• Title/Summary/Keyword: 시공 표준화

Search Result 154, Processing Time 0.021 seconds

Development of Standardization Algorithm for Indoor Point Cloud Data Based on the Geometric Feature of Structural Components (구조 부재의 형상적 특성 기반의 실내 포인트 클라우드 데이터의 표준화 알고리즘 개발)

  • Oh, Sangmin;Cha, Minsu;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.345-346
    • /
    • 2023
  • As the shape and size of detectable objects diversifying recognition and segmentation algorithms have been developed to acquire accurate shape information. Although a high density of data captured by the repetition of scanning improves the accuracy of algorithms the high dense data decreases the efficiency due to its large size. This paper proposes standardization algorithms using the feature of structural members on indoor point cloud data to improve the process. First of all we determine the reduction rate of the density based on the features of the target objects then the data reduction algorithm compresses the data based on the reduction rate. Second the data arrangement algorithm rotates the data until the normal vector of data is aligned along the coordinate axis to allow the following algorithms to operate properly. Final the data arrangement algorithm separates the rotated data into their leaning axis. This allows reverse engineering of indoor point clouds to obtain the efficiency and accuracy of refinement processes.

  • PDF

A Study on Improving Concrete Techniques to Enhance the Performance of Concrete Floor (콘크리트 바닥 마감재의 성능 향상을 위한 시공법 개선 연구)

  • Jeong, Hojeong;Yu, Chaeyeon;Kim, Jaeyoung;Son, Seongwon;Ihm, Jongtae;Kim, Sungjin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.5
    • /
    • pp.529-540
    • /
    • 2024
  • This research aimed to refine the concrete floor finishing for enhancing its performance compared to the traditional way. The new method involved the removing the deteriorated mortar layer and reinforcing the surface to augment the durability and bond strength of the floor surface. This study performed the experience to evaluate the bond strength, drop depth, rebound hammer hardness, and the surface hardness of the surface by adopting traditional and refined method. The results showed the proposed method enhanced the performance on all the metrics. Based on the experiment, the bond strength increased about 2.79 times before installing the finishing material, and the strength also improved about 1.67 times and 1.44 times at the painted finishing and non-painted finishing, respectively. In addition, the drop depth decreased about 4.42 times when adopting the proposed method, which shows the enhanced resistance to declamination compared with applying the traditional way. Lastly, the surface hardness measured by scratch thickness significantly improved about 505% in this experiment. The finding of this study indicates that the proposed method can substantially enhance in bond strendth and durability of floor finishing, reduce the defects of the concrete-based floor, and extend the life of the products.

Checklists for Construction Drawings of Office Buildings based on Working Drawing Analysis (공사용도면 현황분석에 기반한 일반업무시설 실시설계도면 체크리스트 개선방안)

  • Lee, Beom-Koo;Jung, Tae-Hwan;Park, Hyung-Jin;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.3-11
    • /
    • 2010
  • Currently the quality of construction drawings is deteriorated due to restrictions on time costs allowed to the design phase. Moreover shop drawings are arbitrarily produced without the standard criteria, and cleared off after the completion of construction. As a result, the information of produced shop drawings is not feedback to the design phase, and the quality of the construction drawings become worse. This study proposes checklists that include information requested at construction sites and the shop drawings as well as the existing checklists for the construction drawings. The checklists integrate designer's check-items according to breakdown of drawings and contractor's check-items base don construction process. Index matrices of the integrated checklists is developed for practical application of the checklists, and validated through intensive interview with design and construction practitioners.

The Analysis of the Important Problems on Designing and Constructing Earth Retaining Structures (지반굴착 흙막이 구조물 설계 및 시공시 중요문제점 분석)

  • Lee, Song;Kim, Ju-Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.2
    • /
    • pp.167-174
    • /
    • 2002
  • Earth retaining structure is constructed structure in order to construct a multistoried building, the subway, a subterranean downtown for effective use and obtainments of the limited ground. Recently, many kinds of research have been actively developed for a standardization and a database on designing and constructing of bridge, tunnel, road. With the works of database construction of that, many kinds of data with respect to statistics is cumulated. However, Database work of designed and constructed earth retaining structure in the construction field is wholly lacking and lagged behind in the works of database construction. This paper suggested classification system on indication data in connection with designing and constructing earth retaining structures a hundred fields. On the basis of that, code work with classification system was practised and DB program of indication data in connection with designing and constructing earth retaining structures was developed.

A Comparative Analysis of Risk Impacts on Cost Overrun between Actual Cases and Managers' Perception on Overseas Construction Projects (해외 프로젝트 시공단계 리스크 요인의 실제 비용 초과 영향과 현장관리자 인식 차이 분석)

  • Lee, Kyung-Tae;Ann, Hannah;Kim, Jae-Won;Kim, Ju-Hyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.52-60
    • /
    • 2021
  • Due to the significant size of overseas construction projects, the cost overrun has enormous impacts on the financial status of construction companies. The managers' appropriate perception and identification of key risk factors in the construction phase notably affect the performance of projects. However, the actual impacts of risk factors and local manager' s perception of them could be deviated. For this reason, we aim to compare the performance of actual cases and general opinions of responsible practitioners in terms of risk factors relevant to cost overruns in order to present a practical strategy for risk management. Firstly, factors classified from literature review were used to simulate 290 cost overruns data sets from 20 cases by introducing Monte-Carlo Simulation and were ranked by standardized coefficients through multiple regression analysis. Secondly, a survey was conducted against 42 local managers to rank their perception of impact on cost overrun with identical factors by using Stepwise Weight Assessment Ratio Analysis (SWARA). Comparison results show that conflicts such as 'conflict with subcontractors' and 'conflict with the local community' have caused excessive cost overrun. However, managers' perception of these as less significant than the actual influences and consider other risks such as 'material price fluctuation' and 'construction quality errors', as relatively serious. Therefore, education for local managers on conflict risks needs to be presented.

A Fundamental Study on the Automated Formwork System for Bridge Pier Unmanned Construction (교각 무인시공 자동화 거푸집 시스템 구성을 위한 기초 연구)

  • Lee, Jae Heun;Yoon, Hyejin;Kim, Young Jin;Chin, Won Jong;Lee, Sang Yoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.5
    • /
    • pp.707-717
    • /
    • 2024
  • Recently, the implementation of unmanned and automated technologies has been actively considered as a solution to reduce safety accidents in industrial sites. However, bridge construction sites are recognized as a more challenging area for research and development compared to other industries due to the complexity of the site, such as weather and terrain, and the fact that the work is not repetitive or standardized. In this paper, a formwork system for unmanned and automated construction of bridge piers, which are considered high-risk work environments due to tasks such as rebar assembly, concrete pouring, and formwork dismantling and assembly at high altitudes, was developed. To achieve this, the formwork was equipped with motorized spindles and an automated lifting system to replace the manual dismantling and assembly process. Additionally, manipulators were installed on the upper work platform to replace workers in tasks such as rebar assembly and concrete pouring. To verify the proposed technology, we aimed to demonstrate the feasibility of the automated formwork system for unmanned pier construction through an assembly test.

An Experimental Study on Fire Resistance Performance Test of Non-loadbearing Ceiling Systems (비내력 천장구조 내화성능평가에 대한 실험적 연구)

  • Choi, Dong-Ho;Kim, Dae-Hoi;Park, Soo-Young
    • Fire Science and Engineering
    • /
    • v.25 no.4
    • /
    • pp.22-27
    • /
    • 2011
  • Fire resistance ceiling system is the structure of which the ceiling installed under the slave of the structure has the fire resistance performance. Because of having the fire resistance performance, fire resistive coatings on steel beams can be reduced and large span structures can be constructed. So, it have advantages of convenience for construction, shorten for construction time and cost reducing. In foreign country, it is general that one system consisting of slave and ceiling is constructed as a fire resistance system. But in Korea, there are no fire resistance ceiling systems thus economical efficiency due to being high-rise and light-weight of structures is not secured. Therefore research and development of nominal fire resistance ceiling systems is necessary. On this study, fire resistances of standard non-loadbearing ceiling systems were assessed and basic informations for developing the fire resistance non-loadbearing ceiling systems were presented.

A Study on standardized instrumentation for solar power plants operated remote control (태양광발전소 원격 운영관제를 위한 표준화 계측 및 수익형 운영모델에 관한 연구)

  • Woo, Je-Teak;Lee, Jae-Hwan;Seo, Tae-Won;Han, Myung-Hee;Seo, Mi-Ja
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.6
    • /
    • pp.707-712
    • /
    • 2015
  • The rapid spread of solar power plants with a variety of design, development, construction, maintenance and related technology companies to co-vary. In this paper, we review and research necessary to proceed with a technical background and potential and further development to control various operating solar power plants in the new and older remotely.

Design of Construction Failure Index Quantification System for Risk Management Standardization (리스크 관리 표준화를 위한 건설실패지수 정량화 시스템 설계)

  • Kim, Woong-Bo;Park, Seok-Cheon;Kim, Sung-Chul
    • Annual Conference of KIPS
    • /
    • 2015.04a
    • /
    • pp.518-521
    • /
    • 2015
  • 최근 건설 프로젝트의 대형화 및 다양한 신공법들의 도입으로 불확실한 위험도 요인들이 점점 증가함으로써 일련의 시스템적 절차에 따른 리스크 관리(Risk Management) 체계를 수립하여 활용하고 있다. 하지만 국내 시공사와 발주사들은 과거 자신의 경험과 직관에 의존하여 리스크를 다루고 있을 뿐 공사와 관련된 요인을 체계적으로 분류하고 수치화하여 관리하는 곳은 거의 찾아 볼 수가 없는 실정이다. 따라서 본 논문에서는 건설 리스크 관리수준 향상을 위해 건설실패지수를 활용한 기업단위의 정량화 시스템을 설계하고, 이를 표준화하기 위한 정부 연계 시스템 구성에 대해 연구하였다.

A Study on the Investigation of Demander's Consciousness for Standardization and Information of Construction Materials (건설자재 표준화 및 정보활용에 대한 수요자 의식 조사 연구)

  • Choi, Young-Jun;Cho, Young-Keun;Kwon, Ki-Jun;Chae, Seong-Tae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.2 s.25
    • /
    • pp.7-12
    • /
    • 2007
  • This study has been conducted to present reform recommendations for Standardization of Construction Materials, based on a study on the Investigation of Demander's Consciousness for Construction Materials Quality and Information Standardization in Korea. Upon investigation, it was found that the quality of Korea Industrial Standards (KS) was given 67 points (out of 100) by respondents. In addition, 38% of the respondents showed that they had problems with a lack of Standardized Information. Good examples were found to be non-standardized materials, e.g. admixtures, waterproof agents, reinforcing fibers, concrete, aggregates, adhesives, wood, temporary materials, thermal-insulating materials, etc. Upon results from the investigation of demander's consciousness for infrastructure of standardization of information, 71.2% of respondents thought that it is necessary to informatize construction materials. They made following demands on the informatization to be, in order: Quality, Standard, Price (Cost), Operation, Drawing, Law, and Information.