Browse > Article

A Study of Evaluation Process and Chart of PPC considering Variation  

Moon, Hyo-Gi (광운대 대학원)
Yu, Jung-Ho (광운대 건축공학과)
Kim, Chang-Duk (광운대 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.10, no.2, 2009 , pp. 75-83 More about this Journal
Abstract
PPC stands for the percentage of weekly assignments completed. It makes it possible to improve the performance of production planning and control systems. Recently, the cases of PPC application have been increasing because PPC is easy to apply to construction site. However, to evaluate the average of PPC or analyze PPC as time passes has some problem ; if PPC is the same, the average it is evaluated equally although there are variabilities in production system. Therefore, In order to evaluate the character of PPC in process of production this paper suggests the method of the evaluating PPC by using coefficient of variability besides PPC measurement.
Keywords
PPC; Evaluation; Variability;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 구본상, '린 건설에 기초한 국내 건설공사의 시공 계획 신뢰도평가', 한국건설산업연구원, 2007.5
2 구본상, '린 생산방식과 해외 대규모 건설사업 적용 사례', 건설산업동향, 한국건설산업연구원, 2006.5
3 김영채, 김준우, '사회과학의 현대 통계학', 박영사, 2005.9
4 Satish B., 'Effectiveness of lean principles in construction', Proceedings IGLC-13, 2005, pp. 421-429
5 오상준, 건축공사에서의 변이관리에 관한 연구, 경원대학원 석사논문, 2001
6 Ballard, G., 'The Last Planner System of Production Control', Ph.D Dissertation, University of Birmingham, UK. 2000
7 김찬헌, '린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구', 한국건설관리학회 논문집, 제2권 제4호 2001. 12   과학기술학회마을   ScienceOn
8 김용우, '라스트 플래너 적용 사례연구: 터널프로젝트', 한국건설관리학회 논문집, 제7권 제4호, 2006, pp. 146-153   과학기술학회마을   ScienceOn
9 Tommelein, I.D., Riley, D., and Howell, G.A., Parade Game: Impact of Work Flow Variability on Trade Performace. ASCE, J. off Constr. Engrg, and Mgmt., Sept./Oct. 1999, Issue   DOI
10 Mario Fiallo C., 'Applying the last planner control system to a construction project: a case study in quito, Ecuador, Proceedings IGLC-10, 2002
11 김창덕, '린건설 배경과 개념.' 한국건설관리학회지, v.5, n.4, 2004.8   과학기술학회마을   ScienceOn
12 김호정, '사회과학통계분석', 삼영사, 1996
13 박상준, 전재열, '작업흐름의 변이분석을 이용한 공정운영 프로세스', 대한건축학회논문집 22권 6호, 2006.6   ScienceOn
14 Koskela, L., 'An exploration Towards a Production Theory and its Application to construction, VTT Publications, 408, VTT Building Technology, Espoo, 2000
15 김창덕, '린 건설(Lean Construction).' 한국건설관리학회지, v1, n.3, 2000.9   과학기술학회마을   ScienceOn
16 정순오, 김예상, 진상윤, 윤수원, '건설 프로젝트Life Cycle의 효율성을 고려한 성과 평가기준 및 측정 방법론 제안', 대한건축학회논문집 구조계 21(7), 2005
17 Vicente Gonzlez, 'Investigating the relationship between planning reliability and project performance : a case study', Proceedings IGLC-15, 2007, pp. 98-108