• Title/Summary/Keyword: 수리문해

Search Result 174, Processing Time 0.027 seconds

A Study for Numeracy program Development of the elderly generation (후기성인학습자를 위한 수리문해 프로그램 개발)

  • Lee, Hyeung Ju;Ko, Ho Kyoung
    • Communications of Mathematical Education
    • /
    • v.32 no.4
    • /
    • pp.519-536
    • /
    • 2018
  • This study is intended to develop a numeracy program for late-adult learners. For this study, firstly, characteristics of numeracy were analyzed and based on those characteristics, numeracy learning contents for late-adult learners were selected. Also, teaching and learning materials were developed by linking the mathematics contents selected to experience-based real lives of late-adult learners. When this numeracy program was applied to late-adult learners, it was observed that there was a change in the affective domain like interest at the early stage of learning and that as learning continued, mathematical elaboration occurred by way of mathematical formalization. In conclusion, this study has significance by re-defining arithmetic for late-adults from a perspective of numeracy, based on experience of late-adults, and making a contribution to mathematical elaboration of late-adult learners so non-formal problem-solving processes of lat-adult learners can be justified as elaborate mathematical problem-solving.

Analysis of Hydraulic Charactistics and Evaluation of Outflow by a Small Dam Construction in the Donghwa downstream (동화천 하류부 수중보 설치에 따른 수리특성 분석 및 방류량 검토)

  • Hwang, Man-Ha;Lee, Bae-Sung;Lee, Sang-Jin;Ko, Ick-Hwan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1681-1685
    • /
    • 2006
  • 현재 한국수자원공사에서는 시화호로 유입되는 유량을 저류하여 습지내 안정적인 유량을 공급함은 물론, 정화된 하천수를 방류하여 호소내 수질을 개선하고자 동화천 하류 약 840m 지점에 제수문을 설치하여 운영중에 있다. 그러나, 폭우시 상류농경지 침수우려에 따른 제수문 개방후 폐쇄시 제수문 담수어종이 상류로 올라가는 길이 차단되어 제수문 유출부에 어류가 폐사되는 현상이 반복되어 발생하고 있다. 따라서, 한국수자원공사에서는 동화천 제수문 하류부(약 36m)에 어도를 갖춘 수중보시설을 설치함으로써 제수문과 수중보사이에 Pond를 형성하여 어류의 자연사를 방지하고자 하였다. 이에 본 연구에서는 유량규모 및 수문개방 조건에 따른 보 설치 전 후 상황에 대한 1차원 수리특성분석을 실시함으로써, 보 설치로 인해 제수문 상류지역에 배수불량 상황 발생여부를 검토하고, 이를 배제하기 위한 제수문 개방조작 변경안을 제시하였다. 본 연구를 통해 제수문 하류단의 설치예정인 수중보가 제수문 상류지역의 배수상황에 미치는 영향은 제수문 상류 유입량이 저유량 구간인 $3.92cms{\sim}8.88cms$에서 발생하였으며, 이는 본 연구에서 제시한 개방수문 조작 변경안과 같이 간단한 수문조작을 통해 상류 수위를 저감시킬 수 있는 것으로 조사되었다.

  • PDF

경수로핵연료 수리기술의 현황과 개발방향

  • 김형규;서정미
    • Nuclear Engineering and Technology
    • /
    • v.25 no.2
    • /
    • pp.285-291
    • /
    • 1993
  • 국내 기술로 설계, 제조된 경수로핵연료가 고리 2호기를 시작으로 국내 8기의 경수로형원자력발전소에서 사용되어 경수로핵연료의 국내 기술수준을 향상시킬 수 있게 되었으나 운전중 결함이 발생된 핵연료를 재사용가능케 함으로써 핵연료비를 절감할 수 있는 핵연료수리기술분야의 연구개발은 상대적으로 매우 뒤져 있는 실정이다. 따라서 본 기고문에서는 외국의 핵연료수리기술들과 국내 원자력발전소에서 운전중 발생한 결함핵연료의 수리현황을 정리하여 향후 국내에서 수행할 핵연료수리기술의 연구에 도움이 되고자 하였다.

  • PDF

보증기간이 있는 시스템의 교체정책

  • 정기문;권영섭
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2001.11a
    • /
    • pp.125-130
    • /
    • 2001
  • 본 논문에서는 혼합보증기간이 있는 수리 가능한 시스템에 대한 최적의 교체정책을 제안한다. 이 교체정책은 보증기간이 재생되는 경우와 재생되지 않는 두 가지 경우에 대해서 고려되며, 최적의 교체주기를 결정하기 위해서 사용자 관점에서의 단위 시간당 기대비용을 사용한다. 시스템의 고장시간이 와이블 분포를 할 때 수치적 예를 통해서 제안된 최적의 교체정책을 설명한다.

  • PDF

A Study on the Effect of Rivet Layout on the Stress Variation in Doubler Repair (보강재 수리시 리벳 배열이 응력 변화에 미치는 영향 연구)

  • Moon, Ju-Yeon;Shin, Ki-Su
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.1
    • /
    • pp.91-102
    • /
    • 2010
  • Doubler repair is one of the frequently applied methods to repair cracks which occur at the structure of aircraft weapon systems. The requirement of the doubler repair for some of aging aircraft has increased more recently. However very few researches have been conducted until now. In this paper, the effect of the various doubler repair methods was evaluated. Especially, the relationship between the array of revet and the effect of stress concentration was investigated. To calculate variation of the stress with different repair methods, commercial FEA program was utilized. As a result, it was shown that the main factor for the variation of stress is pitch and number of revet line. Furthermore the optimized array of revet for the specific geometries of doubler was suggested.

Proposing the Revision of Ondol Construction in the Standard Specification for Heritage Repair (문화재수리표준시방서의 온돌공사 개정 제안에 관한 연구)

  • Lim, Jun-Gu;Kim, Young-Jae
    • Journal of architectural history
    • /
    • v.32 no.5
    • /
    • pp.43-50
    • /
    • 2023
  • Ondol is a traditional underfloor heating system designated as a national intangible cultural heritage of Korea. The Cultural Heritage Administration (CHA) publishes a standard specification for the repair of cultural properties, including ondol. This standard specification is used as a guide for contractors who repair ondol in the field. However, the standard specification for ondol repair has some errors and is difficult to understand in the field. This paper proposes a revision of the standard specification for ondol repair. This study found that the standard specification for ondol repair has some problems in terms of the terminology and structure of ondol. These problems were sufficient to confuse ondol repairers in the field. Therefore, this study proposes to revise the standard specification to correct these errors and make it easier for ondol repairers in the field to understand. This study is expected to help recognize and preserve ondol as a cultural property and not just as a building.

교체정책에 대향 베이지안 접근법

  • Jeong, Gi-Mun
    • 한국데이터정보과학회:학술대회논문집
    • /
    • 2006.04a
    • /
    • pp.319-326
    • /
    • 2006
  • 본 논문에서는 최소수리를 갖는 수리가 가능한 시스템의 최적의 교체정책에 대한 베이즈 접급방법을 제안하였다. 특히, 시스템을 운용하는데 필연적으로 발생하는 비용과 비가동시간을 함께 고려하여 기존의 비용에 근거한 연구결과를 확장하고자 하였다. 이를 위해서 단위시간당 기대비용과 단위시간당 기대비가동시간을 구하고, 이 두 기준을 동시에 고려한 최적의 교체주기를 결정하는 방법을 제시하였다. 또한, 순응적 교체정책에 대해서도 살펴보았다.

  • PDF

Preventive Maintenance Model after Minimal Repair Warranty (최소수리보증 이후의 예방보전모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.6
    • /
    • pp.865-877
    • /
    • 2010
  • This paper considers the periodic preventive maintenance model for a repairable system following warranty expiration. We consider three types of warranty policies: free repair warranty, pro-rata repair warranty, and combination repair warranty. Under these preventive maintenance models, we derive the expressions for the expected cycle length, the total expected cost, and the expected cost rate per unit time. In addition, we explain the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for a Weibull distribution case.

Experimental Study on the Inflow and Outflow Structures of Hwasun Flood Control Reservoir (화순 홍수조절지의 유입유출 구조물에 대한 수리모형실험 연구)

  • Lee, Sang-Hwa;Jin, Kwang-Ho;Ryu, Jong-Hyun;Kim, Soo-Geun
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.7
    • /
    • pp.675-684
    • /
    • 2012
  • Recently, a heavy rainfall under climate change causes the flood exceeded river's conveyance. Flood control methods under the limited river width are the increase of embankment, the construction of storage pockets and diversion channel, the dredging of river bed. Hwasun flood control reservoir of washland is designed as the storage pockets and the regulating gate for the control of water level. In this study, the propriety of design was investigated through hydraulic experiments for the circumstances to exclude the constant flood discharge during operation period. In the results, the over flow rate of side weir exceeded the flow of design and indicated to be able to discharge the designed flow in the regulating gate opened 1.1 m. The high velocity 7.1 m/s behind the gate has investigated to reduce under 3.3 m/s by the baffle block.

Replacement Model Following the Expiration of Free RRNMW (무료 재생교체-비재생수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.6
    • /
    • pp.697-705
    • /
    • 2011
  • This paper proposes an optimal replacement policy following the expiration of a free renewing replacement-non-renewing minimal repair warranty. To do so, the free renewing replacement-non-renewing minimal repair warranty is defined and then the maintenance model following the expiration of free renewing replacement-non-renewing minimal repair warranty from the user's point of view is studied. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. We derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purposes.