• Title/Summary/Keyword: 시공성 분석

Search Result 2,265, Processing Time 0.027 seconds

A Study on Construction Evaluation Criteria for Securing the Objectivity in Public Construction (공공공사 시공평가 항목의 객관성 확보를 위한 주요 개선 항목 도출에 관한 연구)

  • Seo, Se Deok;Kim, Ok Kyue;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.913-921
    • /
    • 2019
  • The government introduced the comprehensive evaluation bidding system with the goal of pursuing the best value and the global standard in 2016. However, for the evaluation criteria on the construction evaluation reflected to the comprehensive evaluation bidding system, the problems of the objectivity insufficiency, the inclusion of multiple subjective evaluation items, and the irrationality of the weight for each evaluation item are continue to be presented. The central office group, the local government, the relevant industry, and the expert group share recognition, but the solution is not derived. Hence, the major evaluation items to be improved were derived with the characteristics analyzed to secure the objectivity of the construction evaluation. For the analysis method, the standard deviation and the Fleiss Kappa analysis method were used by utilizing the characteristics that the construction evaluation criteria consist of all 4-point measures (good, average, insufficient, and poor). According to the result, the 10 evaluation items of the total 25 construction evaluation items were derived as the evaluation items to be improved. It was found in the analysis on the major characteristics of the derived evaluation items that the qualitative evaluation criteria such as 'Very Suitable' and 'Suitable' were commonly included in the detailed evaluation guidelines. Hence, as far as the future construction evaluation standards are concerned, the qualitative evaluation standards are sublated, and the improvement should be made mainly for the quantitative evaluation criteria enabling the objectivity assurance.

Constructability Effect of HDPE Greased Strand Applying to Post-tensioning in Reactor Containment Building (피복텐던을 적용한 원자로건물 포스트텐셔닝 시공효율성 분석)

  • Bang, Chang-Joon;Park, Jong-Hyok;Lee, Byong-Soo;Kim, Seok-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.169-170
    • /
    • 2012
  • It is analyzed that constructability of post-tensioning system applying HDPE greased strand that is greased and coated by high density polyethylene on a bare strand in reactor containment building. The improvement of corrosion resistance by greasing and HDPE coating on a strand makes transportation, handling and installation of tendon to be easier. Therefore, serial and repetitive process of post-tensioning composed of construction preparation, tendon installation, stressing and anchoring, grease injection could be improved parallel and lumping process of installation and grouting, stressing and anchoring.

  • PDF

How Different Material of Wood Deck Impact Workability and Defect Occurrence (목재데크 소재의 차이가 시공성 및 하자발생에 미치는 영향)

  • LEE, Hyukjae
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.1
    • /
    • pp.463-469
    • /
    • 2020
  • People enjoy more leisure time these days as the government introduced the workweek last year and there is a growing interest on living healthy life. Amidst such change in society, trekking in forest has gained popularity along more people spending leisure time by walking for health. As a result, there are many scenic trails being built using wood deck. Usually certain parts of trails are built with wood deck where the path maybe too dangerous for walking or where nature needs to be protected. However wood material used for deck is easily prone to defects which can lead to safety issues. This study aims to understand the differences by materials used for wood deck and to investigate a link between different materials used and causes for defect occurrence. And further, the study aims to identify materials and construction methods for high workability and safety. The study was able to conclude that different materials used and different construction methods of applied for wood deck yield different results in terms of workability and defect occurrence.

A Case Study on the Design and Construction of a 2-arch Tunnel with Varying Section (2-아치 변단면터널의 설계 및 시공사례 연구)

  • Choi, Jae-Jin;Park, Yeon-Jun;Kim, Si-Keun;Park, Jae-Hyun
    • Tunnel and Underground Space
    • /
    • v.22 no.5
    • /
    • pp.310-320
    • /
    • 2012
  • This paper describes the design and construction of a 2-arch tunnel with varying section. This new design has advantages of 2-arch tunnels, which is rather expensive, but is still economically competitive compared to parallel tunnels. Economic analysis was also conducted. To secure the stability of the varying section tunnel, excavated part was reinforced by tie-bolts and RRS, and 2-arch part was supported by EPS blocks and concrete walls. Stability of the pillar was theoretically analyzed and also examined by numerical simulations for various widths. Displacement monitoring was conducted and results were compared with numerical results. Economic analysis showed reductions in construction cost and period by 11% and 10 months respectively.

Modular Building Construction Process Development by Benchmarking International Best Practices (선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안)

  • Shin, HyunKyu;Ahn, YongHan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.6
    • /
    • pp.3-12
    • /
    • 2016
  • The purpose of this study is to provide a domestic applicable modular building construction process by benchmarking international best practices. In this study, we derive the risk factors that may occur in performing a modular construction projects and the modular construction management factors through case analysis. In order to effectively respond to risks in performing a modular building projects, we propose the modular building construction process which is separated by a transportation, lifting, assembly steps based on the unit module construction sequence. It is the key to providing management information and guidelines for the design, production, construction participants by reflecting the information for each step in the process. This study would prevent a potential hazard which may occur in the construction process. Consequently, It could result in saving the entire cost of modular construction project as shortening the project schedule and could improve workability of modular construction.

A Study on the Task Variation and Social Network Analysis in the Construction Process (시공 프로세스에서 발생하는 공사변동 요인 및 네트워크 분석에 관한 연구)

  • Park, Yoona;Lee, Dongdeok;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.105-113
    • /
    • 2019
  • A construction project is a complex process consisting of interdependent tasks. If one task has variation, other tasks will be affected additionally and it is difficult to reach consensus on task variation due to the characteristics of the construction site that is going on quickly and complicatedly. Therefore, this study identified the root cause of task variation in construction process. Adjacent matrix was created with the tasks corresponding to major causes of variation, and the network analysis was performed. The results of social network analysis in the construction process can stabilize the work flow in the complex process and improve the reliability of the process plan and the project performance.

A Study on Development of Modular System using Light-weighted Structure Members (경량형강을 사용한 모듈러 시스템 개발에 관한 연구)

  • Zheng, Sheng-Lin;Ju, Gi-Su;Park, Sung-Moo
    • Proceeding of KASS Symposium
    • /
    • 2008.05a
    • /
    • pp.43-48
    • /
    • 2008
  • The object of this paper is to evaluate on constructability of modular steel frame with the hollow structural steel section to LEB C-shape. A modular building is built with factory-manufacture and site-construction. The advantage of a Modular building presents that enhanced building quality, shortened construction period and easy at an expansion and enlargement for buildings but also has demerits such as size restriction of the modular units according to the Road Traffic Law and Inflexibility of the unit composition. So in this study we use light-weighted structure members with bolted joint for easy Knock-down and traffic, also we evaluated the constructability of this bolted joints type modular buildings.

  • PDF

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

A Study on the CM at Risk Business Model using Business Model Canvas (비즈니스 모델 캠버스(BMC)를 이용한 시공책임형 CM 비즈니스 모델에 관한 연구)

  • Park, Kyungmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.23-31
    • /
    • 2016
  • The domestic market of CM at Risk has not been activated yet. It was analyzed duo to the fact that construction owners didn't have confidence in CM at Risk, because of the concerns regarding CM firms reliability, service, specialty, system and feasibility. Therefore, this study analyzed the problems to find the reason for declines in orders through a business diagnosis based on the Business Model Canvas(BMC) and set up the direction of business model improvement with one on one expert interviews. Additionally, we suggested the sub-activities for the business model improvements of CM at Risk service that are divided into 9 building blocks. Through this method, we determined that we would need preceding innovation activities such as good communication with customers, reinforcement of subcontract and excellence in project operations to convert the successful practice and settlement of the CM business model based in BMC. It is expected that the business model suggested from this study would contribute to improvement of CM at Risk competition and the differentiation strategy when compared with other firms. Also, it would be used a basis data to develop CM at Risk business model in the future.

Statistical Analysis of Resistance of Reinforced Concrete Members (철근콘크리트 부재강도의 확률적 특성 분석)

  • 김상효;배규웅;박흥석
    • Magazine of the Korea Concrete Institute
    • /
    • v.3 no.4
    • /
    • pp.117-123
    • /
    • 1991
  • It is widely recognized that the strengths of reinforced concrete members have random characteristics due to the variability of the mechanical properties of concrete and steel, the dimensional error as well as incorrect placement of reinforcing bars. Statistical models of the variabilities of strengths of reinforced concrete members, therefore, need to be developed to evaluate the safety level implied in current practices. Based on the probabilistic models of basic factors affecting the R.C. member strengths, in this study, the probabilistic characteristics of member resistance have been studied through Monte Carlo simulation.