• Title/Summary/Keyword: 수주관리

Search Result 263, Processing Time 0.023 seconds

Market effects analysis of when lowering the threshold value of construction services under WTO GPA (WTO 정부조달협정 건설서비스 양허하한선 인하시의 건설시장 변화와 대응방안)

  • Moon, Hyuk;Kim, Myeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.72-82
    • /
    • 2009
  • Lowering threshold value of construction services is extremely sensitive issue to the small and medium enterprises in construction industry. Because it means opening the construction markets where the small and medium construction companies compete intensely. Nevertheless, it is absent that the analysis on the effect of opening the market lowering threshold value of construction services under Government Procurement Agreements or Free Trade Agreement. This research is to analyze the effects of lowering threshold value of construction service which have been agenda repeatedly in the international agreements such as WTO and FTA. The current threshold value of construction services of Korea under WTO GPA are 5million SDR where the government delivers and 15million SDR where the local government or the public institution deliver. However major parties to an entente such as USA and EU have been demanding to lower threshold value of 15 million SDR where the local government or the public institution deliver to 5million SDR. The analysis figure the effect of this lowering threshold value to be a market reduction by 2trillion Won as '07 fiscal year basis. This market shrinkage will effect to the small and medium construction companies in local considerably.

Improvement of SW Acquisition${\cdot}$Management Processes in public sectors (공공부문 SW사업 발주${\cdot}$관리 프로세스 개선방안;'공공부문 SW사업 발주${\cdot}$관리 표준프로세스 지침' 시범적용 및 개선을 중심으로)

  • Huh, Jeong;Song, Ki-Ho;Ko, Byung-Sun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.05a
    • /
    • pp.62-70
    • /
    • 2006
  • 공공부문의 SW에 대한 사용자의 기대 및 정보화 요구에 부응하기 위하여 그동안 국내에서는 수많은 SW 시스템들이 개발되어 왔으나, 개발 과정에 대한 체계적인 관리 방법이 미흡하여 발주자가 복잡한 SW 발주과정을 추진하기 어려우며 SW 개발자에 대한 관리 통제수단이 미흡한 실정이다. 또한 발주자의 전문성 결여로 수주자인 개발업체에 과도하게 의존하는 업무 추진과 수발주자 간의 불명확한 업무 인식으로 상호 불신이 팽배한 가운데 공공부문 SW사업의 완성도 및 성공률이 저조하여 낮은 품질의 정보시스템 인수 등 사업 실패율이 높아지고 있다. 본 논문에서는 이러한 문제점을 해결하고 개선하기 위해 발주${\cdot}$관리 프로세스 확립과 이에 대한 적용을 중심으로 체계적인 SW사업 발주${\cdot}$관리 프로세스 확립과 이에 대한 적용을 중심으로 체계적인 SW사업 발주${\cdot}$관리 프로세스 개선방안을 제안한다.

  • PDF

A Performance Analysis of Risk Management for International Engineering Project (해외 엔지니어링 사업의 리스크관리 성과분석)

  • Jung, Wooyong;Lee, Baul;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.99-107
    • /
    • 2017
  • In recent years, Korean engineering companies are actively entering into the international business. Although international engineering project is known to have lower risk rather that EPC construction project, Korean engineering companies' international sales profit is not as good. Therefore, this study analyzes the risks that are predicted before bid and actually occurred after award. In addition, this study shows the difference of risk depending on lump sum contract and cost reimburse contract. Finally, this study analyzes the difference of risk according to civil engineering and building engineering. This study provides industry to analyze risk more practically and helps academics to focus on risk to be studied more in the future.

Proposal for Developed Procurement and Material management System On Using Previous System Analysis in Plant Engineering (플랜트 구매조달 및 자재관리 시스템 개발 요구사항 분석을 통한 개발 방향 제시)

  • Lee, Seung-Hun;Kim, Sun-Kuk;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.204-209
    • /
    • 2006
  • Despite the recent depression of the construction industry, overseas plant market especially Middle East plant market is booming owing to the high oil price. Since many Middle Eastern countries are placing orders of big scale projects based on the high oil price, Korean EPC contractor are trying to get over the depression through theses plants. Presently, since the plant market is in prosperous condition in general, it is not hard to get overseas orders; however the original licenses that requirehigher technology and high added values are exclusive for advanced engineering companies which great difficulty is predicted for developing countries like us to join the crowd. Therefore, the objective of this study is to propose establishment of material management system on the filed to gain optimized effect of material management in connection with procurement system that all the procurement related personals execute tasks in advanced level by systemizing the task operation within the knowledge and task ability in time for plant construction procurement as a method to strengthening the competitiveness of Korean companies.

  • PDF

Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase - (해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 -)

  • Jang, Woo-Sik;Hong, Hwa-Uk;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.146-154
    • /
    • 2011
  • Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.

Development of a QR Code-based concrete strength labeling technique using embedded self-sensing monitoring (임베디드 자율감지형 모니터링을 이용하는 QR코드 기반 콘크리트 강도 라벨링 기술 개발)

  • Kim, Tae-Heon;Kim, Dong-Jin;Hong, Seok-Inn;Park, Seung-Hee
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.425-428
    • /
    • 2011
  • 국내외적으로 수주량이 증가하고 있는 대형 구조물의 건설 시 보다 정밀한 시공 및 유지관리 기술이 요구된다. 그 중 콘크리트의 강도는 대표적인 설계변수 중 하나로 정확한 강도 값의 측정 및 이력관리는 건설 프로세스에서의 비용절감과 효율적인 시공관리를 위해 매우 중요한 요구사항이다. 이에 본 논문에서는 최근 개발된 임베디드 자율감지형 콘크리트 강도 모니터링 기술을 유비쿼터스 시대에 적합한 건설 기술로의 향상을 위해 QR코드와 연동시킨 강도 라벨링을 개발하고 이를 통하여 콘크리트의 강도이력 DB를 언제 어디서나 실시간으로 확인 및 관리할 수 있는 콘크리트 Life-Cycle 품질관리 시스템을 제안한다.

  • PDF

Implementation of Status Monitoring System based on RFID in Electric Power Equipment (발전설비장치에서 RFID기반 상태관리시스템 구현)

  • Han, Gun-Hee;Hong, Jin-Keun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.9
    • /
    • pp.2379-2383
    • /
    • 2009
  • In this paper, it is reviewed implementation of information system base on RFID for management of power equipment, and the managed status items are input/out of resource, purchasing and ordering, drawing management, equipment specification, handling of operator, received order, stock control, production results, system management, and so on. the proposed paper is designed and implemented based on RFID status management system to support monitoring services of diagnosis the failure status monitoring.

A Study on the Measures to Reduce Safety Accidents during the Operation of Rope Descent System (작업의자형 달비계 작업시 안전사고 저감대책에 관한 연구)

  • Oh, Young-Taek
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.219-220
    • /
    • 2023
  • 본 논문에서는 건축물의 고층화, 대형화로 외벽 청소, 도장, 견출, 검사등 작업시 손쉽고, 빠르며 경제적으로 작업을 위한 방법으로 작업의자형 달비계를 사용 하고 있으나 최근 3년간 유지·보수공사 작업시 근로자의 중대재해가 36명으로 신축·증축·재건축공사 2명으로 유지·보수공사에서 많은 중대재해가 발생되고 있는 실정으로 50억이상 신축 작업에서는 산업안전보건법에 의하여 관리감독자 및 안전관리자가 선임 되어 현장의 전반적인 안전관리 활동을 하고 있으나 50억 이하 소규모 작업장에서는 안전관리 할동이 전무한 실정이고 저가수주, 적정 공사기간 불가 및 산업안전보건관리비 미계상 등 근로자들에 대한 안전대책이 없고 외부 안전점검기관의 사각지대로 근로자의 안전 확보에 어려움이 있은 실정으로 사업주 및 근로자에 대한 안전교육 및 관리감독이 철저히 이루어져야 할 것이다

  • PDF

A Study on Improvement Direction for Construction Environment of Small Houses -Focused on Expert Group- (소형주택의 건설 프로세스 개선방향에 관한 연구 -전문가 집단을 중심으로-)

  • Ha, Jun-Geun;Yoo, Seok-Hyung
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.7
    • /
    • pp.388-400
    • /
    • 2018
  • Small houses are continuously supplied after the alleviated housing act enacted in 2009. This study aimed to conduct a survey among an expert group associated with small house construction, propose problems by discovering difficulties and vulnerable points small and medium-sized construction companies experience while launching construction works as well as factors that impede the safety and housing environment of small houses. Furthermore, it ultimately intends to propose improvements. First, low-priced order is a major cause of unreasonable contract. Most companies were found to have low-priced orders in order to manage order performance. Low bidding and low-priced order are implemented to maintain construction businesses, ultimately threatening the safety environment of buildings. In addition, it is assumed that moderate bid periods and construction periods should be guaranteed. Second, work standardization for small and medium-sized companies is needed due to numerous cases that failed to meet order process. Additionally, regular instruction is required as many employees are not fully aware of relevant contents. Third, the most urgent policy direction turned out avoidance of low-priced bidding and removing insolvent enterprises from the market. Small and medium-sized construction companies that primarily build small houses undergo poor work condition. Therefore, the safety environment of small houses should be enhanced through work standardization and avoiding low-priced order.

Design and Implementation of Underwater Acoustic Database System (수중음향 데이터베이스 시스템 설계 및 구현)

  • 정기현;최재용;손석길;도경철;김응범
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1998.10b
    • /
    • pp.268-270
    • /
    • 1998
  • 수중에서 획득되는 대용량 데이터를 영구 보존하고 효율적으로 관리하기 위한 데이터베이스 시스템을 설계하고 구현하기 위해서는 대용량 데이터 관리, 다양한 저장장치 관리, 효율적 검색 기능, 융통성있는 데이터 타입 지원 등을 고려하여야 한다. 본 논문에서는 해상에서 획득되는 대용량 시험자료를 효율적으로 관리하기 위해 개발된 수주음향 데이터베이스 시스템에 대해서 논한다. 구축된 시스템은 각 시험별로 획득한 원시자료와 다양한 분석기법을 통하여 추출한 분석자료를 저장, 관리, 제공할 목적으로 개발되었으며, 속도를 고려한 효율적 저장방법, 보안 시험별 검색단어 변경 문제 및 분석자료의 다양한 그래픽 제공 등을 고려하여 대용량 CD-쥬크박스를 가진 유닉스 기반의 클라이언트/서버 환경에서 구현하였다.