• Title/Summary/Keyword: 천공홀

Search Result 27, Processing Time 0.019 seconds

A Study on Characteristics of the Unit Skin Friction Using the Wall Roughness in the Soft Rock (연암부 벽면거칠기를 이용한 단위주면마찰력 특성에 관한 연구)

  • Hong, Seok-Woo;Hwang, Geun-Bae
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.12
    • /
    • pp.7-13
    • /
    • 2019
  • In the case of the drilled shaft, one of the methods for calculating unit skin friction stress of rock socket parts is to measure the roughness of the excavated face. This method is to estimate the unit skin frictional resistance using a device which measures the roughness shape of the excavated face in the excavation step. In this study, the roughness shapes of the face of the rock socket part in the drilled shaft were measured directly in the perforated hole and the results are used to identify the characteristics of the unit skin friction of the bedrock. In addition, the static load test and the load transfer test were performed on the same pile to verify the result of the roughness test.

Evaluation of Reinforcing Effects of Pressure-Injected Grouting Nail in Weathered Rock (풍화암 사면에서의 압력분사 그라우팅 네일 보강 효과 연구)

  • Hwang, Young-Cheol;Kim, Nak-Young
    • Journal of the Korean GEO-environmental Society
    • /
    • v.3 no.1
    • /
    • pp.47-55
    • /
    • 2002
  • The slope reinforcing method utilized in this paper reinforces the ground overall by means of filling borehole as well as permeating grout material into ground by injecting it through the grouting pipe. In order to reflect these characteristics to design, not only the ground reinforcing effect by the structural material itself but also the ground strength improvement effect by the grouting injection must be quantitively evaluated. But precedent research of it has been insufficient. Therefore, the slope reinforcing method was applied to the weathered rockmass slope situated in the highway in order to analyze reinforcing effect and the instrumentation of slope was performed. Through analysis of this field test, the slope reinforcing method was proved to be effective and back analysis method based on instrumentation values of slope was proposed to apply to reinforcing design. In this paper, the effectiveness of reinforcing method was certified through proposed back analysis.

  • PDF

Evaluation of Tool Paths and NC Codes Generation for PCB Drilling Operations (PCB 홀 천공순서의 평가 및 NC 코드의 생성)

  • Choi, Hoo-Gon;Lee, Ho-Chan;Seo, Jun-Sung
    • IE interfaces
    • /
    • v.10 no.1
    • /
    • pp.223-235
    • /
    • 1997
  • The process of determining the optimal tool path in PCB(printed circuit board) drilling operations is identical with that of solving a TSP(traveling salesman problem). However, the optimal solution will be ruined when a drill bit needs tracking back in its tool paths. The back tracking occurrences shorten a life of the main spindle and result in inaccurate mechanical movements. In this study, the performances of four heuristics(Nearest Neighbor, Convex Hull, Greatest Angle and Most Eccentric Ellipse) are evaluated to obtain feasible tool paths along with less number of back trackings for a large number of holes(more than 2000holes/bit) and to generate corresponding NC codes for a given CNC drill. Also, the operations of these algorithms are visualized to show a user the graphic image of tool visitation with PCB holes on a computer screen.

  • PDF

Failure of Cross-Pin Femoral Fixation after Anterior Cruciate Ligament Reconstruction - A Case Report - (전방십자인대 재건술후 대퇴골 경골핀 고정의 실패 - 증례보고 -)

  • Lee Kee-Byoung;Kwon Duck-Joo;Ji Yong-Nam
    • Journal of the Korean Arthroscopy Society
    • /
    • v.7 no.1
    • /
    • pp.92-95
    • /
    • 2003
  • A 34-year-old man with ACL total rupture due to slip down injury, had received ACL reconstruction using autogenous hamstrings tendon with cross-pin femoral fixation. Postoperative course was as usual. But postoperative 3 months later, he complained posterolateral knee pain, recurrent effusion and mild instability. He was managed repeatitive aspiration and nonsteroid antiinflammatory drugs but was failed to relieve symptoms & signs. In CT scans, perforation of posteromedial femoral cortex of lateral femoral condyle was found. In second look arthroscopy, two pieces of broken femoral cross pin were found in between tibiofemoral Joint which was badly injured cartilage. We considered malposition of pins was the main cause of failure. We propose that femoral tunnel must be made more acute angle and femoral cross-pin guide must be positioned more external rotation 10-20 degree than transepicondylar axis made confirm the cross-pin tunnel position in order to avoid posterior cortex perforation and early failure.

  • PDF

A Study on the Physical Behavior and the Applicability of Rock Anchorage System of a Suspension Bridge in Domestic Island (현수교 지중정착식 앵커리지의 거동특성과 국내 도서지역에서의 적용성에 대한 연구)

  • Yang, Euikyu;Choi, Youngseok;Choi, Kyungseob;Kim, Daehak;Jeon, Yongjun
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.2
    • /
    • pp.33-48
    • /
    • 2021
  • The rock anchorage of a suspension bridge is an outstanding anchorage type from environmental and economical perspective, although it should be applied when the bearing foundation is fresh enough to resist large cable loads. In practice, geotechnical engineers have encountered difficulties in designing the anchorage structure due to the fact that the physical behaviors of rocks against cable loads have not yet been fully proved and its design method was not established yet. In this study, model tests and numerical studies were performed to evaluate the behavior of the rock anchorage system planned under hard rock layers in domestic islands, and results suggest that the shape of asymmetric rock wedges can resist the tension loads with self weight and shear resistance. Additionally, real scale trial tests were carried out to verify the accuracy of an inclined drilling penetrating hard rock layers to install tendon to the bearing plate.

Expansion Ratio and Ultimate Load of Pulse-Discharge Bulbed Anchors (펄스방전 그라운드 앵커의 확공특성 및 극한인발력에 관한 연구)

  • Kim, Nak-Kyung;Kim, Sung-Kyu;Joo, Yong-Sun;Seo, Hyo-Kyun;Kim, Sun-Ju
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.7
    • /
    • pp.5-10
    • /
    • 2009
  • The ground anchor is not usually used in soft clay and loose sand, because the pullout resistance of anchors can not be guaranteed. However, there is a method to increase the capacity of anchors using electric discharge geotechnical technologies, which are also known as pulse discharge and electric-spark technologies. The pulse-discharge anchor has a bulbed (or underreamed) bond length that is expanded by high voltage electrokinetic pulse energy. 24 anchors were installed in the weathered soil and sandy clay at the Geotechnical Experimentation Site at Sungkyunkwan University in Suwon, Korea. In this study, in order to define a relation between expansion rate of the anchor diameter and ultimate load, anchor load tests were carried out in accordance with testing procedures by AASHTO (AASHTO 1990) and FHWA (Weatheb 1998). And then several anchors were exhumed to measure the diameter of the pulse discharge anchors.

Empirical Model of Via-Hole Structures in High-Count Multi-Layered Printed Circuit Board (HCML 배선기판에서 비아홀 구조에 대한 경험적 모델)

  • Kim, Young-Woo;Lim, Yeong-Seog
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.47 no.12
    • /
    • pp.55-67
    • /
    • 2010
  • The electrical properties of a back drilled via-hole (BDH) without the open-stub and the plated through via-hole (PTH) with the open-stub, which is called the conventional structure, in a high-count multi~layered (HCML) printed circuit board (PCB) were investigated for a high-speed digital system, and a selected inner layer to transmit a high-speed signal was farthest away from the side to mount the component. Within 10 GHz of the broadband frequency, a design of experiment (DOE) methodology was carried out with three cause factors of each via-hole structure, which were the distance between the via-holes, the dimensions of drilling pad and the anti-pad in the ground plane, and then the relation between cause and result factors which were the maximum return loss, the half-power frequency, and the minimum insertion loss was analyzed. Subsequently, the empirical formulae resulting in a macro model were extracted and compared with the experiment results. Even, out of the cause range, the calculated results obtained from the macro model can be also matched with the measured results within 5 % of the error.

A Pilot Study of Stiffness Mesurements for Tunnel-Face Materials Using In-hole Seismic Method (인홀 시험을 이용한 터널 막장의 암반강성 측정에 대한 적용성 연구)

  • Mok Young-Jin;Kim Young-Su
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.5
    • /
    • pp.133-142
    • /
    • 2005
  • The research concentrates on improving the in-hole seismic probe, which has been developed in past five years, to be used in stiffness measurements of tunnel-face materials. The size of probe was reduced to be fit in 45-mm diameter holes (or BX) drilled by a jumbo-drill, which is used to drill holes to install explosives for tunneling. Also trigger system was improved by using a down-speeding motor for operating convenience and air packing system was replaced with a set of plate-springs to eliminate supply of compressed air. These modifications are to adjust the probe for the unfavourable environment inside of tunnels and to test without any further drilling cost. The probe and testing procedure were successfully adopted with horizontal holes drilled by a jumbo-drill at a tunnel-face to evaluate the stiffness of rock mass. The measured shear wave velocities can be used to estimate deformation properties of rock mass for tunnel analyses.

An Experimental Study on the Application of End-Expanded Soil Nailing Method (선단확장식 소일네일링 공법의 적용성에 관한 실험적 연구)

  • Lee, Sang-Eun;Jang, Yun-Ho;Moon, Chang-Yeul;Jeong, Gyo-Cheol;Park, Young-Sun
    • The Journal of Engineering Geology
    • /
    • v.17 no.4
    • /
    • pp.525-534
    • /
    • 2007
  • The peculiarity of end-expanded soil nailing method(EESNM) is in fixing the wedge-type steel body spreaded by collars and grouting its surroundings by cement milk within soils, after extending hole bottom over drilling hole diameter with top drill bit. The present study was done to establish the effect of this method. Laboratory model test were carried out to investigate the behavior characteristics with the performance of the pull-out test and failure experiment, after preparing soil test box having 1,300mm length, width 1,000mm, and height 1,100mm, and the same experimental condition was set up to compare with the general soil nailing method(GSNM). The pull-out force of about 23 percentage was increased, and the horizontal displacements 1.2 from 9.1 percentage in soil-nailed wall decreased in EESNM compare with GSNM. The axial force acting on nail increased considerably at load level over 7 ton in EESNM and 5 ton in GSNM. The predicted failure line from the maxima analyzed by axial tensile strain located at long distance from soil-nailed wall in EESNM. The EESNM demonstrated the superiority of reinforcement effect in comparison with GSNM from the results above mentioned.

Anchorage mechanism of inflatable steel pipe rockbolt depending on rock stiffness (팽창형 강관 록볼트의 암반 강성에 따른 정착 거동 특성)

  • Kim, Kyeong-Cheol;Kim, Ho-Jong;Jung, Young-Hoon;Shin, Jong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.249-263
    • /
    • 2017
  • The expansion behavior of inflatable steel pipe rockbolt shows geometric nonlinearity due to its ${\Omega}-shaped$ section. Previous studies on the anchoring behavior of inflatable steel pipe rockbolt were mainly performed using theoretical method. However, those studies oversimplified the actual behavior by assuming isotropic expansion of inflatable steel pipe rockbolt. In this study, the anchoring behavior of the inflatable steel pipe rockbolt were investigated by the numerical method considering the irregularity of pipe expansion and other influencing factors. The expansion of inflatable steel pipe rockbolt, the contact stress distribution and the change of the average contact stress and the contact area during installation were analyzed. The contact stresses were developed differently depending on the constitutive behavior of rocks. Small contact stresses occurred in steel pipes installed in elasto-plastic rock compared to steel pipes installed in elastic rock. Also, the anchoring behaviors of the inflatable steel pipe rockbolt were different according to the stiffness of the rock. The steel pipe was completely unfolded in the case of the stiffness smaller than 0.5 GPa, but it was not fully unfolded in the case of the stiffness larger than 0.5 GPa for the given analysis condition. When the steel pipe is completely unfolded, the contact stress increases as the rock stiffness increases. However, the contact stress decreases as the rock stiffness increases when the steel pipe is not fully expanded.