Abstract

The ground anchor is not usually used in soft clay and loose sand, because the pullout resistance of anchors can not be guaranteed. However, there is a method to increase the capacity of anchors using electric discharge geotechnical technologies, which are also known as pulse discharge and electric-spark technologies. The pulse-discharge anchor has a bulbed (or underreamed) bond length that is expanded by high voltage electrokinetic pulse energy. 24 anchors were installed in the weathered soil and sandy clay at the Geotechnical Experimentation Site at Sungkyunkwan University in Suwon, Korea. In this study, in order to define a relation between expansion rate of the anchor diameter and ultimate load, anchor load tests were carried out in accordance with testing procedures by AASHTO (AASHTO 1990) and FHWA (Weatheb 1998). And then several anchors were exhumed to measure the diameter of the pulse discharge anchors.

느슨한 사질토나 연약 점토층에서는 큰 앵커 극한인발력 확보가 어렵기 때문에 앵커공법이 잘 적용되지 않는다. 그러나 앵커 천공 홀을 다양한 방법으로 확공시키는 기술이 개발되어 있으며 이러한 기술로 인하여 느슨한 사질토 및 연약 점토에서 비교적 큰 극한인발력을 확보할 수 있게 되었다. 특히, 축적된 전기에너지를 짧은 시간에 방전시키는 펄스방전 공법은 앵커 정착장을 천공 케이싱 또는 비트 직경보다 크게 확공시키는 공법이다. 총 24공의 앵커를 성균관 대학교 지반시험장 풍화토 및 모래질 점토층에 시공하였다. 극한인발력과 앵커 확공비와의 관계를 확인하기 위해 AASHTO에서 규정하고 있는 시험방법으로 인발시험이 수행되었으며 펄스방전에 의해 확공된 앵커의 직경을 확인하기 위해 7공의 앵커를 굴착하였다.

Keywords

References

  1. 김낙경 (2001), "풍화토 지반에 설치된 앵커의 인발특성" 한국 지반공학회지논문집, 제17권, 4호. pp.231-239
  2. 김성규 (2000), "압축형 그라운드 앵커의 하중전이에 관한 연구" 공학석사 학위논문, 성균관 대학교
  3. 김태훈, 차경섭, 김선주, 김유석, 김경오, 고부현 (2007), "펄스압에 의한 지반의 확공특성" 한국지반공학회 가을학술발표회 논문집, pp.842-852
  4. AASHTO (1990), "Permanent Ground Anchor Specification In-situ Soil Improvement Technique", AASHTO-AGC-ARTBA TF27 Rep., AASHTO,Washington, D.C
  5. Briaud, J. L., Powers, W. F., Weatherby, D. E. (1998), "Should Grouted Anchors Have Short Tendon Bond Length?", ASCE, Journal of Geotechnical and Geoenvironmental Engineering, Vol.124, No.2, pp.110-119 https://doi.org/10.1061/(ASCE)1090-0241(1998)124:2(110)
  6. FHWA-IF-99-015 (1999), "Ground Anchors and Anchored Systems"
  7. Kim, Nak-kyung (2000), "Load Transfer on Ground Anchors in Weathered Soil", Ground International Conf. On Improvement Technique, Singapore, pp.217-226
  8. Kim, Nak-Kyung (2003), "Performance of Tension and Compression Anchors in Weathered Soil", ASCE, Journal of Geotechnical and Geoenvironmental Engineering, Vol.129, No.2, pp.1138-1150 https://doi.org/10.1061/(ASCE)1090-0241(2003)129:12(1138)
  9. Littlejohn, G. S. (1970a), "Soil Anchors", Proceedings of a Conference Organized by the Institution of Civil Engineers in London, pp. 33-44
  10. Littlejohn, G. S. (1980), "Design Estimation of the Ultimate Load- Holding Capacity of Ground Anchors", Journal of the Boston Society of Civil Engineers Section, American Society of Civil Engineers, v.67, No.3, pp.131-154
  11. Nak-Kyung Kim, Jong-Sik Park, Sung-Kyu Kim (2007), "Numerical simulation of ground anchors", Journal of Computers and Geotechnics, Vol.34, pp.498-507 https://doi.org/10.1016/j.compgeo.2006.09.002