Korean Journal of Construction Engineering and Management
/
v.9
no.1
/
pp.66-76
/
2008
Plant project is a complex project that consists of civil engineering, building, mechanical and electronic works. The schedule management is one of important factors in plant project because the construction duration of the project is very short comparing with the other construction projects. Specially, 4D CAD system needs to visualize construction schedule information in those complex projects. This study suggests methodologies for improving 4D CAD functions by considering those project characteristics. To develop a plant 4D CAD system, this study includes to develop new functions by analyzing actual schedule information from the plant construction sites.
Proceedings of the Computational Structural Engineering Institute Conference
/
2009.04a
/
pp.72-75
/
2009
본 논문에서는 현재 국내에서 구축되어 있지 않은 3차원 BIM 기반 설계 및 시공 환경으로의 패러다임 전환에 대비하여 3차원 BIM 지향적 구조설계 프로그램인 SDP 제품군을 사용하여 BIM 프로그램들을 연동한 3차원 BIM 철근배근 자동생성 시스템을 개발하고자 한다. 현재 국내 건설업계의 치열한 수주경쟁으로 수익률저하/철근 등 자제가 폭등/인건비 상승/배근시공도 작성 인력 부족 및 신뢰성 저하 및 납기 지연 등의 기존 현황의 문제점 등을 SDP 제품군을 이용하여 구조설계/배근시공도 작성/정밀 골조물량 산출을 통합 지원하는 엔지니어링 컨설팅 환경을 구축하여 구조설계 시 V/E 동시 수행, 골조공사비 10% 절감, 배근시공도 및 물량산출 납기 최소로 단축, 배근시공도 정확성 향상/설계 및 시공 변경에 신속 대응, 공정 대비 발주 물량 관리 기능을 제공함으로써 고수익, 고효율, 고품질 의 엔지니어링 컨설팅 수행이 가능하다. 3차원 BIM 을 기반으로 철근현장가공에서 공장가공 전환 가속화로 국가적 물량 절감을 기대할 수 있고, 3차원 BIM 구조설계 및 골조공사 환경 구축 및 기술 자립을 통해 건설시공 분야의 기술력 향상을 기대할 수 있다.
본 터널 붕락 사례 연구를 종합적으로 분석해 볼때, 시공 공정 중에 발생 가능한 붕괴 및 붕락은 앞서와 같이 과거의 여러 사례들을 토대로 분석함으로서 예측 할 수 있지만, 시공 외적인 요인에 대해서는 사실상 조사, 설계, 시공 중의 오류에 의해 발생되는 것이기 때문에 파악하기 어렵다. 본 터널 붕락사례를 통해 원인을 분석 정리 하면 다음과 같다. (1) 불규칙한 지반구조적 원인 대부분의 터널 붕락을 일으키는 불규칙한 지반구조는 과거 지반구조의 침식 또는 대규모 지반운동 등 지반구조의 급속한 변화에 기인한 것이다. 터널 시공전에 면밀한 사전 지반조사와 선진 보오링 등으로 정확한 지반구조를 파악한다면 이로 인한 터널 붕락은 최소화 시킬수 있다. (2) 기획과 설계단계에서의 오류 충분치 못한 지반조사에 의한 설계 및 부적절한 시공자재 사용등으로 터널 붕락이 발생 될수 있다. 터널 굴착 주변 지반조건과 이러한 지반조건에 적합한 터널 굴착 및 보강공법 등이 터널 설계시 심도있게 검토되어야 할 가장 중요한 요소이다. (3) 시공 및 관리에서의 오류 경험이 부족한 터널기술자의 현장 감독과 현장에서 수집되는 각종 계측자료의 신뢰성 부족과 결과의 재적용 미흡으로 효율적인 계측 및 지반정보를 활용한 정밀 시공이 이루어지지 않는 것도 터널 붕락의 중요한 요인으로 분석되었다. (4) 현장관리 조사서의 표준화 부족 터널굴착공사중 붕락이 발생된 현장의 막장조사결과를 보면 조사자가 임의로 표시를 하여 각 터널별 막장조사결과가 매우 상이할 뿐만 아니라 각 터널별로 기재방법, 양식이 달라서 실제 원인분석에 활용하기가 어려운 것으로 분석되었다.
Journal of Korean Society for Geospatial Information Science
/
v.21
no.4
/
pp.3-12
/
2013
In order to evaluate dredging results scientifically the system which can manage and estimate working process by monitoring dredging process in real-time needs to be constructed. We constructed real-time dredging management system for guidance of a dredging vessel and for survey of dredging construction. This system was designed to have functions of dredger location by GPS, ship direction measurement by GPS/Gyroscope combination, Grab position measurement, dredging depth measurement and correction. In addition, we developed the programs for controlling and operating the constructed system. The system could induce the vessel to accurate position and conduct dredging according to plan and the effectiveness of the system was evaluated through the results of application to actual dredging construction site.
Korean Journal of Construction Engineering and Management
/
v.14
no.5
/
pp.74-83
/
2013
Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.
Journal of the Korea Institute of Building Construction
/
v.22
no.4
/
pp.347-358
/
2022
In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.
Journal of the Korea Institute of Building Construction
/
v.11
no.6
/
pp.567-575
/
2011
With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.
Proceedings of the Korean Institute of Building Construction Conference
/
2014.05a
/
pp.294-295
/
2014
Recently, it is becoming necessary for architectural heritage to make spatial information structure by using BIM(Building Information Modeling). However, current BIM system can not be used because its information classification and structure is not suitable for architectural heritage. This is a basic study which focuses on upgrading spatial information structure of BIM so that it would be possible to use BIM in management of preservation of architectural heritage, too. This study analyzes Sungnyemun case and its spatial information structure.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.182-189
/
2007
To reform and improve the productivity of construction industry, 1) it should be encouraged to improve the construction production process and 2) it is required to enhance reliability of construction information based on the systematic thinking process. To promote the information reliability created during construction production process, Lean Construction Research Center(LRC2) is developing a supporting system to improve design/material supply/schedule management, functioning to efficiently manage the information created at construction production processes and developing a web based construction information system that provides result management/decision making support/knowledge based information services.
Proceedings of the Computational Structural Engineering Institute Conference
/
2009.04a
/
pp.513-516
/
2009
본 논문에서는 사례연구를 통하여 RC구조 BIM에서의 물량정보 획득의 효율성을 분석하고 이를 기반으로 BIM 프로세스 환경에서의 철근 및 콘크리트 물량산출을 위한 데이터베이스를 구축하여 현장 시공단계에서의 공정 및 물량관리의 협업단계를 가능하도록 하는 철근 Sorting 시스템에 대한 연구를 목적으로 한다. 기존의 건설, 건축분야에서의 정보는 기호적 언어와 2차원 기반의 도면 정보체계를 통해 표현되었지만, BIM 기술을 통해 건물의 실제 형상과 정보를 가지는 3차원 기반의 정보체계로의 변화와 함께 컴퓨터 데이터베이스 내에서 프로젝트에 포함된 모든 정보를 저장하고, 다양한 형태로 필요에 따라 정보를 표현할 수 있게 변화하고 있다. 견적 및 시공을 위한 RC구조설계단계에서의 배근 모델은 협업을 위한 객체 정보의 획득 및 추출이 중요하지만 현재 상용되고 있는 BIM도구에서는 현재까지 미흡한 체계를 이루고 있다. 본 논문에서는 구조설계를 기반으로 배근된 BIM 구조모델 사례를 통하여 기존 BIM도구에서의 물량 정보획득 효율성 분석을 기반으로 객체들의 데이터베이스 구축을 통한 철근 Sorting 시스템 구축 연구를 통하여 협업단계에서의 체계적 물량정보 관리를 가능하도록 하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.