• Title/Summary/Keyword: 자재계획

Search Result 153, Processing Time 0.025 seconds

A Study on the Cyber-geospace Construction in the Evernet Age (에버넷 시대의 사이버국토 구축방안)

  • 김영표
    • Spatial Information Research
    • /
    • v.11 no.4
    • /
    • pp.371-389
    • /
    • 2003
  • This study aims at defining the concept of a cyber-geospace and proposing how to establish a cyber-geospace fir the entire country in detail. The study defined the cyber-geospace as 'the dynamic second territory of Korea not only to manage the land systematicality and deal with administrative services for the people in aspect of public sector, but also to contain economic activities of corporations and the citizen's everyday lives in aspect of private sector, in a 3D virtual reality made by digitizing various facilities and buildings as well as the entire toterritory including ground, underground and even sea'. In order to establish such a cyber-geospace, the project should be pursued on the national level fir around ten-year period.

  • PDF

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

Development of Scheduling and Operation system for multi-manufacturing line of the assembly parts (조립부품 다중 제작라인의 일정계획 및 운영 시스템 개발)

  • Lee, Sang-Hyeop;Min, Sang-Gyu;Lee, Byeong-Yeol;Ha, Jae-Tae;Lee, Won-Tae;Jo, Jeong-Ho
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.425-428
    • /
    • 2005
  • 본 연구는 건설장비 차량 조립부품을 제작하는 가공공장의 계획 및 운영 시스템 개발에 대한 내용이다. 연구의 대상은 건설장비 차량인 굴삭기, 휠로더, 지게차의 조립부품을 제작하는 공장으로 제작품별 제작라인이 구성되어 있다. 그리고 각 제작라인에는 여러 개의 공정이 있으며, 일부 공정은 작업자에 의해 작업이 이루어지고, 용접 및 가공 등은 자동화된 장비 및 설비에 의해 작업이 된다. 가공공장에서 관리 및 운영의 주요 관점은 이후 공정인 조립공장의 조립 착수일에 늦지 않게 제작된 부품을 공급하는 것이다. 그리고 공장 자체적으로 제작라인 내의 재공재고 감소, 작업일간 작업부하평준화, 자동화 장비 및 설비의 효율 극대화 등이 공장의 주요 관리 사항이다. 따라서 본 연구에서는 가공공장에서 제작되는 조립부품의 납기일 준수, 재고 감소, 부하 평준화, 장비효율의 극대화를 위해 공장을 체계적으로 관리하기 위한 계획 및 운영 시스템을 개발하였다. 개발시스템에는 제작라인별 제작 착수 및 자재발주${\cdot}$입고 관리, 공정별 실적관리, 실시간 작업 진행 관리, 용접 불량 관리 기능 등이 있다. 시스템은 MSSQL 서버, 오라클과 Visual Basic, Visual C# ASP로 개발되었다.

  • PDF

A Study of Evaluation Process and Chart of PPC considering Variation (변이를 고려한 PPC 평가절차 및 평가차트 제안)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.75-83
    • /
    • 2009
  • PPC stands for the percentage of weekly assignments completed. It makes it possible to improve the performance of production planning and control systems. Recently, the cases of PPC application have been increasing because PPC is easy to apply to construction site. However, to evaluate the average of PPC or analyze PPC as time passes has some problem ; if PPC is the same, the average it is evaluated equally although there are variabilities in production system. Therefore, In order to evaluate the character of PPC in process of production this paper suggests the method of the evaluating PPC by using coefficient of variability besides PPC measurement.

A Control Account Planning Using Material Requirement Planning in Earned Value Project (MRP기법을 이용한 EV프로젝트의 관리계정계획)

  • Kim Soo-Yong;Lee Yang-Ho;An Dong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.114-122
    • /
    • 2002
  • Earned Value Management System(EVMS) is a management technique that is emerging as a valuable tool in the management of all projects, including and in particular construction projects. It is based on C/SCSC that has been released by the U.S. Department of Defense (DOD) in 1967. In a project that employs the earned value management concept, the project's measurable performance plans will be formed with the creation of CAPs. The formation of CAPs is a planning step necessary to form an earned value baseline. In this paper, a method is proposed to form CAPs using Material Requirement Planning(MRP) that is also known as a useful planning tool in the manufacturing industry. An application to a real project has been carried through workpackaging model.

A Study on the Requisite Elements of LCCO2 Evaluation System at Planning Stage of Building (건축물 계획단계 LCCO2 평가시스템의 필요요소에 관한 연구)

  • Baek, Cheong-Hoon;Tae, Sung-Ho;Roh, Seung-Jun;Lee, Joo-Ho;Shin, Sung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.31-41
    • /
    • 2011
  • The $LCCO_2$ evaluation programs previously developed in Korea involve limitations in establishing strategies of reducing environmental loads to optimal level in a way to put in materials directly after designing. Therefore, this study has the purpose to extract and propose elements required for the establishment of highly accurate system by counteracting swiftly in a method with high energy efficiency over cost at planning stage. To that end, existing $LCCO_2$ evaluation programs in Korea and abroad were compared and analyzed, and in the planning stage, GEM-21P and Carbon-navigator intended for the establishment of building energy performance improving strategy were selected as the evaluation program for survey. On such basis, after comparison and analysis between $LCCO_2$ calculating methods and system structures of the two programs, elements required for system establishment that can evaluate life-cycle environmental loads of building in planning stage were proposed.

A Study on the Work Package and Resource Planning of En by using the Material Requirement Planning(MRP) (MRP기법을 이용한 EVMS의 복합작업$\cdot$자원계획에 관한 연구)

  • Kim Soo-Yong;Lee Yang-Ho;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.410-415
    • /
    • 2001
  • Earned Value Management System(EVMS) has been considered as a useful tool of managing construction projects lately and its instruction into a private industry is now under consideration by the Korean government. It is on the basis of C/SCSC that had been released by the U.S. Department of Defense(DOD) since 1967. Its research has been in the active progress in order to utilize the earned value concept as a project management tool for construction project ordered by both government and private sector. Material Requirement Planning(MRP) is also known as a tool of planning and scheduling resources for assembly product as a part of inventory control models in the manufacturing industry. The purpose of this study is the effective employment of Earned Value Management to manage the construction projects by utilizing Material Requirement Planning(MRP), based on project management software and Workpackaging model.

  • PDF

신관리기법으로서의 산업공학(I.E)

  • 신현구
    • Cement
    • /
    • s.40
    • /
    • pp.4-11
    • /
    • 1971
  • 최근 우리 나라에서도 경영합리화와 생산성향상의 문제가 활발하게 논의되고 있고, 또한 이와 동시에 기업을 경영하는데 있어서 계획 및 관리의 필요성이 강조되고 있다. 이와 같이 기업환경의 급속한 구조 변화에 대비하여 본론에서는 생산성향상을 위한 가장 중요한 경영관리 기법중의 하나인 I.E(Industrial Engineering)에 대하여 소개하고저 한다. 본래 I.E는 그 수법이나 대상에 있어서 자연과학이나 사회과학분야에서 활용되고 있었으나 미국의 F.W.Tayler 박사가 이를 최초로 경영학적 측면에 도입, 적용하였다. 1890년대에 미국은 공업생산국으로서 산업근대화에로의 발전과정에서 경영자측은 기술이나 방법에의 개선에 의한 산출량 증가로서 노동자의 임금절하를 기도하고 있는 노동자측은 태업으로 임금문제를 해결하려고 하였다. 따라서 F.W.Taylor 는 산업발전에 최대의 장벽인 임금문제의 기술적인 해결에 주력하여 노사간의 분쟁을 $\ulcorner$성과급임금제도$\lrcorner$로서 조정하기 위해 $\ulcorner$과학적 관리법$\lrcorner$(The Scientific Management)을 체계화시키기 위한 일련의 작업에 착수하였다. 이외에도 테일러는 임금문제에 관련된 생산성 향상 문제까지도 연구발전시켜 생산계획$\cdot$공장관리$\cdot$작업조직$\cdot$자재관리$\cdot$공정관리 등의 전반적인 공장관리 문제를 해결하기 위하여 $\ulcorner$공장관리$\lrcorner$(Shop management)를 발표하여 I.E의 체계를 확립시키는 계기를 마련하였다. 이와 같이 I.E는 미국을 중심으로 발생한 것이지만 그간 우리나라에서도 도입 적용되어 발전되고 있음을 감안할 때 한국양회공업협회가 본기법에 대하여 관심을 갖고 일련의 조사활동을 시작한 것은 매우 의의있는 일이라 할 수 있다.

  • PDF

사례분석을 통한 이동식 크레인의 안전성에 관한 연구

  • Kim, Byeong-Seok;Yang, Yong-Gu
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.11a
    • /
    • pp.21-30
    • /
    • 2012
  • 이동식 크레인과 관련한 안전사고가 다발하고 있음에도 국내 대부분의 건설현장에서는 아직도 관리감독자와 크레인 운전자의 경험에 의존하여 장비를 선정하고 운용하고 있는 실정이다. 본 연구를 통해 건설현장에서 발생한 이동식 크레인 전도사고사례와 위험성 평가를 실시한 결과 이동식 크레인을 이용한 안전한 자재 양중작업을 위하여 중량물의 무게 형상, 인양장비 제원, 정격하중, 작업반경 등을 고려한 중량물 취급작업계획을 작성 준수하고 이동식 크레인의 제작 설계기준 준수를 위하여 이동식 크레인 제조사에서 제공하는 사용(취급)설명서를 준수하며 위험성 평가 결과가 실제 이동식 크레인을 사용한 양중작업에 적용 가능하도록 지속적인 관리 등이 요구됨을 알 수 있었다.

  • PDF

건강과 자연농업-제231호

  • Jeong, Jin-Yeong
    • THE HEALTH and ORGANIC FARMING
    • /
    • no.231
    • /
    • pp.1-12
    • /
    • 2006
  • 제28회 한국유기농업대회 준비돌입/환경호르몬으로부터 자유로워질수 있는 길/우리의 산야초/연속 강우에 따른 과일나무 잎의 갈변에 대하여/벼 멀칭재배의 이론과 기술/김제지평선축제, 성공적으로 개최돼/신태인 유기농 포도축제 성료/질병 예방을 위한 식사/일본,고령화와 웰빙 붐으로 건강식품시장 '폭발'/스위스,유기농가 급속 확산/LA,'건강빵'경쟁 후끈~후끈/일본,학교급식용 중국산 냉동가지 풋콩에서 잔류농약 검출/두가지 비료로 유기농작물의 고품질 다수확 생산을 체계적으로 보다 쉽게 하는 방법/전남도, 전국 최초 '친환경축산 5개년 종합계획'수립/배추 노균병 어떤 병인가?/고추.방울토마토 증수/중국 박람회 및 유기농장 연수기/"유기가공식품" 인증 법제화 추진/국내외 친환경 농축산물의 생산 및 인증 실태/친환경 유기낙농의 정착 방안/9월중 새식구 명단/농촌진흥청,토양전자지도,휴대폰 영농정보 제공/친환경인증기관협의회 출범/친환경농자재'목록공시제'시행/충주시,친환경바이오농업 확대 추진/제주,친환경농업 발전전략 심포지엄 개최/유기 및 일반 농산물의 품질 비교에 관한 연구/유기질 비료의 이해

  • PDF