A Study on Normal Project Duration for Water Resource Project (수자원시설 건설공사 표준공기 산정을 위한 기초연구)

  • Lee, Bongsu;Kim, Kinam;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • It is important to have enough design and construction duration for infrastructure projects. However, recent water resource project in Korea shows several problems caused by their fast-tract schedule. National Audit Committee report several water resource projects have quality problems caused by insufficient project duration. Especially, water resource projects such as dam and water pipeline construction should have proper time to secure their structure quality. Normal project duration for these projects should be estimated based on previous similar projects' historical data analysis. However there is no standard model which can estimate normal project duration for water resource projects in Korea. There are several normal project duration estimation models for building project developed by public(LH) and private construction companies. However, there is no proper model for water resource projects. So, this study developed normal project duration model for dam and water pipeline projects using historical data and show application of models.

정부의 항만개발정책에 관한 평가연구

  • 김성득
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 1995.10a
    • /
    • pp.38-38
    • /
    • 1995
  • 국가의 충체적 활성과 경쟁력 확보는 정부의 적절한 정책수행에 의해서만 가능하고 특히, 항만, 공항, 도로 철도 등 사회간접자본의 확충은 민간기업으로서는 할 수 없는 정부 고유의 역할이다. 정부는 여러 전문기관을 통해서 이러한 사업을 위한 연구를 수행하여 왔다. 1980년도 이후 급격히 증대되어온 해운물동량과 특히 컨테이너 물동량의 증대에 대비하면서 장내의 시설수요를 예측하고 현실에 닥치는 물류적체 해소를 위하여 부산항 3단계 공사등 긴급한 시설을 확충하여 왔다. (중략)

  • PDF

Case study of immersed tunnel for preservation of ecological environment (생태환경 보존을 위한 침매터널 사례연구)

  • Ahn, Sung Kwon;Lee, Hee Up
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.679-697
    • /
    • 2022
  • Having an awareness of the ongoing conception of Honam-Jeju, Korea-Japan, and Korea-China subsea tunnels for accommodating the railway, this paper investigates immersion tube tunnel technology, one of the underwater tunnel construction methods. This paper analyses the current status of immersed tube tunnels according to their location and function. This paper summarises the dredging methods and briefly introduces the muck disposal facility. Also introduced are the case studies where measures were taken to mitigate the impact of dredging on the surrounding marine environment. This paper also explains how the tunnel elements are connected underwater using an immersion joint. This paper classifies the foundation methods into bedding and ground improvement methods and provides summaries, including their environmental impact associated with drill cuttings and cementitious binders.

A Study on the Revitalization of Railway freight transportation Through forecasting of container volumes on Busan New & North port (신항과 북항의 철도물동량 예측에 따른 철도운송 활성화 방안에 관한 연구)

  • Cho, Sam-Hyun
    • Journal of Korea Port Economic Association
    • /
    • v.25 no.4
    • /
    • pp.131-146
    • /
    • 2009
  • The purpose of this study is to predict the railway cargo volume on Busan new-port and north-port, in order to revitalize railway transport. This paper is organized as follows. Section 1 presents the description of the objective and methods on this study. Section 2 presents the status of Railway Cargo volumes and Construction plan of railway facilities in Busan New port. Section 3 presents the Forecast Railway Cargo volume using a volume ratio, actual volume records and another predicted datas. Section 4 summarizes our conclusions and further research topics. Especially, korea faces enforcement of green Logistics policy. Modal shift to trail freight transportation is one of ways, but there are no more detail plans. so it need that a cooperation system in government department, a indirect subside policy shift to rail freight transportation from trucking for revitalization of Railway Freight transportation.

  • PDF

Exploring Delays of The Mega Construction Project: The Case of Korea High Speed Railway (대형 건설사업의 공기지연분석: 경부고속철도 건설사업을 중심으로)

  • Han, Seung Heon;Yun, Sung Min;Lee, Sang Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.839-848
    • /
    • 2006
  • Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.

A Comparative Study on the Service Characteristics for Transferring Process of High-Speed Rail and Domestic Airline Systems by Using Structural Equation Modeling (공분산구조분석을 이용한 고속철도와 국내항공의 이동단계별 서비스특성 비교연구)

  • Kim, Tae Ho;Jeong, Kwang Seop;Park, Je Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.183-190
    • /
    • 2009
  • In order to improve continuous success and stabilization of high-speed rail in the future, Using Frequency of high-speed rail should be enhanced by improving satisfaction of high-speed rail passenger. High-speed rail is needed to hold the priority in competition means by comparing the traits of service of domestic air lines. This study utilizes structural equation modeling to develop model for estimating factors influencing to service through conducting survey questionnaire. It also uses reliability analysis, correlation analysis, factor analysis to examine the rationalization of items and to establish hypothesis of this research. The results show that KTX contains 'inner service' item that is considered to be ameliorated and that domestic airline present low performance of 'outer service' item. In other words, moving section which partly is under a limited condition is needed to be improved. In addition, access to airport and transfer to other transportations have to be improved as they show the lowest satisfaction.

A Study for Safety Management on Ground Excavation by Analysis of Accident Events (사고사례 분석을 통한 흙막이 굴착공사 안전관리 개선방안 연구)

  • Seong, Joo Hyun;Jung, Soo Hyung;Shin, Ju Yeol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.6
    • /
    • pp.175-183
    • /
    • 2011
  • With recent growth of population and industry, urban development grows into grand scheme of excavation and construction in urban area. As the development progress advanced, the developments get large and deepen. With a progress of technology development in geotechnical engineering in Korea, most our grand scheme of projects follows great progress. On the other hand, some excavation in construction site caused direct or indirect event that affects the adjacent or surrounding structures by excavation from time to time. This event usually happens around residential and commercial area where underground tunnel, subway station, commercial building, and high-rises excavation site is, could lead great damage on economy as well as personal injury or human casualties. In order to prevent this event, the study has to be done with analysis on various events of excavation and its cause. In this paper, the research has collected the various excavation events and their causes to analyze on each site and event to define emphasis on surrounding environment.

An Establishment of Guideline and Evaluation Items for Before-and-After Study in Railroad Construction Projects (철도건설공사 사후평가 항목 및 지침 수립방안)

  • Kim, Yeon Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.2D
    • /
    • pp.315-322
    • /
    • 2011
  • The Korea government set a Act called as Before and After Study for a huge SOC projects in order to check their feasibility again at the time of design, construction and completion period. However, the evaluation items and analysis method are so vague that its effectiveness has been challenged. Especially railroad projects need to be evaluated differently by railroad construction types and rolling stocks. This paper suggests the evaluation items as a common items and exclusive items on the type of construction and rolling stocks. Also data collection in the standardized form and GIS techniques and are introduced to analyze evaluation items effectively.

Methodologies for Effective Construction Information Management of Railway Facilities through Linking 4D CAD to IETM (4D CAD와 IETM 연계를 통한 철도시설의 효율적인 공사정보관리 방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Park, Seo-Young;Kim, Hyun-Soo;Ahn, Jae-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.139-142
    • /
    • 2008
  • Construction Management by using 4D CAD system analyzes operations information based on 3D and 4D objects. But it is difficult to provide a variety of documents linked by 4D objects in a lump from 4D CAD system based on visual object, and to get an optimal decision-making information to conduct business. Therefore, it is necessary to construct effective construction information management systems and to organize integrated information through linking non-objects to objects. This study suggests methodologies of effective construction management for railway facilities through building of framework for practical application and methodologies to link 4D objects to IETM documents. Accordingly, it is possible to establish a systematic decision-making for an effective construction management of railway facilities, and this provide integrated methodology for linking non-objects to objects.

  • PDF

The Analysis on Container Railroad Transit Capacity in Busan Port (부산항 컨테이너화물의 철송 능력 분석)

  • Hur, Yun-Su;Lee, Jae-Won
    • Journal of Navigation and Port Research
    • /
    • v.27 no.5
    • /
    • pp.585-591
    • /
    • 2003
  • Recently, South korea is driving forward the strategy concerning of the logistics center of northeast asia aggressively on the purpose of promoting Busan port & Gwangyang port to the hub-port of northeast asia, In that situation, it is significant that the meaning, construction connecting between south and north railway. Namely, That is the reason why Busan port is satisfied with the combined transport system of not only marine transportation but also railway transportation completely, However, the research and policy is only focused on the connection of north-south railway so far. The ability of Buans railway equipment as the actual role of origin-destination point of TKR(Trans Korean Railway), was not reviewed. Therefore, this research is shown the problem and reality of the railway transport concerning the centralization of Busan port, and the capacity of Busan port railway facility regarding the increase of future container quantity is reviewed and analyzed Moreover, the object, shown the importance of facility expansion such as Gungbu Trans Express between Daegu and Busan and the improvement scheme for railway transportation activation through the analysis of society cost and the logistics cost of the ability of railway facility, is set up.