Scheduling Risk Management at the Preconstruction Phase (공사 착공 전 단계의 공정리스크 대응방안)

  • Park Ji-Hoon;Kim Sun-Kuk;Han Choong-He
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.457-461
    • /
    • 2004
  • The insufficient management o( the risk of preconstruction phase causes the risk of construction phase so it makes bad effects such as the extension of construction time and raising of cost. Therefore, the management of the risk of preconstruction phase is being considered as an important element of success of project and the competitive power of construction companies. This study Is to suggest solution methods for each progress after examining reasons of the risk for the management of the risk of preconstruction phase 1'he progress is limited as earth work, RC work, steel work and curtain wall work. Through the introduction of Knowledge Management system, work flow is made by specialist of each part. The reasons of the risk of progress are chosen through the analysis of work flow and I suggest detailed solutions such as person in charge, the starting point of progress and the information of requirements according to the grade of importance about elements of the risk

  • PDF

The Development and Application of Schedule Management Tools in Building Construction (건설 공정리스크 관리도구 개발 및 활용방안)

  • Jung Woo-Joon;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.384-387
    • /
    • 2004
  • It is very important to manage the risk in building construction because construction process has too many internal risk compared with others. So construction managers need more developed risk management system than the Present. While the study for the solution and management of generated risk is comparatively enough, the effort to confirm the risk of construction phase on pre-construction phase haying an major effect on total duration, is insufficient. For supporting the schedule risk management of pre-construction, this study suggests the reclassified risk breakdown structure and the investigation form for advance preparations on pre-construction Phase, which help the Poorly experienced construction manager to make more correct decisions and efficiently to execute risk management.

  • PDF

환경오염이 건설안전에 미치는 영향

  • 갈원모;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.11a
    • /
    • pp.384-389
    • /
    • 2002
  • 건설현장에 환경과 관련된 압박요인이 작용한 것은 불과 몇 년 전이었으나 그 강도는 크게 증가하여 실행예산 내에서 공사를 마무리하기 위한 큰 부담요인이 되고 있다. 대부분의 건설 공사는 설계단계에 있어서는 환경문제의 수준을 예상치 못하고 착공에 들어가는 경우가 많다. 분진이나 기타 소음, 진동 등의 환경적 문제는 부지굴착 중이나 시공 중에 그 중요성이 인식된다.(중략)

  • PDF

Blog-based Schedule Risk Management System (블로그 기반 공정리스크 관리시스템)

  • Jin, Soo-Myeong;Yoon, You-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.47-56
    • /
    • 2009
  • As contemporary society becomes information-oriented, major construction companies have recently invested in information management, but small and medium ones have not. Though the small and medium companies recognize the information management is necessary and important, they don't have an ability to possess technical expertises. The purpose of this study is to develop a Schedule Risk Control System based on blogs using IT and web technologies for construction managers in small and medium construction companies. The system makes a chance to identify risk factors and prepare for responses to settle risks happened in preconstruction phases, and enables the managers and headquarters to predict and handle schedule risks by sharing information about risks on the blogs.

The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work - (건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 -)

  • Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.177-185
    • /
    • 2005
  • The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.

Prediction of Shoreline and Depth Contour Change after Construction Project for North Breakwater at the Donghae Port by N-line Model (N-Line 모델을 이용한 동해항 3단계 북방파제 축조공사 후 해안선 및 등수심선 변화 예측)

  • Lee, Sahong;Kim, Dong Hee;Lee, Jung Lyul
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.32-32
    • /
    • 2016
  • 정부는 1999년 제정된 연안관리법에 따라 2000년부터 시행 중인 '연안정비계획' 등을 통하여 연안 침식 대응사업을 지원하고 있다. 그러나 연안의 개발은 지속적으로 일어나고 있으며 그 중 동해항 3단계 북방파제 축조공사가 내년 3월 중으로 착공할 것으로 예상된다. 동해항 3단계 개발사업은 동해항을 환동해권 물류 중심 거점 항만으로 육성하기 위해, 오는 2020년까지 대규모 항만개발과 방파제 등이 축조될 예정이다. 이에 따라 본 연구에서는 동해항 3단계 개발사업의 추진에 따른 인근해변의 해안침식 저감대책 방안으로 해안선 및 수심 변화를 예측하고자 한다. 동해항 인근의 추암 해수욕장부터 삼척 해수욕장까지 대상지역 N-line 모델 적용 및 Case분석을 실시한다. 해안선 변화는 Polar coordinate에서 개발된 One-line 모델에 회절 효과를 반영하고 해빈 경사와 쇄파고에 따라 횡단 방향으로 발생하는 표사로 인한 추가적인 해안선 변화 효과를 반영하여 입사파고 변동에 따른 단기적인 해안선 변화의 변동 폭을 제공한다. 연평균 입사 파고에 따라 형성되는 연안방향 표사로부터 해안선이 변동하며 이 해안선을 기준으로 연평균 파고에 따른 전진 폭과 최고 파고에 따른 침식 폭을 제시한다. 동해항 개발 전 변화 예측 모델링과 동해항 개발 후 변화 예측 모델링을 통해 개발에 따른 장래 해안선의 변화 예측 모델링 결과 분석 및 검토를 실시, 동해항 인근 지역에 적합한 해안선 유지관리 방법 결정 및 제안을 하는데 도움을 줄 것이라 기대된다.

  • PDF

Analysis of Hydrodynamic Change around the Saemangeum Area Using a Particle Tracking Method (입자추적방법을 이용한 새만금 해역의 수리특성 변화 분석)

  • Suh, Seung-Won;Lee, Hwa-Young
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.23 no.6
    • /
    • pp.442-450
    • /
    • 2011
  • A three dimensional random walk particle tracking method is applied to the Saemangeum area in order to find stepwise environmental changes according to long term construction. Flow regime around Mangyeong, Dongjin and Geum river estuary changed greatly due to dike construction. It is distinctive that reduction of Byeonsan area's flow field and stagnant change in the northern part of the inner reservoir. Similar characteristics are found through the tidal excursion analysis. By analysis of the vertical mixing structures according to density stratification based on temperature and salinity variation, a salt wedge and very strong stratification arises in the inner part of the reservoir after final closure, while it has been well mixed or partially mixed estuary during construction. Shrinking of horizontal dispersion and vertical mixing capability may cause adverse effect on water quality not only inner part but also outer region of the Saemangeum reservoir.

The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall (커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안)

  • Jung Tae-Sik;Kim chang-duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.71-79
    • /
    • 2005
  • As construction projects have been extremely enormous, complex and special, risk factors have been increased consistently. Therefore, it is very important to identify and cope with the uncertain risk factors in such building constructions for successful project accomplishment. The purpose of this research is to approach practical affairs directly and show detail alternatives of risk factors by extracting the risk factors throughout construction process of curtain wall that is largely influenced on cost, quality, schedule ,safety and following activity. Also, extracting these risk factors make it possible to analyze quantitative risk and decide the priority raking of risk factors. Especially, this research is aimed to provide efficient management of scheduling risk that can make the risk minimize to practical workers who have different degree of knowledge and experience to the construction cite when the risk brings out suddenly.

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

Building up User-Oriented Road Planning and Design Schemes (국민참여형 도로계획의 수립방향)

  • Kim, Eung-Cheol;Kwon, Young-In;Yun, Seong-Soon;Kang, Jin-Goo
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.47-55
    • /
    • 2005
  • Roads deeply affect the life of people and keep doing an important role to support economic growth of a country. According to the budget plan of the ministry of construction and transportation of Korea, 8.1 trillion won have been allotted for road investment in the year of 2002 which occupy 61% of the transportation infrastructure special account (13.3 trillion won) and 4.7% of the total national budget (1,740 trillion won). It is true that services generated from road investment such as mobility enhancement and increased accessibility have shown positive effects through shortened travel time and decreased vehicle operating cost. However, it is also notable that many negative effects are gradually being discussed and those are nowadays getting severer due to enhanced people interests about road construction, increased concerns on environment and active public involvement that were evoked by traffic accidents, air pollution & noise and destruction of environment. Road construction processes in Korea are normally governed by administrative sectors (suppliers) not by users. These processes ate very weak to accomodate user s needs and community concerns thus easy to fail finalizing a road project without hassles. A public hearing process is supposed to be held in the processes of detailed design step and the environmental impact analysis. However, it is not enough to grab user's needs and community concerns. Increased public involvement frequencies, optimized public involvement timing and enhanced depth of public involvement magnitude are suggested to improve the current poor public involvement schemes in road planning and design processes. The application of these recommended methods to the road planning and design processes may guarantee the change from the current supplier-oriented schemes to the new user-oriented one. Also, this study suggests to reset objectivity and clarity of road construction process, to make conciliation guidelines based on many practical cases that produced good results, to introduce public involvement techniques in a stepwise basis, and to foster the professionals via education and training programs.