A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

The Efficiency Scheme of Design VE through the Case Studies of Construction VE for Apartments (공동주택 시공VE 사례분석을 통한 설계VE 효율화방안)

  • Kim, Yong-Su;Kim, Young-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.59-67
    • /
    • 2010
  • The purpose of this study is to efficiency scheme to design VE through the case studies of construction VE forapartments. The adapted research method includes five case studies of construction VE and analysis of constructionVE practice. The results of this study are as follows 1) For efficiency of design VE, data management system whichis necessary for construction VE database establishment and its application were proposed. 2) Through workingsystem improvement of construction VE, an improvement to design VE performance process was proposed. 3)Consideration factors and main VE items for efficient design VE item selection of apartment buildings wereproposed.

Alternative Evaluation Method of GFI-based Construction Value Engineering (GFI를 활용한 건설공사 시공VE 대안평가 방법)

  • Kim, Sooyong;Lee, Youngrok;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.3-10
    • /
    • 2015
  • Value engineering (VE) of the construction project is classified into design phase value engineering and construction phase value engineering. Design phase value engineering must apply to over 10 billion public construction projects by government law. Therefore, the design value engineering apply to actively in construction projects. In contrast, the construction value engineering apply to a limited certain construction project. The reason is that construction value engineering process can not reflect practical demands quality. The construction value engineering can implement to positive impact through the feasibility verification for constructability. In this research, we propose a method of construction value engineering that reflect the practical demands. This method is experts alternative evaluation of using by GFI-based. And, this study was applied to the practical cases to verify the applicability of the proposed method. As a result, proposed alternative evaluation method were analyzed highly efficient in terms of applying the process as well as the method compare to the conventional method.

A Basic Study for Building VET/CM Leading Construction VE Process (VET/CM 주도형 시공VE 프로세스 구축을 위한 기초연구)

  • Song, Hyun-Jang;Cha, Yong-Woon;Lee, Hyun-Jong;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.233-234
    • /
    • 2016
  • Design phase VE that is mandatory conducted in public construction project more than 10 billion won in accordance with the relevant laws and regulations has been activated in domestic application case of Value Engineering. But construction VE has been applied in specific project. Therefore, this study aims to deduce problems of poor performed construction VE through review of precedent researches and depth interviews of expert group. As one of the improvements this study suggest that a building plan which is VE process leading VET/CM.

  • PDF

A process for Reviewing the Applicability of VE Alternatives using BIM-based VR (BIM기반 VR을 활용한 VE 대안 적용가능성 검토 프로세스)

  • Ikhbayar, Khulug;Jin, Chengquan;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.89-90
    • /
    • 2021
  • VE is one of the technologies that are essential to promote cost reduction and performance improvement in construction projects. In the VE process, there are very important steps in deciding whether to adopt VE ideas and alternatives or not. However, when examining the possibility of selecting and adopting alternatives, it is difficult to clarify the differences and characteristics of the existing and improved proposals due to lack of understanding of the owner and inadequate consideration of harmonization with the alternative surroundings. In order to overcome these problems, it is necessary to effectively exchange information related to alternatives among VE participants and to examine the applicability of VE alternatives more in-depth. Therefore, in this study, a process for reviewing the applicability of VE Alternatives using BIM based VR was proposed to review more appropriate VE alternatives.

  • PDF

Development of Mobile-Based Design Value Engineering(VE) Supporting System for VE Process Improvement (VE프로세스 개선을 위한 모바일 기반의 설계VE 시스템 개발)

  • Song, Chang-Young;Yang, Byong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.433-443
    • /
    • 2021
  • Value Engineering(VE) is an organized effort to create the most value through a functional analysis and creation of alternatives. Depending on the VE job plan, a VE Workshop must be performed in a certain place within a certain period of time. A VE Workshop, which is an organized activity that aims to create the best value through functional analysis and creation of alternatives, should be held in a certain place and at a scheduled time according to the VE job plan. In the Pre-Study, VE Study and Post-Study phases of VE, functional assessments, performance evaluations and idea evaluations are driven by variable management techniques and analysis methods, respectively. Generally, VE is executed for about 3 to 5 days in a particular place to create value. However, there are many problems associated with limiting all VE processes to a specific place and schedule. Moreover, in Korea, VE teams are required to finish all VE processes in a limited time because of the short duration of VE workshops, the necessity of which has been overlooked. Therefore, an efficient VE support system is required to resolve the problem of time and space limitations. In this study, a VE support system based on the Mobile environment was developed to support the VE Workshop process. This VE support system enables participants to review design documents, drawing sheets and all VE-related documents using mobile devices. After the Workshop, participants can conveniently rearrange the result(evaluation of function and ideas) at the workshop. Not only can the members of VE team can review the design documents, drawing sheet and all VE-related documents in the step before the workshop, but also the result(evaluation of function and ideas) of the workshop can be easily rearranged in the phase after the workshop under the developed supporting system using mobile devices.

The Application Plan for Value Engineering Redesign by Using The Simulation for The Port Facilities Construction Project (항만시설 프로젝트의 시뮬레이션을 활용한 재설계 VE 적용방안)

  • Yoon, Moo-Hee;Ahn, Kyung-Soo
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.19 no.6
    • /
    • pp.533-546
    • /
    • 2007
  • This paper studied the design VE (Value Engineering) process among the various methods to satisfy the requirement of user and cost saving in the overall redesign process for the Turn-key base construction project. This study has been estabilished the rational and practical analysis process with the stepwise by using the design VE process. The efficiency and safety were verified with the adoptian of computer simulation to cope with the problem of initial analysis and verification for design VE process in the large construction project. In the previous design VE process, there is a limitation for the analysis of design VE in the planing stage and the execution time period of the large construction project. The previous application of VE technique was only for the construction of harbor facilities, so there was no contribution of cost saving in the function and construction. However, this paper proposed the selection methodology of VE items and hence the redesign VE process can be efficiently improved. It can be also improved the process of functional analysis rationally and practically. About 4.6 billion won has been saved with applying to the harbor construction project with using the VE method proposed in this paper. The study gives the direction of VE to be accomplished efficiently in the similar project.

An In-depth Analysis of Enhancing the Core Blueprint of Architectural Constructs Leveraging Value Engineering(VE) Techniques (VE 기법을 활용한 건축 구조물 코어 형식 개선 방안에 관한 연구)

  • Lee, Jae-Taek;Kim, Gyu-Yong;Lee, Jae-Hyun;Nam, Jeong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.571-581
    • /
    • 2023
  • The contemporary domestic construction landscape has witnessed a contraction, primarily attributed to the operational challenges faced by construction entities and a downtrend in the initiation of new projects. In light of this, domestic construction enterprises are ardently seeking avenues to economize whilst simultaneously amplifying the quality across diverse construction genres. Value engineering (VE), heralded for its prowess in not only cost mitigation but also in accelerating project timelines and bolstering construction quality, has been extensively adopted in refining finishing tasks. However, its application to framework enhancements remains conspicuously limited. Particularly in factory edification, framing emerges as a pivotal process exerting significant influence over the entire construction continuum. Thus, it becomes imperative to integrate VE techniques at the inception phase of framing. This would facilitate a meticulous examination of design schematics and on-site conditions, paving the way for alternative strategies that condense construction durations, economize on costs, and augment work efficiency, all the while upholding paramount standards of quality and safety. Such a venture stands to be foundational in expediting construction timelines, fostering economic efficiency, and buttressing construction safety protocols.

Efficient Problem-Solving Idea Generation in the Design Phase VE of Construction Projects using Business Creativity Codes(BCC) (건설 설계VE의 효율적 문제해결 아이디어 도출을 위한 비즈니스 창의성 코드(BCC) 활용방안)

  • Kim, Huy-Qyou;Park, Young-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.367-379
    • /
    • 2016
  • Although the importance of creative thinking is rapidly increasing in the new century, the generation of creative ideas and its application in the construction industry have been considered relatively difficult. Thus there have been a few studies on the subject that how to apply creative thinking tools with empirical evidence in the construction industry. Value engineering(VE) has been widely applied in the design phase of construction projects due to the government regulation, Brainstorming has been the most prevalent idea generation techniques in the VE activities during the past several decades. Contrary to popular belief, the performance of brainstorming is not so good. It is known as the brainstorming myth. This paper proposes the business creativity codes(BCC) as an alternative idea generation tool in the design phase VE of construction projects. In order to examine the effectiveness of the BCC, 50 successful field cases awarded in the design VE competition of government agency are used. The result shows that the BCC can be used as an effective idea generation tool in the design phase VE construction projects.

Construction Cost-Down of Building Substructure by VE Techniques (VE 기법에 의한 건물 지하구조의 공사원가 절감방안)

  • Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.125-132
    • /
    • 2005
  • Domestic construction firms make every effort to save cost and, contrarily, enhance quality for competitive advantage in the market. Structural work of building construction takes chaise of the total cost and schedule, thus elaborate planning and management of the work help to lead the project into a successful way. Therefore, the idea to save time and cost and enhance constructability securing quality and safety of the work should be developed after analyzing the designed documents and site conditions comprehensively in the initial construction planning phase. Value Engineering (VE) technique is introduced in the substructural work in this paper to save cost creatively and systematically in the design and construction phase. A practical VE model that is applied to the underground building work systematically is proposed to save cost and it applies to the actual project to confirm the effectiveness of the model.