A Case Study on Owner's Loss Incurred due to the Financial Cost of Public Construction Works in Korea (국내 공공공사에서 발주자 손실의 금융비용 사례연구)

  • Jeong, Min;Lee, Ghang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.136-145
    • /
    • 2008
  • Occasionally an owner of public construction work pays financial costs in addition to progress payments. However, the overall scale of financial costs are not known. This research examines, based on a case study, the financial cost incurred in public construction works and the following issues: the overall scale of financial costs, the impact on financial costs on the owner, and the impact of timing on the overall sum of the financial costs. Annually, more than 2.3 trillion KRW are paid as progress payments for public construction work; yet, there is no research data showing the scale of financial costs thus incurred. The purpose of this research is to illustrate the scale of financial costs incurred due to progress payments for public construction works, and to suggest alternatives that would improve relevant regulations.

Predicting Cooperative Relationships between Engineering Companies in World Bank's ODA Projects (세계은행 공적개발원조사업의 엔지니어링 기업 간 협력관계 예측모델 개발)

  • Yu, Youngsu;Koo, Bonsang;Lee, Kwanhoon;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.107-116
    • /
    • 2019
  • Korean construction engineering firms want to pave the way for expansion of overseas markets through the World Bank's Official Development Assistance (ODA) projects as a way to improve their overseas project performance. However, since the World Bank project competes with global companies for limited projects, building partnerships with suitable business partners is essential to gain an upper hand in bidding competition and meet the institutional conditions of the recipient country. In this regard, many network studies have been conducted in the past through Social Network Analysis (SNA), but few have been analyzed based on the process of changes in the network. So, This study collected winning data from the three Southeast Asian countries that ended after the World Bank's ODA project performed smoothly, and established a learning-based link prediction model that reflected the dynamic nature of the network. As a result, the 11 main variables acting on building a cooperative relationship between winning companies were derived and the effect of each variables on the probability value of cooperation between individual links was identified.

A Study on the Power Supply and Demand Policy to Minimize Social Cost in Competitive Market (경쟁시장 하에서 사회적 비용을 고려한 전력수급정책 방향에 관한 연구)

  • Kwon, Byung-Hun;Song, Byung Gun;Kang, Seung-Jin
    • Environmental and Resource Economics Review
    • /
    • v.14 no.4
    • /
    • pp.817-838
    • /
    • 2005
  • In this paper, the resource adequacy as well as the optimum fuel mix is obtained by the following procedures. First, the regulation body, the government agency, determine the reliability index as well as the optimum portfolio of the fuel mix during the planning horizon. Here, the resources with the characteristics of public goods such as demand-side management, renewable resources are assigned in advance. Also, the optimum portfolio is determined by reflecting the economics, environmental characteristics, public acceptance, regional supply and demand, etc. Second, the government announces the required amount of each fuel-type new resources during the planning horizon and the market participants bid to the government based on their own estimated fixed cost. Here, the government announces the winners of the each auction by plant type and the guaranteed fixed cost is determined by the marginal auction price by plant type. Third, the energy market is run and the surplus of each plant except their cost (guaranteed fixed cost and operating cost) is withdrew by the regulatory body. Here, to induce the generators to reduce their operating cost some incentives for each generator is given based on their performance. The performance is determined by the mechanism of the performance-based regulation (PBR). Here the free-riding performance should be subtracted to guarantee the transparent competition. Although the suggested mechanism looks like very regulated one, it provides two mechanism of the competition. That is, one is in the resource construction auction and the other is in the energy spot market. Also the advantages of the proposed method are it guarantee the proper resource adequacy as well as the desired fuel mix. However, this mechanism should be sustained during the transient period of the deregulation only. Therefore, generation resource planning procedure and market mechanisms are suggested to minimize possible stranded costs.

  • PDF

Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System (건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.170-181
    • /
    • 2008
  • Cost of construction project have to be estimated based on drawing before execution. Cost estimate and check would be performed numerously for preparing general outline of requirements and determining the budget at conceptual planning stage, for obtaining decision on every matter related to design, specification, construction and cost at design stage, and for predicting bidding cost. Thus, importance of cost estimation cannot emphasize too much in construction. However, there are lack of standard estimation method, process, and cost analysis method, that square foot estimation method is as used as eyer, in Korea. Thus, This research present the direction for improving cost estimation and management in construction; It is demanded that establishing standard data base methodology, multi-level database model CUBE, and standard cost planning process, choosing cost estimation methodology according to objectives and cost planning process, and making more experts.

Case Study of Cooperative Learning Simulating Turn-Key System in Design Class for Environmental Engineering (턴키 제도를 모사한 환경공학 설계과목의 협동학습 적용사례)

  • Kim, Geon-Ha;Oh, Ju-Won;Lee, Hack-Soo
    • Journal of Engineering Education Research
    • /
    • v.9 no.4
    • /
    • pp.5-9
    • /
    • 2006
  • In this research, a case study for cooperative learning practiced in a design class for environmental engineering was presented. Designing a treatment facility for urban diffuse pollution was a main problem given to the participants. Turn-key system for civil works were simulated throughout class works. Twenty five students were grouped into four virtual companies and assigned own position from chairperson to workers. Each group competed throughout establishing design concept regarding order, expense calculation, process distribution, actual calculation. Best design with lowest bidding won the first place. For evaluating class effectiveness, one student from each group were monitored thorough semester. Participants were improved for their understanding about company establishment, turn-key system management, awareness about personal management, and presentation skills. Tension of the class was effectively elevated as well.

A Case Study on Risk Analysis of Large Construction Projects (대형건설공사의 리스크 분석에 관한 사례적용연구)

  • Kang In-Seok;Kim Chang-Hak;Son Chang-Baek;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.98-108
    • /
    • 2001
  • This research proposes a new risk analysis model in order to guarantee successful performance of construction projects. The risk analysis model, called Construction Risk Analysis System(CRAS), is introduced to help contractors Identify project risks through RBS and through the procedures in risk analysis model. The proposed CRAS model consists of three phases. First step, CRAS model can help contractors decide whether or not they bid for a project by analysing risks involved in the project. Second step, the influence diagraming, decision tree and Monte Carlo simulation are used as tools to analyze and evaluate project risks quantitatively. Third step, Monte Carlo simulation is used to assess risk for groups of activities with probabilistic branching and calendars. Consequently, it will help contractors identify risk elements in their projects and quantify the impact of risk on project time and cost.

  • PDF

A Study on the Unfair Aspect of Specific Provisions in the Construction Contract : Counterplan and Institutional Reformation (건설공사 계약서상 불공정특약에 대한 대처방안 및 제도개선에 관한 연구)

  • Choi Jea-Won;Park Keun-Hyung;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.146-153
    • /
    • 2004
  • The purposes of this study are to survey unfair aspects of specific provisions in the construction contract, and to suggest counterplans and institutional reformations. The research method of this study includes judicial precedent analysis and a questionnaire survey, The results of this study are as follows: 1) the main problems of unfair specific provisions are payment condition, shifting of the responsibility and adjustment in the contract sum. 2) counterplans ate suggested according to the construction phase : bid, construction and completion phase. 3) institutional reformations include firming up regulations, supervision, invigoration of claim, development of variation guideline, and so on.

Risk-based Decision Model to Estimate the Contingency for Large Construction Projects (리스크 분석에 기초한 대형건설공사의 예비비 산정에 관한 연구)

  • Kim Du-Yon;Han Goo-Soo;Han Seung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.485-490
    • /
    • 2003
  • Nowadays the rapid change in construction environment getting more globalized and complicated has caused lots of unexpected risks from inside and out of the country, so more sophisticated construction management strategies are being strongly needed. This paper suggests a risk management model with which we can estimate the appropriate contingency by quantifying the amount of probable risks immanent in large construction projects, which have a high degree of uncertainty in the anticipation of the total construction cost. To develop the model, the risk factors that make cost variations are elicited based on the real data of the contingencies assigned to the past projects. Furthermore, the influential relationship of risk factors is structured by applying the CRM(Cost Risk Model) which is the synthetic model of Monte Carlo Simulation, Influence Diagram and Decision Tree. The ultimate outcome of this research can by validated by tile case study with a large construction project performed.

  • PDF

Improving Constructability Analysis Tasks by Applying BIM Technology (시공성 분석업무 개선을 위한 BIM 기술의 적용방안)

  • Park, Chan-Sik;Park, Hee-Teak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.137-146
    • /
    • 2010
  • Becoming construction projects larger and more complicated, and utilizing more varied and complex contracting and delivery systems in the industry, integrating information and managing constructability from project inception to completion became the most critical tasks for the successful project management. However, current industry practices of constructability analysis which are too much dependent on field engineers and managers' experiences, are not performed efficiently and also not managed effectively. Then the scope, method, and procedure in performing analysis tasks are not certain as well as not systematic, In addition, due to using 2D based drawings and documents, information required at project phases for the analysis is inconsistent and inaccurate. This study aims to suggest the use of BIM technology and functions for solving various problems of current constructability practices. In particular, constructability analysis tasks performed at design and construction stages are identified and their adaptability, applicability, and benefits of BIM are investigated through interviews on constructability and BIM professionals in the industry.

Performance Measurement of ISO Quality Management System in the Construction Industry (건설산업 ISO 품질경영시스템의 성과측정에 관한 연구)

  • Lee Woo-Chang;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.414-418
    • /
    • 2004
  • Quality system of construction industry in Korea was a means to prevent unqualified construction work. But lately, it has became an essential requirement. So, lots of construction companies acquire ISO quality management system which provides fundamental management criteria. Now, most of the Korean construction companies have got IS0 quality management system. So, getting ISO quality management system doesn't mean advantage in public competition of construction bidding and that causes increase in the maintenance cost. That's why some construction companies abandon the 150 certificate. Therefore, the authors need to check the effect of ISO quality management system. For this, the authors provide the performance measurement index of ISO quality management system.

  • PDF