1 |
Park HT, Park CS, Jung WS. A study on the improvement of the design ve process using ve idea-databank system. Korea Journal of Construction Engineering and Management. 2014 Jan;15(1).:28-10. https://doi.org/10.6106/KJCEM.2014.15.1.028
DOI
|
2 |
Kim SY, Yang JK. Process development and verification for construction ve object selection of performance-oriented. Korea Journal of Construction Engineering and Management. 2012 Jul;13(4):25-32. https://doi.org/10.6106/KJCEM.2012.13.4.025
DOI
|
3 |
Lim JG, Kim SH, LEE MJ. Development of web-based VE supporting system for effective workshop. Korea Journal of Construction Engineering and Management. 2014 Mar;15(2):71-8. https://doi.org/10.6106/KJCEM.2014.15.2.071
DOI
|
4 |
Kim SY, Lee YR, Yang JK. Alternative evaluation method of gfi-based construction value engineering. Korea Journal of Construction Engineering and Management. 2015 May;16(3):3-10. https://doi.org/10.6106/KJCEM.2015.16.3.003
DOI
|
5 |
Kim HG, Park YT. Efficient problem-solving idea generation in the design phase VE of construction projects using business creativity codes(BCC). Journal of the Korea Institute of Building Construction. 2016 Aug;16(4):367-79. https://doi.org/10.5345/JKIBC.2016.16.4.367
DOI
|
6 |
Johnston J. Job Plan [Internet]. Washington D.C.(SE): U.S. Department of Transpotation, Federal Highway Administration; 2017 Jun 27. Available from: https://www.fhwa.dot.gov/ve/vejob.cfm
|