• Title/Summary/Keyword: 주거소요

Search Result 55, Processing Time 0.03 seconds

Characteristics and Policy Implications of Private Development Parks in Japan (일본 민설공원 제도의 특성과 시사점)

  • Kim, Hyun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.1
    • /
    • pp.119-128
    • /
    • 2016
  • Urban park planning has become difficult due to the lack of municipal funds. Thereupon, a special scheme was imposed for city park planning. Since then, a legal amendment was made for economical improvement and more active participation. However, there are a lot of questions about whether it was a suitable direction for parks and where it should be emphasized for public interest. Base on these concerns, this study examined the basis and characteristics of location, creation, and maintenance of private development parks in Japan, which was the policy model of Korean private parks. Location and space planning of private development parks was made up considering an effective green network and disaster prevention function, and a minimum area was about 1.42ha. The minimum area, 1ha, was established on the basis of considering realistic possibilities, disaster protection, and universal validity. It was also amended to consider the standard of type two mid- to high-rise exclusive residential areas and consultation with regional governance. Finally, it was built on the lowest limit of ordinance of the relevant city; for example, 100% of the floor area ratio, 30% of the building coverage ratio, and the maximum height of 11 stories, etc. For maintenance, private and public sectors were working together. Maintenance fees for 35 years (based on $300yen/m^2$ per month) were paid en bloc by the licensee. However, the city was paid for facilities that accompanied excessive maintenance costs. Meanwhile, it seemed difficult to introduce attractive profit facilities because of the limitations in location, usage permission, and introduction equipment; furthermore, there were problems with management authority, and the burden of expenses was deducted. For creating private Korean parks, this study suggested that we should build priority of creating city parks and select appropriate locations first; also, we need to make criteria for location, creation, and standard management rules that are relevant to the whole nation of Korea.

Heating and Cooling Energy Demand Evaluating of Standard Houses According to Layer Component of Masonry, Concrete and Wood Frame Using PHPP (PHPP를 활용한 조적, 콘크리트, 목조 레이어 구성별 표준주택 냉·난방 에너지 요구량 평가)

  • Kang, Yujin;Lee, Junhee;Lee, Hwayoung;Kim, Sumin
    • Journal of the Korean Wood Science and Technology
    • /
    • v.45 no.1
    • /
    • pp.1-11
    • /
    • 2017
  • A lot of the energy are consumed on heating and cooling in buildings. The buildings need to minimize the heating and cooling loads for $CO_2$ emissions and energy consumption reduction. In recently, also demand of detached houses were increase while the residential culture was changed. The structure of the domestic detached houses can be divided into masonry, concrete, wood frame houses. Therefore, in this study, the heating and cooling load and energy demand were analyzed on the equal area detached house consisting of three structural methods (Masonry, Concrete, Wood frame). Layer of wall, roof, and floor were composited by structure. Thermal transmittance (U-value) of each layer was using the PHPP calculation for considering stud, such as the wood frame wall. In addition, the case of without considering for studs in wood frame wall (Non-studs) was analyzed in order to compare the difference between studs or not. Analysis was performed using self-developed heating and cooling load calculation program (CHLC) based excel and ECO2. The results of cooling and heating load and energy demand showed the highest values in the wood frame structure, and the concrete structure were confirmed to maintain a high value secondly. Two structure were determined to be disadvantageous on the energy consumption. Consequently, the masonry structure have an advantage over the other structure under the identical conditions. It was determined that if the except for thermal bridges due to the studs in the wood frame structure, it can be reduced the energy consumption.

The Feasibility Analysis of Urban Public Rental Housing in Korea (도심형 공공임대주택의 사업타당성 분석)

  • Kim, Ok-Yeon;Kim, Yong-Tai;Kim, Yong-Soon
    • Land and Housing Review
    • /
    • v.6 no.3
    • /
    • pp.117-127
    • /
    • 2015
  • Korean government has launched a new public rental housing policy for younger generation suffering from instable housing conditions in CBD area. This paper is to analyze the financial feasibility of urban public rental housing projects, based on its cash flows. Urban rental housing projects should find out the way to reduce costs and to secure cheap land, because of the high land price in CBD area and complex relationship of legal rights. Project types are categorized by the land acquisition method and district characteristics. For 10 sample projects, financial feasibility was analyzed. Cash flows were calculated on the design plan and 16 scenarios were made by combining 4 important variables. The variables are increase rate of land price, increase rate of monthly rents, ratio of public and market rents, and the interest rate of National Housing Fund. The findings are as follows. Government land rent-type can reduce initial costs because it is not necessary to buy land. However, total NPV is lowered at the time of liquidation due to the land return. Private land acquisition-type require more initial costs. But the NPV at liquidation time increases with land disposal. To improve financial feasibility, acquisition-type should be preferred in high land-price area and rent-type should be preferred in low land-price area. Among influencing variables, the rate of increase in land price and the ratio of public and market rents turned out to be the most important. Although the ratio of public and market rents can be controllable, high ratio will cause the burden of tenants. Therefore, interest rate adjustment of National Housing Fund is more desirable.

Analysis of Forest Fire Spread Rate and Fire Intensity by a Wind Model (모형실험에 의한 풍속변화에 따른 산불의 확산속도와 강도 분석)

  • 채희문;이찬용
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.5 no.4
    • /
    • pp.213-217
    • /
    • 2003
  • Forest fire spread and intensity were modeled as a function of wind and fuel. Spread rate and intensity of forest fire were related to weight and thickness of forest fuel beds and to wind speed. Forest fire spread rate and fire intensity were differentiated according to wind speed. Rapid wind speed causes a faster forest fire spread rate and greater fire intensity than does slow wind speed. Relative burning time of the fire from beginning to end in the model was 161 sec at a wind speed of 0.5 m/sec and 146 sec at 1m/sec on the model. Average forest lire spread rate was 0.014 m/sec at a wind speed of 0.5 m/sec and 0.020 m/sec at 1m/sec. Average fire intensity was 0.183 ㎾/m at a wind speed of 0.5 m/sec, 0.259 ㎾/m at 1m/sec. Fire intensity was greater when forest fire spread rate was rapid.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Study on the Reality of the Private Educational Institute Street and the Spatial Range of its Service in Pyeongchon, Anyang-si (안양시 평촌 학원가의 교육 서비스 실태 및 공간 범위에 관한 연구)

  • Han, Young-Eun;Lee, Sung-Cheol
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.15 no.4
    • /
    • pp.721-734
    • /
    • 2012
  • The main purpose of this paper is to identify the characteristics of the private educational institute street in Pyengchon, Anyang-si by analyzing the locational determinants of private education institute, the spatial range of it educational service and the spatial behaviour of private education institute students. The research has concerned with the locational determinants of private educational institutes in Pyengchon. Its main locational determinants are a reputation as a region of private educational institution street, access to large residential areas and rents. Also, it has considered the spatial service range of private educational institutes. To this end, it divided private educational institutes into three hierarchies from first sized to third sized private educational institute. The educational service of first sized institutes delivers to within a 10km radius of them, including Suwon. In particular, the service of them is concentrated on within a 6km radius of them. The educational service of second and third sized institutes both delivers to within a 6km radius of them. The service of second sized one is concentrated on within a 2km radius of them, and third sized one is within a 1km radius of them. What is more, it has analyzed the spatial behaviour of private educational institute students.

  • PDF

Cluster and Factor Analyses Using Water Quality Data in the Sapkyo Reservoir Watershed (삽교호유역의 수질자료를 이용한 군집분석 및 요인분석)

  • Im, Chang-Su;Sin, Jae-Gi
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.2
    • /
    • pp.149-159
    • /
    • 2002
  • The monthly water quality data measured at 19 stations located in the Sapkyo reservoir watershed were clustered into 2 to 7 clusters and factor analysis was conducted to characterize the water quality, using the information obtained from cluster analysis. The result of cluster analysis shows that Sapkyo reservoir and each stream (Sapkyo stream, Muhan stream and Kokkyo stream) in Sapkyo reservoir watershed hove their own water quality characteristics. The result of water quality analysis indicates that the concentration of suspended solids from Sapkyo reservoir is much higher than those of other streams, and which is probably because of increment of phytoplankton biomass with rich nutrient flowing Into Sapkyo reservoir from the upper stream of watershed. Furthermore, the concentrations of biochemical oxygen demand and chemical oxygen demand were 3.5 to 4.8 times and 1.7 to 2.5 times those of other streams, respectively. The overall water quality of Sapkyo reservoir watershed was considered to exceed eutrophic condition. Based on factor analysis, the water quality characteristics of Sapkyo stream and Muhan stream were closely related with farm land and residence. The water quality of Kokkyo stream was influenced by superabundant organic matter flowing from Chonan city and district wastewater treatment plant located in the upper stream of Kokkyo stream. The water quality factor influencing Sapkyo reservoir was closely related with water quality factors of other three streams.

BIM Based Time-series Cost Model for Building Projects: Focusing on Construction Material Prices (BIM 기반의 설계단계 원가예측 시계열모델 -자재가격을 중심으로-)

  • Hwang, Sung-Joo;Park, Moon-Seo;Lee, Hyun-Soo;Kim, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.111-120
    • /
    • 2011
  • High-rise buildings have recently increased over the residential, commercial and office facilities, thus an understanding of construction cost for high-rise building projects has been a fundamental issue due to enormous construction cost as well as unpredictable market conditions and fluctuations in the rate of inflation by long-term construction periods of high-rise projects. Especially, recent violent fluctuations of construction material prices add to problems in construction cost forecasting. This research, therefore, develops a time-series model with the Box-Jenkins methodologies and material prices time-series data in Korea in order to forecast future trends of unit prices of required materials. BIM (Building Information Modeling) approaches are also used to analyze injection time of construction resources and to conduct quantity takeoff so that total material price can be forecasted. Comparative analysis of Predictability of tentative ARIMA (Autoregressive Integrated Moving Average) models was conducted to determine optimal time-series model for forecasting future price trends. Proposed BIM based time series forecasting model can help to deal with sudden changes in economic conditions by estimating future material prices.

A Critical Review of Waterfront Maintenance Plan for Urban Development - Focused on Waterfront Development - (도시개발에 따른 친수공간 정비계획의 재고찰 - 워터프론트개발 사례를 중심으로 -)

  • Choi, Jin-Do;Park, Sung-Je;Ryu, Si-Saeng
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.965-969
    • /
    • 2012
  • 도시의 개발을 통한 발전방향은 지역별 기술력을 바탕으로 시대의 흐름과 문화, 경제, 도시정책 등에 따라 다양하다. 특히, 워터프론트는 도시와 가장 근접한 친수공간으로 단어자체에 도시'라는 개념이 포함되어 있다. 즉 도시가 큰 강이나 바다, 호수 등과 접하고 있는 공간을 말한다. 우리나라는 도시계획차원에서 도시 수변공간(urban waterfront)으로 설정하고, 레크레이션, 공원, 경관형성, 환경오염 저감, 정서함양, 생산 등의 다양한 기능을 갖고 있는 매우 공공성이 높은 도시지역의 주요 공간지역으로 의미를 부여하고 있다. 그러나 워터프론트를 개발계획을 수립하는 과정에서 교통계획, 홍수 등의 재해시설, 환경 등에 대한 평가가 제대로 이루어지지 않고 있으며(한국일보, 2011), 개발 계획 추진은 주민 공감대 형성, 사업타당성 검토 없는 '밀어부치기식' 개발 지상주의로 전락하고 있다. 따라서 본 연구는 국내 워터프론트 개발사업 계획을 추진하고 있는 지역으로 인천 송도지역과 부산의 수산시장으로 유명한 자갈치시장 일대의 개발계획, 마산 도시재생지구의 항만 재개발계획 사례를 분석하여 개발계획의 문제점과 언론상에 비춰지는 개발의 현 실태, 지역개발의 효과 등에 대한 시사점을 도출하였다. 사례지역을 비롯한 대부분의 기존 워터프론트 개발은 경제성을 위해 규모가 큰 상업시설 위주로 개발이 이루어지고 있으며, 주거시설이나 문화시설을 비롯한 다양한 시설의 구성이 부족한 특수성을 갖추어 가고 있다. 또한, 기존의 유휴공간을 재개발하면서 도시와의 관계를 제대로 설정하지 못하여 도시와 분리된 폐쇄공간으로 개발이 이루어지고 있으며, 도시구조에 통합되지 못하고 있는 실정이다. 무엇보다 워터프론트 개발사업에 관계된 여러 집단들, 즉 중앙정부, 지방자치단체, 개발주체, 시민 등 이들 사이에 합의 도출의 어려움이 많아 좋은 계획안이 무산되거나 사업이 지체 혹은 중단되는 사례가 많았다. 워터프론트 개발에 대한 지역민사회의 충분한 공감대가 결코 형성되지 않았음에도 오히려 요식적 여론수렴 절차를 강조하고 있으며, 친환경적 도시개발이라는 사업의 목적과 맞지 않는 계획이 많았다. 특히, 관련 사업 중 항만재개발사업에는 막대한 초기 투자비가 소요되어 재개발사업을 위한 자금의 확보가 어려운 경우가 많이 있었으며, 도시의 장기발전계획과 통합된 장기적인 개발전략이 필요한데 이를 소홀히 하는 경우가 있었다. 본 연구를 통해 기존 워터프론트 개발계획의 문제점과 향후 정비계획이 추구해야 하는 친수구역의 관리방법, 주민참여 방안의 대안제시가 이루어 질 수 있었으며, 이를 바탕으로 국내 친수공간 정비계획을 재 고찰 할 수 있는 기회가 되었으면 한다.

  • PDF

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.