An Establishment of Guideline and Evaluation Items for Before-and-After Study in Railroad Construction Projects  

Kim, Yeon Kyu (한국교통연구원 철도연구실)
Publication Information
KSCE Journal of Civil and Environmental Engineering Research / v.31, no.2D, 2011 , pp. 315-322 More about this Journal
Abstract
The Korea government set a Act called as Before and After Study for a huge SOC projects in order to check their feasibility again at the time of design, construction and completion period. However, the evaluation items and analysis method are so vague that its effectiveness has been challenged. Especially railroad projects need to be evaluated differently by railroad construction types and rolling stocks. This paper suggests the evaluation items as a common items and exclusive items on the type of construction and rolling stocks. Also data collection in the standardized form and GIS techniques and are introduced to analyze evaluation items effectively.
Keywords
railroad construction; before and after study; GIS; feasibility study; standardization;
Citations & Related Records
연도 인용수 순위
  • Reference
1 국토해양부(2003) 건설기술관리법 시행령 제38조의 18, 법제처.
2 국토해양부(2009) 교통시설 투자평가지침.
3 김시곤(2006) 철도건설사업 사후평가체계 정립, 서울과학기술대학교.
4 캐드랜드(1995) Working with the ArcView Spatial Analyst.
5 ESRI (1996) using ArcView GIS.
6 KDI 공공투자관리센타(2008) 도로.철도 부문 사업의 예비타당성 조사 표준지침 수정.보완연구(제5판).