• 제목/요약/키워드: 시공계약

Search Result 196, Processing Time 0.026 seconds

Path optimization method for shifting path planning of marking robot (먹매김 로봇 작업경로 설정을 위한 최적경로 탐색방법)

  • Lim, Hyunsu;Kim, Taehoon;Kim, Taehoon;Kim, Chang-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.144-145
    • /
    • 2022
  • Since the marking robot draws lines by point-to-point operation, the robot's shifting path greatly affects the working time and productivity. Therefore, it is required to analyze the movement method based on the robot's motion and plan to minimize the movement time. Therefore, this study proposes a method that can optimize the robot's shifting path to minimize the working time of the marking robot. Through the results of this study, it is expected that the non-working time of the marking robot will be reduced and the efficient operation will be possible.

  • PDF

Deduction or Importance Analysis for Pre-dispute Factors in the Constructions (건설공사 사전분쟁요인 도출 및 중요도 분석)

  • Park, Sung-Yong;Ko, Dae-Jun;Ha, Bong-Gyun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.505-508
    • /
    • 2008
  • It's hard to express a lot of information within the drawings and the specifications as construction projects have gradually become large-size and complex. So, disputes are caused by that and reason that the usual practice(culture) of contract of the constructions in Korea is based on unfair rather than the fair principle between clients and contractors. However, the contractors don't try to solve this kind of things because they are worried about at their disadvantage situation. Therefore, this paper deduced the factors in the pre-dispute phase by analysing the cases of the civic counseling in the office of supply and the pre-dispute factors, and conduct analysis on the factors' importance by using AHP. The results will be used for a check-list to prevent the disputes.

  • PDF

Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.

Improvement on the Non-standardized Name Use of Chinese Granite for Korean Building Constructions (건축공사용 중국산 화강석의 명칭혼란 개선방안)

  • Kim, Jae-Yeob;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.81-87
    • /
    • 2015
  • The purpose of this study is to analyze the problem of confusing the names of Chinese granite used in Korean construction work and suggest the improvement plans for them. Interviews of the experts from the stone company, studies on the existing research literature, and analyses of construction work documents of the 23 construction works which used Chinese granite were carried out to analyze the real condition of name confusion of granite stone. In the analytical result of the real condition, name confusion was classified into 4 types and problems derived from it were done into 4 ones. An additional survey was carried out targeting 34 masonry experts to draw the improvement plans based on the analytical results of the real condition of name confusion. The results show that the most fundamental solution is to continue to make efforts to use exact names when main agents related to construction works communicate with each other regarding Chinese granite stone and the process to make out construction contract documents.

Analysis of Construction Dispute Cases Considering Reward Ratio Focused on Arbitration Cases of Korean Commercial Arbitration Board (보상비율을 고려한 건설사업 분쟁사례 분석 - 대한상사중재원 중재판정사례를 중심으로 -)

  • Ahn, SangHyun;Choi, Heeju;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.48-56
    • /
    • 2017
  • Construction Projects have many participants by characteristic, scale and contract. Those also have complicated communication structure. So, claim and dispute occur continuously for conflicting communication. In many claim and dispute cases, it usually occurs between builder and owner. Unfair practices by owners position cause main claim and dispute. This study analyses judgment type, cause and compensation ratio in korean commercial arbitration case and provides the dispute information for builder that has weak position by contract. It draws analysis information for managing and controlling dispute that order type, judgement type, cause and failure case. Using these analysis information, it hopes to help inducement of dispute agreement and save time and economic damage for builder during construction. It also hopes to rise construction completeness by providing dispute management information.

Analysis of unfair provisions in Construction contract (건설공사 계약서상 불공정특약의 문제점 분석에 관한 연구)

  • Park Keun-Hyung;Kim Jeong-Jae;Choi Jea-Won;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.340-343
    • /
    • 2004
  • The purposes of this study is to survey unfair aspect of specific provisions in the construction contract. The research method of this stud)'includes judicial precedents and a questionnaier survey. The result of thus study are as follows: 1) unfair payment condition gives increase to faulty construction. 2) shift of the responsibility gives increase to delay, 3) adjusted contract sum gives increase inappropriate compensation to contractor.

  • PDF

A Case Study on the Calculation of Delay Damages for Contractors according to the Extension of Contract Period (계약기간 연장에 따른 시공자의 손실비용 산정에 관한 사례 연구.)

  • Lee Gi-Han;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.305-310
    • /
    • 2001
  • The purpose of this study is to calculate delay damages for contractors. The study has been performed by investigation of delay cost occurrence status and the analysis of subway construction cases. The results of this study are as follows: 1. Delay cost( 1day) equivalent to $0.005\%$ of total construction cost by analysis case studies. 2. Including bank interest, dealy cost is analysed as the following; $1.1\~9.2\%$ of total construction cost in part extension period, $3.3\~11.0\%$ of total construction cost in total extension period. 3. In comparison between liquidated damages and delay cost, liquidated damages account for average 20.1 times of delay costs. 4. Acceleration cost will be calculate on the basis of delay cost calculation method. In the result of this method, acceleration cost is equal to delay cost at least or must be large than delay cost

  • PDF

해외건설공사 수행절차(3)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.8 s.217
    • /
    • pp.64-67
    • /
    • 2008
  • 해외공사는 주로 해외지점망, 외국설계회사, 발주자 또는 기존 현장을 통해 입수한 공사정보(공사비 및 공사개요, 재원, 발주자, 설계회사, 입찰일정 등)를 토대로 입찰참여 여부를 결정하며, 입찰 자격심사(PQ : Pre-qualification)를 거쳐, 입찰서를 발급받아 견적서를 작성하고 입찰에 임하게 된다. 입찰, 수주활동을 하는 동안 주요사항을 국토해양부 및 해외건설협회에 단계별로 소정의 양식에 의거 보고한다. 주요보고사항 $\Delta$ 수주활동상황보고(입찰예정일 10일 전까지) $\Delta$ 계약체결결과보고(계약체결 15일 이내) $\Delta$ 시공상황보고(매분기 종료후 30일 이내) $\Delta$ 공사내용변경보고(변경 15일 이내) $\Delta$ 준공보고(준공증명서 발급 15일 이내)

  • PDF

A Coordinative Committee Model between Architects and Contractors in Design-Build Projects (설계시공일괄공사에서 설계자와 시공자 간의 단계별 중간협의체 운영모델)

  • Kong Seung-Hwan;Kong Seung-Hwan;Eom Ik-Joon;Koo Kyo-jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.323-328
    • /
    • 2004
  • Domestic Design-Build, which has applied for client's convenience, has many problems Because It is being applied in the building law, which devides between architects and contractors. Among problem the relation between architects and contractors is a typical problem. It makes a quality decline and a design skill decline. In result, it causes insufficience of competitive power in overseas projects from now on. So we present the plans to improve mutual relations between architects and contractors. And we induce development of design skill and good quality of building by presenting a coordinative committee model between them in Design-Build projects.

  • PDF

Deployment of Appropriate Architectural Construction Engineers to Solve Quality and Safety Problems at Construction Sites (건설현장의 품질·안전문제 해결을 위한 적정 건축시공기술자의 배치 관련 연구)

  • Kim, Hyunjun;Kim, Jin-Dong;Shin, Yoonseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.15-23
    • /
    • 2024
  • Recently, quality problems, such as the collapse of apartment structures under construction, has emerged as a social issue. Although there are various causes of quality problem and the impact of each problem may be different, the problems from the perspective of construction engineer of construction company are investigated. Therefore, this study aim to investigate the adequacy of construction engineer's experience, number of field engineer, timing of engineer deployment at construction sites, etc. in order to resolve quality and safety problems. In this study, a questionnaire survey was conducted targeting construction managers to obtain objective opinions. The results showed that the number of construction engineers in construction companies should be increased and that intermediate construction engineers should be increased to enable practical site management for resolving quality and safety problems. In addition, it was found that there was a need to reduce the number of non-regular employed field construction engineers in construction site and at the same time systematically regulate the number of on-site construction engineers, similar to safety managers and quality managers.