Expansion Ratio and Ultimate Load of Pulse-Discharge Bulbed Anchors  

Kim, Nak-Kyung (Dept. of Civil Engrg., Sungkyunkwan Univ.)
Kim, Sung-Kyu (Dept. of Civil Engrg., Sungkyunkwan Univ.)
Joo, Yong-Sun (Dept. of Civil Engrg., Sungkyunkwan Univ.)
Seo, Hyo-Kyun (Dept. of Civil Engrg., Sungkyunkwan Univ.)
Kim, Sun-Ju (Daewoo Research Institute of Technology)
Publication Information
Journal of the Korean Geotechnical Society / v.25, no.7, 2009 , pp. 5-10 More about this Journal
Abstract
The ground anchor is not usually used in soft clay and loose sand, because the pullout resistance of anchors can not be guaranteed. However, there is a method to increase the capacity of anchors using electric discharge geotechnical technologies, which are also known as pulse discharge and electric-spark technologies. The pulse-discharge anchor has a bulbed (or underreamed) bond length that is expanded by high voltage electrokinetic pulse energy. 24 anchors were installed in the weathered soil and sandy clay at the Geotechnical Experimentation Site at Sungkyunkwan University in Suwon, Korea. In this study, in order to define a relation between expansion rate of the anchor diameter and ultimate load, anchor load tests were carried out in accordance with testing procedures by AASHTO (AASHTO 1990) and FHWA (Weatheb 1998). And then several anchors were exhumed to measure the diameter of the pulse discharge anchors.
Keywords
Bulbed anchor; Electric discharge; Expansion Ratio; Field test; Pullout load test; Pulse discharge; Ultimate load; Underreamed anchor;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Briaud, J. L., Powers, W. F., Weatherby, D. E. (1998), "Should Grouted Anchors Have Short Tendon Bond Length?", ASCE, Journal of Geotechnical and Geoenvironmental Engineering, Vol.124, No.2, pp.110-119   DOI   ScienceOn
2 Littlejohn, G. S. (1980), "Design Estimation of the Ultimate Load- Holding Capacity of Ground Anchors", Journal of the Boston Society of Civil Engineers Section, American Society of Civil Engineers, v.67, No.3, pp.131-154
3 AASHTO (1990), "Permanent Ground Anchor Specification In-situ Soil Improvement Technique", AASHTO-AGC-ARTBA TF27 Rep., AASHTO,Washington, D.C
4 김낙경 (2001), "풍화토 지반에 설치된 앵커의 인발특성" 한국 지반공학회지논문집, 제17권, 4호. pp.231-239
5 김태훈, 차경섭, 김선주, 김유석, 김경오, 고부현 (2007), "펄스압에 의한 지반의 확공특성" 한국지반공학회 가을학술발표회 논문집, pp.842-852
6 FHWA-IF-99-015 (1999), "Ground Anchors and Anchored Systems"
7 Nak-Kyung Kim, Jong-Sik Park, Sung-Kyu Kim (2007), "Numerical simulation of ground anchors", Journal of Computers and Geotechnics, Vol.34, pp.498-507   DOI   ScienceOn
8 김성규 (2000), "압축형 그라운드 앵커의 하중전이에 관한 연구" 공학석사 학위논문, 성균관 대학교
9 Littlejohn, G. S. (1970a), "Soil Anchors", Proceedings of a Conference Organized by the Institution of Civil Engineers in London, pp. 33-44
10 Kim, Nak-kyung (2000), "Load Transfer on Ground Anchors in Weathered Soil", Ground International Conf. On Improvement Technique, Singapore, pp.217-226
11 Kim, Nak-Kyung (2003), "Performance of Tension and Compression Anchors in Weathered Soil", ASCE, Journal of Geotechnical and Geoenvironmental Engineering, Vol.129, No.2, pp.1138-1150   DOI   ScienceOn