• Title/Summary/Keyword: 작업지연요소

Search Result 75, Processing Time 0.027 seconds

Performance Evaluation of WAN Storage Migration Scheme for Cloud Computing Environment (클라우드 컴퓨팅 환경을 위한 WAN 스토리지 이주 기법 성능평가)

  • Chang, Jun-Hyub;Lee, Won-Joo;Jeon, Chang-Ho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.5
    • /
    • pp.1-7
    • /
    • 2012
  • In this paper, we design and implement the simulator for WAN storage replication model performance evaluation in cloud computing environment. Each cloud of simulator is composed of virtual machine emulator and storage emulator. The virtual machine emulator is composed of read/write ratio module, the read/write sequence combination module, and the read/write request module. The storage emulator is composed of storage management module, data transfer module, read/write operations module, and overhead processing module. Using the simulator, we evaluate performance of migration scheme, pre-copy and the post-copy, considering about read/write ratio, network delay, and network bandwidth. Through simulation, we have confirmed that the average migration time of pre-copy was decreased proportional to the read operation. However, average migration time of post-copy was on the increase. Also, the average migration time of post-copy was increased proportional to the network delay. However, average migration time of pre-copy was shown uniformly. Therefore, we show that pre-copy model more effective to reduce the average migration time than the post-copy model. The average migration time of pre-copy and post-copy were not affected by the change of network bandwidth. Therefore, these results show that selects the storage replication model to be, the network bandwidth know not being the important element.

Arithmetic Fluctuation Effect affected by Induced Emotional Valence (유발된 정서가에 따른 계산 요동의 효과)

  • Kim, Choong-Myung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.2
    • /
    • pp.185-191
    • /
    • 2018
  • This study examined the type and extent of interruption between induced emotion and succeeding arithmetic operation. The experiment was carried out to determine the influence of the induced emotions (anger, joy, and sorrow) and stimulus types (picture and sentence) on the cognitive process load that may block the interactions among the constituents of working memory. The study subjects were 32 undergraduates who were similar with respect to age and education parameters and were especially instructed to attend to induced emotion by imitation of facial expression and to make a correct decision during the remainder calculation task. In the results, the stimulus types did not exhibit any difference but there was a significant difference among the induced emotion types. The difference was observed in slower response time at positive emotion(joy condition) as compared with other emotions(anger and sorrow). More specifically, error and delayed correct response rate for emotion types were analysed to determine which phase the slower response was associated with. Delayed responses of the joy condition by sentence-inducing stimulus were identified with the error rate difference, and those by picture-inducing stimulus with the delayed correct response rate. These findings not only suggest that induced positive emotion increased response time compared to negative emotions, but also imply that picture-inducing stimulus easily affords arithmetic fluctuation whereas sentence-inducing stimulus results in arithmetic failure.

Sensitivity Analysis on the Performance of Multimedia Stream Server using Simulation (시뮬레이선을 통한 멀티미디어 스트림 서버의 성능 민감도 분석)

  • Park, Jin-Won;Park, Chong-Won
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.2
    • /
    • pp.23-29
    • /
    • 2006
  • This paper studies the Internet stream server which serves multimedia stream services such as VoD and MoD. The Internet multimedia stream server is developed to provide 50 users with continuous multimedia stream contents simultaneously. This paper focuses on introducing design concepts, operation details and on evaluating system performance and doing sensitivity analysis with respect to the change of the system components. The performance evaluation is performed using simulation in order to identify the system component that mostly affects the system performance. The sensitivity analysis shows the service delay rates of the multimedia stream server depending on the user's service request pattern. Also, the analysis is made on the utilization rates of the core system components such as the PCI bus and the Ethernet card, and on the system performance change by adding more system components.

  • PDF

A synchronous/asynchronous hybrid parallel method for some eigenvalue problems on distributed systems

  • 박필성
    • Proceedings of the Korean Society of Computational and Applied Mathematics Conference
    • /
    • 2003.09a
    • /
    • pp.11-11
    • /
    • 2003
  • 오늘날 단일 슈퍼컴퓨터로는 처리가 불가능한 거대한 문제들의 해법이 시도되고 있는데, 이들은 지리적으로 분산된 슈퍼컴퓨터, 데이터베이스, 과학장비 및 디스플레이 장치 등을 초고속 통신망으로 연결한 GRID 환경에서 효과적으로 실행시킬 수 있다. GRID는 1990년대 중반 과학 및 공학용 분산 컴퓨팅의 연구 과정에서 등장한 것으로, 점차 응용분야가 넓어지고 있다. 그러나 GRID 같은 분산 환경은 기존의 단일 병렬 시스템과는 많은 점에서 다르며 이전의 기술들을 그대로 적용하기에는 무리가 있다. 기존 병렬 시스템에서는 주로 동기 알고리즘(synchronous algorithm)이 사용되는데, 직렬 연산과 같은 결과를 얻기 위해 동기화(synchronization)가 필요하며, 부하 균형이 필수적이다. 그러나 부하 균형은 이질 클러스터(heterogeneous cluster)처럼 프로세서들의 성능이 서로 다르거나, 지리적으로 분산된 계산자원을 사용하는 GRID 환경에서는 이기종의 문제뿐 아니라 네트워크를 통한 메시지의 전송 지연 등으로 유휴시간이 길어질 수밖에 없다. 이처럼 동기화의 필요성에 의한 연산의 지연을 해결하는 하나의 방안으로 비동기 반복법(asynchronous iteration)이 나왔으며, 지금도 활발히 연구되고 있다. 이는 알고리즘의 동기점을 가능한 한 제거함으로써 빠른 프로세서의 유휴 시간을 줄이는 것이 목적이다. 즉 비동기 알고리즘에서는, 각 프로세서는 다른 프로세서로부터 갱신된 데이터가 올 때까지 기다리지 않고 계속 다음 작업을 수행해 나간다. 따라서 동시에 갱신된 데이터를 교환한 후 다음 단계로 진행하는 동기 알고리즘에 비해, 미처 갱신되지 않은 데이터를 사용하는 경우가 많으므로 전체적으로는 연산량 대비의 수렴 속도는 느릴 수 있다 그러나 각 프로세서는 거의 유휴 시간이 없이 연산을 수행하므로 wall clock time은 동기 알고리즘보다 적게 걸리며, 때로는 50%까지 빠른 결과도 보고되고 있다 그러나 현재까지의 연구는 모두 어떤 수렴조건을 만족하는 선형 시스템의 해법에 국한되어 있으며 비교적 구현하기 쉬운 공유 메모리 시스템에서의 연구만 보고되어 있다. 본 연구에서는 행렬의 주요 고유쌍을 구하는 데 있어 비동기 반복법의 적용 가능성을 타진하기 위해 우선 이론적으로 단순한 멱승법을 사용하여 실험하였고 그 결과 순수한 비동기 반복법은 수렴하기 어렵다는 결론을 얻었다 그리하여 동기 알고리즘에 비동기적 요소를 추가한 혼합 병렬 알고리즘을 제안하고, MPI(Message Passing Interface)를 사용하여 수원대학교의 Hydra cluster에서 구현하였다. 그 결과 특정 노드의 성능이 다른 것에 비해 현저하게 떨어질 때 전체적인 알고리즘의 수렴 속도가 떨어지는 것을 상당히 완화할 수 있음이 밝혀졌다.

  • PDF

Analysis of Programming Techniques for Creating Optimized CUDA Software (최적화된 CUDA 소프트웨어 제작을 위한 프로그래밍 기법 분석)

  • Kim, Sung-Soo;Kim, Dong-Heon;Woo, Sang-Kyu;Ihm, In-Sung
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.16 no.7
    • /
    • pp.775-787
    • /
    • 2010
  • Unlike general-purpose CPUs, the GPUs have been specialized as many-core streaming processors, and are frequently replacing the CPUs in an increasing range of computations thanks to their outstanding parallel computing capacity. In order to respond to such trend, NVIDIA has recently issued a new parallel computing architecture called CUDA(Compute Unified Device Architecture), offering a flexible GPU programming environment for GPGPU(General Purpose GPU) computing. In general, when programmers use the CUDA API, they should clearly understand many aspects of GPU's computing architecture to produce efficient parallel software. In this article, we explain several optimization techniques for CUDA programming that we have verified through a lot of experiment and trial and error, and review how those techniques affect the performance of code execution. In particular, we use a specific problem as an example to analyze several elements that affect performances, such as effective accesses to hierarchical memory system, processor occupancy, and latency hiding. In conclusion, we present several directions that may be utilized effectively in CUDA-based parallel programming.

A Study of the Tower Crane Hoisting Time Estimation Simulation Model with Climate Element for the High-Rise Building Construction (기후요소를 고려한 초고층 건설공사의 타워크레인 양중시간 예측 시뮬레이션 모델)

  • Yang, Kanghyeok;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyeok;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.96-107
    • /
    • 2013
  • Tower crane hoisting plan is one of the key element for the success of entire High-Rise Building construction. Hoisting time is the basic factor to appropriate hoisting plan which need to the hoisting load estimate and tower crane selection. With this reason, accurate hoisting time is needed to the proper hoisting plan. The current hoisting time estimation for High-Rise Building focus on the hoisting cycle time estimation with historical data. However, this method underestimated the external influences like environmental factor. Thus, this paper aims to develop the hoisting time estimation model with discrete event simulation which include the wind influences with certain height. According to the simulation result, the hoisting time which applied wind influence is increasing with height growth. Because of the high speed wind, the upper area of building has more operation delay time than the mechanical operation time. Seoul, the research area, has the most fastest wind speed on April and the least on October. Due to these differences of wind speed, the hoisting time is estimated with significant differences between April and October. This hosting time estimation model would be used for estimating the influence of wind. Moreover, this could apply to make the realistic hoisting plan.

Methods of Establishing the Optimal Performance Measurement Baseline and Evaluating the Progress for Implementing EVMS (EVMS 적용을 위한 최적 성과측정기준선 설정 및 진도율 산정 방법)

  • Won Dong-Soo;Kim WooYoung;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.395-400
    • /
    • 2001
  • In construction projects, it is very important to evaluate the performance of works in comparison with the cost and schedule plans. So, on the first of July, 2000, the Ministry of Construction and Transportation announced the EVMS will be applied in public sector soon. However there are still many arguments about how to establish the Performance Measurement Baseline(PMB) and how to evaluate the progress with accuracy. And many people confuse the meaning of EVMS with that of cost and schedule management. So, the purpose of this research is to propose the new useful methods to set up the PMB and to assess the exact progress in consideration of cost, schedule, and float time for successful implementation of EVMS.

  • PDF

Installation Scheduling for the Development of Southwest Coast 2.5GW Offshore Wind Farm (서남해안 2.5GW 해상풍력단지 조성을 위한 설치 일정계획)

  • Ko, Hyun-Jeung
    • Journal of Korea Port Economic Association
    • /
    • v.33 no.2
    • /
    • pp.83-96
    • /
    • 2017
  • As a way to address global warming, among the renewable energy sources, there have been heavy investments worldwide for the development of offshore wind farms. However, such development has a drawback: investment costs are higher than those for onshore wind farms due to required operations such as offshore transportation and installation. In particular, delays in installation due to adverse maritime weather conditions are factors that affect the economics of offshore wind farms' operation. Therefore, in this study, we analyze the optimal schedule of the construction of an offshore wind farm from a macro perspective by considering the weather conditions in Korea. For this purpose, we develop a mathematical model and apply it to a 2.5 GW offshore wind farm project on the southwestern coast of the country. We use data from the Korea Meteorological Agency for maritime weather conditions and attempt to reflect the actual input data based on precedent cases overseas. The results show that it takes 6 months to install 35 offshore wind turbines. More specifically, it is pointed out that it is possible to minimize costs by not working in winter.

A Case Study of Training Knowledge Workers for Building High Performance Work System -in Case of Yuhan-Kimberly's Work System- (고성과작업시스템 구축을 위한 지식근로자 양성 사례연구 -유한킴벌리 충주공장의 4조 2교대 근무시스템을 중심으로-)

  • Kim, Chul-Soo;Jun, Soon-Young
    • Proceedings of the KAIS Fall Conference
    • /
    • 2012.05a
    • /
    • pp.323-326
    • /
    • 2012
  • 현재 우리나라의 경제 환경을 볼 때, 외부적으로는 석유를 비롯한 원자재 가격이 급등, 미국과 일본이 경제둔화, 거대 경제국가인 중국이 경제성장을 조정하고 있다. 국내에서는 수출증가에도 불구하고 기업들의 설비투자 부진, 실업률 상승 및 내수시장 침체 등으로 경제적 회복이 지연되고 있는 매우 어려운 상태에 직면해 있다. 이와 같이 급격하게 변화하는 경영 환경에서 생존하기 위해서는 인적자원 재개발 및 학습능력의 배양이 어느 때보다 중요하게 부각되고 있다. 인적자원의 능력을 파악하여 인원 선발이나 적재적소에 배치한다면 그 보다 더 나은 조직은 없을 것이다. 역동적 경영 환경 내에서 성공을 추구하는 각 기업은 끊임없는 변화에 적극 대응하여 새로운 변화를 창출해 나가는 인적자원의 능력배양을 기업성공의 중요한 요소로 보고 있다. 따라서 역동적 변화 속에 있는 기업은 변화에 효과적 능동적으로 대처할 수 있는 유연한 조직을 개발하여 고객만족 극대화, 종업원 만족 극대화, 인적자원 활용 극대화를 통하여 기업경쟁력 향상을 이룩할 수 있어야 한다. 이에 본 연구에서는 국내 기업 중 4조 2교대 근무 시스템을 도입하여 지식 근로자를 양성함으로써 큰 성공을 거둔 유한킴벌리의 고성과 근무 시스템의 도입부터 적용, 적용에 따른 성과까지의 전 과정을 심층 연구하여 이 시스템이 기업의 경쟁력을 향상 시키는 중요한 도구로 사용 된 수 있도록 연구 하고자 한다.

  • PDF

Design and Implementation of Trading Analysis System based on Multi-Dimensional Modeling (다차원 모델링 기반의 거래분석 시스템 설계 및 구현)

  • Lee, Sung-Wun;Choi, Jin-Young
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.05a
    • /
    • pp.423-426
    • /
    • 2008
  • 한국증권선물거래소의 유가증권 매매체결시스템은 안정적이고 신속한 데이터 처리에 초점을 둔 시스템이다. 인터넷과 HTS(Home Trading System)의 대중화로 인해 대량의 데이터로부터 적시에 정보를 추출하고 분석하고자 하는 요구가 증가하고 있다. 그러나 현재의 통계정보시스템은 이와 같은 요구를 수용하기 어려우며 개발자의 별도 노력이 요구된다. 또한 목표성능에 대한 요구가 매우 높아짐에 따라 시스템 및 어플리케이션의 증설과 개선작업이 빈번하지만 그 효과를 예측하기 어려우며 정량화 된 근거자료의 부재로 의사결정을 지연시킨다. 따라서 이와 같은 요구사항들을 해결하기 위해 기존의 통계정보시스템을 활용하고 추가적인 데이터들을 다양한 차원에서 분석 가능하도록 웨어하우스 데이터베이스를 구축하며 성능예측을 위한 요소들을 추출하고 데이터마이닝을 수행하여 의사결정에 도움을 줄 수 있는 다차원 모델링 기반의 거래분석 시스템을 제안한다. 거래분석 시스템의 구축으로 사용자는 웹상에서 적시에 다차원 분석보고서를 생성할 수 있다. 또한 관리자는 외부적 환경변화에 따른 향후 시스템 성능 감소를 예측할 수 있으며 내부적 요인을 제어하여 이를 상쇄할 수 있는 방안을 찾을 수 있게 된다.