• Title/Summary/Keyword: 지반 굴착

Search Result 1,176, Processing Time 0.025 seconds

Coupled Distinct Element and Boundary Element Analysis of Problems Having Infinite or Semi-infinite Boundaries (개별요소와 경계요소 조합에 의한 무한 및 반무한 영역문제의 해석)

  • Huh, Taik Nyung;Kim, Moon Kyum;Hwang, Hak Joo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.4
    • /
    • pp.81-93
    • /
    • 1992
  • Numerical modeling of problems having infinite and semi-infinite boundaries is studied using a coupled method of distinct elements and boundary elements. The regions which are restricted on stress concentration area of loading points, excavation surface, and geometric discontinuity in the underground structures, are modeled using distinct elements, while the infinite and semi-infinite regions are modeled using linear boundary elements. Linear boundary elements for infinite and semi-infinite region are respectively composed using the Kelvin's and the Melan's solution, respectively. For the completeness, the boundary element method, the distinct element, and the coupled method of distinct elements and boundary elements are studied independently. The coupled method is verified and is applied to underground structures of infinite and semi-infinite regions. Through the comparison of the results, it is concluded that the coupled analysis may be used for discontinuous underground structures in the effective manner.

  • PDF

Improvement of Domestic Design Criteria of Tunnel Maintenance Monitoring and Latest Technology Trend (터널 유지관리 계측의 국내설계기준 개선 및 최신 기술동향)

  • Baek, Kyung Jong;Kwon, Young Eok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.9-16
    • /
    • 2014
  • Though the maintenance monitoring of structurally weak parts of the tunnel structure in public service must be judged in connection with the monitoring during the construction period for analysis of the behavior of the ground and surrounding structures following the tunnel excavation for the effective management, the monitoring during the construction period and the maintenance monitoring are implemented separately on the basis of the periods of construction and maintenance, so the connectivity and systematic management of the related data are mostly inadequate. The improvement direction is suggested in this thesis, by analyzing the problems of tunnel monitoring in the domestic design criteria. And, it is anticipated that from now on the use of hi-tech sensors and wireless communications technology will proceed vigorously in the maintenance, so considering these situations, the development and application of the maintenance monitoring system and the revision of the domestic design criteria and specification are needed in the future.

A numerical study of the influence of rock mass classes boundary on tunnel stability (암반 등급 경계가 터널 안정성에 미치는 영향에 관한 수치해석적 연구)

  • Kim, Gyeomyeon;Jung, Chanmook;Lee, Yongjun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.825-835
    • /
    • 2019
  • When the tunnel is designed, the ground is classified into several grades and the corresponding support system is applied according to the support pattern table. However, a simple pattern application based on rock grade does not take into account the longitudinal stress transitions occurring at rock grade boundaries. In this study, three-dimensional numerical analysis was performed to estimate the stress change in the longitudinal rock grade change of NATM tunnel, and the influence zone of load transfer was investigated using the influence line and trend line. As a result, the downward change of rock grade in the direction of tunnel excavation occurs in the range of 0.35~0.7D from low-strength rock to high-strength rock around the grade change boundary. It is necessary to apply a downward pattern of about 1.0D to the safety direction in consideration of the influence range of 0.35D to 0.7D.

The Design Charts for Soil Nailing Slopes Through Limit Equilibrium Method (한계평형해석을 사용한 Soil Nailing보강사면의 설계도표의 제안)

  • Kim, Hak-Moon;Jang, Kyung-Jun;Seo, Jin-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2794-2802
    • /
    • 2009
  • Soil nailing method is widely used in reinforcing slopes and excavating earth. The analysis of nail-reinforced slopes, generally require complicated computer programs. The purpose of this paper is suggest, Soil stability Chart for nailed slopes which are very useful for pre-design, rapidly design, and final check. Three slope types, three nail lengths and three nail angles are selected for the stability analysis by using limit equilibrium method form Bishop and French. From the above results, this study propose the reinforced design charts for examine the necessity of reinforcement can be examined. The suggested stability chart and Taylor's Slope Stability Chart, showed similar safety factors. This Soil Nailing design charts can provide the solutions for necessity of reinforcement, economical of nail's length ratio and installation angle as well.

Performance evaluation of lattice girder depending on the quality of steel (강재 품질에 따른 격자지보재의 성능평가)

  • Jung, Hyuk-Sang;Shin, Young-Wan;Song, Ki-Il;Shin, Jong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.2
    • /
    • pp.165-173
    • /
    • 2016
  • This paper dealt with contents on the performance evaluation of standardized steel and non-standardized steel of lattice girder. Lattice girder is arch type tunnel supports made of structural steel bar and it is girder used to ensure the stability of tunnel by suppressing any transformation of ground as much as possible during tunnel excavation. The performance evaluation of lattice girder can be conducted through bending strength test, tensile strength test and tunnel standard specification specifies that welding structural steel with over 500MPa yield strength shall be used. However, it is difficult to distinguish visually between standardized steel and non-standardized steel onsite if low-quality structural steel is used. Accordingly, this paper conducted performance evaluation of standardized steel and non-standardized steel of lattice girder to point out the issue of deteriorated yield strength of non-standardized steel, while proposed a method of verifying yield strength onsite.

Analysis and cause of occurrence of lining cracks on NATM tunnel based on the precise inspection for safety and diagnosis - Part I (정밀안전진단 결과를 활용한 NATM터널(무근)의 라이닝 균열 종류별 발생원인 및 분석 - Part I)

  • Choo, Jin-Ho;Park, Sung-Woo;Kim, Hyung-Tak;Jee, Kee-Hwan;Yoon, Tae-Gook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.199-214
    • /
    • 2011
  • A crack is the main cause to affect the integrity of tunnel lining as well as leakage, spalling, exposed rebar, corrosion, carbonation and so on. Since the 1980, NATM has prevailed on excavation method and geotechnical philosophy in tunnel. Although the pattern of cracks has been reported by several engineers' effort, it was only focused on longitudinal cracks of lining. Eleven operational NATM tunnels have been conducted with the precise inspection for safety and diagnosis by KISTEC (Korea Infrastructure Safety and Technology Incorporation). With those results, the crack patterns by the spatial distribution and appearance for each tunnel have been analyzed and the cause of occurrence for seven common types of cracks in NATM tunnels was classified. Additionally, the longitudinal crack on lining above duct slab was figured out by numerical simulation and field inspection. Each crack has been analyzed by CCD (Charge-Coupled Device) scanner image with 3D configuration. Each type of cracks is also explained with output of experimental and condition of construction. Defined cracks on NATM tunnels will be good example for periodical inspection and precise inspection for safety and diagnosis.

Performance comparison of machine learning classification methods for decision of disc cutter replacement of shield TBM (쉴드 TBM 디스크 커터 교체 유무 판단을 위한 머신러닝 분류기법 성능 비교)

  • Kim, Yunhee;Hong, Jiyeon;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.5
    • /
    • pp.575-589
    • /
    • 2020
  • In recent years, Shield TBM construction has been continuously increasing in domestic tunnels. The main excavation tool in the shield TBM construction is a disc cutter which naturally wears during the excavation process and significantly degrades the excavation efficiency. Therefore, it is important to know the appropriate time of the disc cutter replacement. In this study, it is proposed a predictive model that can determine yes/no of disc cutter replacement using machine learning algorithm. To do this, the shield TBM machine data which is highly correlated to the disc cutter wears and the disc cutter replacement from the shield TBM field which is already constructed are used as the input data in the model. Also, the algorithms used in the study were the support vector machine, k-nearest neighbor algorithm, and decision tree algorithm are all classification methods used in machine learning. In order to construct an optimal predictive model and to evaluate the performance of the model, the classification performance evaluation index was compared and analyzed.

Application of Removable Ground Anchor Using Auto back Equipment (Auto back 인장장치를 이용한 제거식 앵커의 적용성)

  • Lee, Song;Lee, Sung-Won;Park, Sang-Kook;Kim, Sa-Dong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.223-230
    • /
    • 2004
  • It is growing the application of the removal ground anchor with tension force for earth retaining constructions in the downtown. Nowadays, we can find the compression dispersion anchor on many site. But, it is occur some probelems in behabior of anchors because of impossible to tense p.c strand uniformly with existing equipment due to different length of p.c strand. So we tried to tense each p.c strand uniformly with auto back equipment in-situ test. This study compared and analyzed apply to elastic theory in-situ test results of an existing equipment with those of auto back equipment. As a result of the test, It has been proved that differences of tension force in the existing equipment increases with increasing the number of p.c strand. This can cause an ultimate failure of the concentrated p.c strand and a shear failure of ground. So it has been proved that auto back equipment is necessary.

A Case Study on the Application of Safely Analysis for the Tunnel Adjacent to the Pier (교각에 근접한 터널의 안정성 평가에 대한 사례 연구)

  • 이선복;윤지선
    • Tunnel and Underground Space
    • /
    • v.13 no.2
    • /
    • pp.77-86
    • /
    • 2003
  • The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t)=a[1-exp(-bt)].

The Circular Center Cut with Large Empty Hole & Pre-Splitting in Tunnel Blasting (터널에서 대구경 무장약공과 선균열을 이용한 심빼기 공법에 관한 연구)

  • 김재홍;임한욱
    • Tunnel and Underground Space
    • /
    • v.11 no.3
    • /
    • pp.248-256
    • /
    • 2001
  • The cylindrical cut is most frequently used in tunnel blast regardless of their dimensions. In this study the new parallel cut is proposed to raise advance per round, which is considered to be an elevation of the traditional cylinder cuts. The general geometric pattern of a new cut with parallel blast holes is proposed. The detailed burden and spacing between the central blasthole and those of the four section are also given. The blast results between new cut and traditional cylinder cut are given. The main results of this study are as follows. 1) The average advances per rounds in new cuts can reach 99.5% of drilling length. That of traditional cylinder cuts are known approximately 90∼95% 2) Specific charge weight of new cut compare to that of cylinder cut is approximately reduced 5% from 1.363 to 1.297 kg/㎥ 3) Specific drilling rate is also reduced 8% from 2.393 to 2.130 m/㎥ 4) Vibrations, fly rock, and fragmentation produced by the new blast are to be proved superior to those of the traditional cylinder cuts.

  • PDF