, And there is little deviation. Therefore, this study aims to establish a demand estimation model for the entrance and exit of urban railway stations. For this purpose, the demand, land use area, and socioeconomic indicators for each of the 20 urban railway stations were surveyed at 200m and 500m Regression model. The model is based on the assumption that the dependent variable (response variable) of the model is set to 1 day, peak 1 hour, peak time 5 minutes, Education, and park) and socioeconomic indicators (population, employer, employee, and student) as independent variables (explanatory variables). As a result, it was analyzed that the fit of the model is more statistically significant when the use area of the land use by 500 meters of the center radius of the city rail is used as an independent variable and the demand for the daily use of the railway station is used as a dependent variable. The purpose of this study is to estimate the optimal size of urban railway entrance in order to improve the mobility of the user and the transportation weak in urban railway station.

Development of Registration Post-Processing Technology to Homogenize the Density of the Scan Data of Earthwork Sites (토공현장 스캔데이터 밀도 균일화를 위한 정합 후처리 기술 개발)

  • Kim, Yonggun;Park, Suyeul;Kim, Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.689-699
    • /
    • 2022
  • Recently, high productivity capabilities have been improved due to the application of advanced technologies in various industries, but in the construction industry, productivity improvements have been relatively low. Research on advanced technology for the construction industry is being conducted quickly to overcome the current low productivity. Among advanced technologies, 3D scan technology is widely used for creating 3D digital terrain models at construction sites. In particular, the 3D digital terrain model provides basic data for construction automation processes, such as earthwork machine guidance and control. The quality of the 3D digital terrain model has a lot of influence not only on the performance and acquisition environment of the 3D scanner, but also on the denoising, registration and merging process, which is a preprocessing process for creating a 3D digital terrain model after acquiring terrain scan data. Therefore, it is necessary to improve the terrain scan data processing performance. This study seeks to solve the problem of density inhomogeneity in terrain scan data that arises during the pre-processing step. The study suggests a 'pixel-based point cloud comparison algorithm' and verifies the performance of the algorithm using terrain scan data obtained at an actual earthwork site.