• Title/Summary/Keyword: 우선순위평가

Search Result 1,203, Processing Time 0.029 seconds

Retrofit Measures Based on Seismic Retrofit Priority of Existing Bridges (교량의 내진보강 우선순위를 이용한 합리적인 보강방안 선정기법)

  • Lee, Sang-Woo;Kim, Sang-Hyo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.8 no.3
    • /
    • pp.77-86
    • /
    • 2004
  • The retrofit priority of existing and retrofitted bridges is examined and compared to determine effectively the seismic retrofit method of bridges. For the retrofit prioritization of bridges a quantitative procedure is proposed firstly based on seismic damage probabilities and total failure cost due to the damage of seismic vulnerable components. Using the proposed procedure, the retrofit priority of four typical girder-type bridges is determined. In addition, the ranking indices of bridges retrofitted by steel jackets and cable restrainers are revaluated for comparing with the results of existing bridges. Application of retrofitting method can considerably decreases damage possibilities of retrofitted components but may increases those of adjacent vulnerable components. Therefore, the seismic retrofitting effects based on the global motions of existing and retrofitted bridges should be examined to determine efficiently the retrofitting method. For evaluating the retrofitting effects the ranking indices obtained from the proposed procedure is found to be utilized effectively.

Evaluation of Risk Factors and Decision Making for Rehabilitation of Water Supply Network using AHP (AHP를 이용한 상수도관의 위험요인 및 개량 우선순위 결정 기법)

  • Kim, Yong-Sam;Park, Jin-Il;Lee, Dae-Jong;Jeon, Myeong-Geun
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2007.04a
    • /
    • pp.171-174
    • /
    • 2007
  • 본 논문에서는 다기준 의사결정방법 중에 하나인 AHP(Analytic Hierarchy Process)를 이용하여 상수도관의 개량 우선순위 결정 및 노후화에 영향을 가장 많이 주는 위험요인을 평가할 수 있는 기법을 제안한다. 제안된 방법은 3단계의 계층구조로 구성되어 있으며, 1단계에서는 AHP를 이용하여 우선순위를 예측하고자 하는 관망에 대해서 평가 인자들에 대한 출력값을 산출한다. 2단계에서는 1단계에서 계산된 값들을 이용하여 물리적 척도와 환경적 척도 값을 산출하고, 최종 3단계에서 산출값들을 이용하여 우선순위를 결정하도록 구성되어 있다. 제안된 방법은 FCP에 의한 기존 연구와 비교함으로써 타당성을 검증하였다.

  • PDF

(A) Study on the Priority Selection for business development of the Defense Education and Training System Based on Virtual Reality (가상현실 기반 국방 교육훈련체계 사업화 우선순위 선정에 관한 연구)

  • Lee, Se-Ho;Han, Seung-Jo
    • Journal of Digital Convergence
    • /
    • v.20 no.3
    • /
    • pp.201-209
    • /
    • 2022
  • In order for the military to review the introduction of virtual reality technology into various education and training systems and fully utilize it, it is important to reflect the characteristics of the technology and education system and to accurately identify and selectively apply the characteristics of commercialization. In this study, the evaluation criteria were selected through the Analitic Hierarchy Process (AHP) method for factors to be considered when commercializing a virtual reality-based education and training system, and the priorities of the projects were determined. Based on previous studies, an initial AHP model was constructed and the relative importance of six factors, including reality, was analyzed as the level 1 evaluation criteria. Next, for Level 2, each evaluation criterion was evaluated to confirm the importance of each of the 11 tasks in the six evaluation criteria, and priorities were selected for each task. As a result of the analysis, level 1 showed that reality and ripple had higher importance than other factors. As a result of evaluating the final relative importance, the priority was shown in the order of ① flight training, ② disaster training, ③ shooting Training, and ④ driving a vehicle. Based on the relative priorities determined in Levels 1 and 2 of the model presented in this study, the importance of each project necessary for final decision-making of the research priorities for the defense virtual reality project was presented. It is expected that this study can be used as a reference material for prioritizing the commercialization of education and training systems in the defense sector.

Analysis of Relative Importance and Priority of Civil Servant's Education Training Policy: Using Analytic Hierarchy Process (AHP) Method (공무원교육훈련정책의 상대적 중요도와 우선순위 분석: 계층의사결정방법(AHP)을 활용하여)

  • Park, Jong-Deuk
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.4
    • /
    • pp.263-272
    • /
    • 2012
  • In an attempt to analyze the policy priority on civil servant's education training policy as human resource management in this study, a positive analysis with the experts using AHP method was conducted. Summarizing the outcome of the study; First, in terms of relative priority of the evaluation elements by sector, the education training operation system, among education training program, education training evaluation, and education infrastructure, was analyzed as the most important element. Second, as a result of analyzing the priority of detail sectors of civil servant's education training, Action learning education program was proved to be the top priority project education training program aspect and education training operation system was also evaluated as the top priority project in education training agency budget expansion aspect, education training and personnel administration link was evaluated as the top priority project education training evaluation, and trainer secure was proved to be the top priority education infrastructure. Such outcome of the project is expected to make commitment for evaluating the civil servant's education training policy.

Prioritization of Flood Restoration Projects by Administrative Districts (행정구역별 치수사업의 우선순위 결정)

  • Kang, Seongkyu;Choi, Si Jung;Lee, Dong Ryul
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.470-470
    • /
    • 2018
  • 본 연구는 2014년 부산지역에서 발생한 집중호우에 따른 피해상황을 읍 면 동 단위의 행정구역에 대해 조사하고, 각 행정구역별 수해복구사업의 우선순위를 결정 할 수 있는 방법을 모색하는 것을 목표로 한다. 피해현황은 인명피해(사망, 이재민 수), 건물 및 선박, 농경지 침수에 의한 피해, 공공시설물에 대한 피해를 조사하였다. 또한 피해 요인별 피해액을 집계하여 수해복구사업의 평가기준으로 이용하였다. 사업의 경제성은 B/C분석 결과를 통해 반영하였다. 각 행정구역에 대한 우선순위는 다기준분석 중 PROMETHEE, ELECTRE 방법으로 분석하였고 표준화 방식은 T-Score방식을, 가중치는 엔트로피 방식으로 결정하여 분석에 반영하였다. 본 연구에서는 실제 발생한 호우에 대한 피해복구사업에 적용하여 검증을 시도하였으나, 향후 치수사업의 다양한 대안을 선정하고 우선순위를 결정하여 실제 도시개발 및 정비 사업 등으로 분야를 확장할 수 있을 것으로 기대한다.

  • PDF

A Decision Methodology for the Priority of Military Facility Remodeling (군 시설 리모델링의 우선순위 결정 방법)

  • Yang In-Cheul;Jeon Yong-Seok;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2003
  • The procedure of present military facility remodeling has many problems at the stage of evaluating the priorities in various remodeling projects which have been caused from lots of corps. These problems have usually happened not only because of the shortage of the cooperation system in the related divisions but also because of the nonexistence of the effective process and method for evaluating the priorities. I've reviewed the study of remodeling and military facility business and applied the AHP(Analytic Hierarchy Process) method which is effective to evaluate the priorities in various groups' decision.

  • PDF

Priority Evaluation for Support of Cultural Technologies Using Fuzzy TOPSIS (퍼지 TOPSIS를 이용한 문화기술 육성 우선순위 평가)

  • Park, Hyun Min
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.105-113
    • /
    • 2020
  • The development and application of cultural technologies(CT) are expected to lead to create various service scenarios and business models. Considering the wide range of application and extensibility of CT, it is necessary to design multidimensional evaluation methods for priority of the support of R&D budgets. The method should include the various evaluation criteria such as economic feasibility and user benefit of service made by a cultural technology. Our research addresses priority decision for fosterage of cultural technologies using fuzzy TOPSIS. Seven evaluation attributes are used to compare five specific technologies. Based on the results, service usefulness is the most important factor among the evaluation attributes. Also, technologies of computer graphics and UI/UX have higher priority than the others. We expect our research to help to provide guidelines for selection of promising cultural technologies which foster the culture and contents industry.

A Study on the Proposal of the Customized Package through the Priority Analysis of Agricultural Environment Conservation Practices (농업환경보전 실천기술 우선순위 분석을 통한 맞춤형 실천기술 패키지 제안 연구)

  • Son, Min-Hui;Lee, Seul-Bi;Lee, Kyun-Sik;Kim, Tae-Young
    • Journal of agriculture & life science
    • /
    • v.53 no.5
    • /
    • pp.153-165
    • /
    • 2019
  • This paper analyzes the priorities of introducing agricultural environmental conservation practices for the successful introduction of agricultural environmental conservation programs and promotes customized agricultural environment conservation practices packages suitable for the local environment. Agricultural environmental conservation practice consists of three fields: soil, water, and air, nine sub-fields, and 30 practice skills. Using the advantages of AHP and BWS appropriately for priority analysis, three areas and nine sub-fields are measured using AHP techniques, and the practical activities of each fields are measured by priorities using BWS techniques to enhance the differentiation and completeness of research. In addition, the criteria for evaluating priorities of practical activities used 'Environmental effectiveness' and 'Technical feasibility'. As a result of the priority evaluation, the 'Soil testing and reduction of fertilizer and livestock manure application' activities were evaluated as having the highest priority. Based on the results of the priorities for these practical activities, examples of customized practical activity packages by farming type and environmental conditions were presented.

A Study on Priority Evaluation of the Rope-type Platform Safety Door(RPSD) Installation by Multi-criteria Decision Analysis (다기준 분석에 의한 로프형 승강장 안전도어의 설치 우선순위 산정에 관한 연구)

  • Jung, Byung Doo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.639-645
    • /
    • 2015
  • Recently, a study on the commercialization of Rope type Platform Safe Door (RPSD) technology has commenced. The study focuses on RPSD, in which a rope screen ascends to allow safe passage from the platform to the transit vehicle in aboveground stations. Currently, a pilot installation has taken in place with Daegu Metro Line 2 in MoonYang station starting from March of 2013. However, there is a need to select an appropriate pilot installation's object for the improvement in the future RPSD. An appropriate designation would correspond with the needs of the railroad corporation and as a historic railway platform with safe facilities. This study tried to usa Analytic Hierarchy Process (AHP) to determine the priority of the KTX stations to attain a list of appropriate designations for future RPSD installations by analyzing the followings: management of the facilities, operational risks, and intent of business projects. As a case study, it was applied to the evaluation of the KTX stations. For the application, it used relative measurement to calculate the weight of upper level structuring, and absolute measurement for low level structuring instead of pairwise comparisons.

Retrofit Prioritization of Highway Network considering Seismic Risk of System (지진 위험도를 고려한 도로 교통망의 내진보강 우선순위 결정)

  • Na, Ung-Jin;Park, Tae-Won;Shinozuka, Masanobu
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.12 no.6
    • /
    • pp.47-53
    • /
    • 2008
  • This research focuses on the issue of seismic retrofit prioritization based on the Caltrans' highway network serving Los Angeles and Orange counties. Retrofit prioritization is one of most important problems in earthquake engineering, and it is a problem that most decision makers face in the process of resource allocation. This study demonstrates the methods of prioritized resource allocation in the process of retrofitting a regional highway network. For the criteria of a retrofit ranking, seismic vulnerability and the importance of network link are first introduced. Subsequently, link-based seismic retrofit cases are simulated, investigating the effects of the seismic retrofit in terms of seismic performance, such as driver's delay. In this study, probabilistic scenario earthquakes are used to perform a probabilistic seismic risk analysis. The results show that the retrofit prioritization can be differently defined and ranked depending on the stakeholders. This study provides general guidelines for prioritization strategy for the effective retrofitting of a highway network system.