• Title/Summary/Keyword: 수도권도시철도

Search Result 74, Processing Time 0.026 seconds

A study on the improved headway calculating method in the metropolitan railway system (광역철도 운행시격 산정방법의 문제점 및 개선방안에 관한 연구)

  • Park, Chul-Ho;Kim, Byoung-Seop;No, Sun-Hwa;Jang, Seong Yong
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.921-932
    • /
    • 2010
  • Metropolitan railway headway is calculated and decided by external conditions such as appropriate level of service and competitiveness rather than passenger demand for the peak time which is based on transport passenger capability of train. On contrast of inter-city urban railways, train time intervals of sub-urban metropolitan railway were fixed more than 20 mins in the peak time which results in low level of convenience. Big gap of headway brings a vicious circle of deteriorating competitiveness and decreasing the number of customers. Also this time gap of train interval results in stagnation of passenger demand, and makes it difficult to reduce headway. This thesis is a basic research to identify headway problems and their solutions of metropolitan railway. This thesis suggests passenger demand and the calculated standard for setting the headway, and reviews the level of passenger crowdedness, the numbers of coach for each train and time-competitiveness. At the last, thesis suggests the need for making headway by means of train services throughout benefit & cost analysis. And it also recommends the improved calculating method of setting up headway considering the different train headway standards by regional situation, flexibility in the number of coaches for a train, government policy to activate railway business and the need for setting up the standard for train service level.

  • PDF

The impacts of high speed train on the regional economy of Korea (고속철도(KTX) 개통이 지역경제에 미치는 영향 분석과 시사점)

  • Park, Mi Suk;Kim, Yongku
    • The Korean Journal of Applied Statistics
    • /
    • v.29 no.1
    • /
    • pp.13-25
    • /
    • 2016
  • High-speed railway (Korea Train Express) has had a deep impact on the regional economy of Korea. Current high-speed rail research is mostly theoretical, there is a lack of quantitative research using a precise algorithm to study the effect of high-speed railway on the regional economy. This paper analyses the influence of high-speed rail on the regional economy, with a focus on the Daegu area. Quantitative analysis using department store indexes and regional medical records is performed to calculate the economic influence of high-speed rail. The result shows that high-speed railway effects the regional economy though regional consumption growth and medical care trends.

A study on system improvement to utilization of underground space for the right complementary - Focused on land of exceeding the depth limit - (지하공간 활용의 권리보완을 위한 제도적 개선에 관한 연구 - 한계심도 초과 토지를 중심으로 -)

  • Seo, Yong-Su;Choi, Seung-Young
    • Journal of Cadastre & Land InformatiX
    • /
    • v.44 no.1
    • /
    • pp.97-111
    • /
    • 2014
  • As urbanization and industrialization develops, the necessity of utilizing scarce land in three dimensions is raising. The issue of utilizing underground space is being actively discussed particularly when Geyeonggi-do announced GTX(Great Train Express) construction plan which aims to relieve traffic congestion in metropolitan areas. The current regulation on compensation of underground space is based on "Regulations on compensation standard complied by using underground space for construction of urban railway" but it is difficult for covering the whole rights to protect a three-dimensional right. In this context, the study is to propose the improvement plans of land right's problem and compensation issues to utilization of underground space for the right complementary. To do this, the study reviews the use situation of the classification surface right and using adjudication which defines the effect scope of underground space extending land ownership. As well as it analyzes issues about compensation standard for utilizing of underground space.

Study of Revitalizing of Daegu International Airport (대구국제공항 활성화 방안에 관한 연구)

  • Hong, Seok-Jin;Jeong, Ung-Gi;Song, Sang-Hwa;Seo, Jeong-Uk
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.6 s.92
    • /
    • pp.7-19
    • /
    • 2006
  • Due to the continuous expansion of the highway, the opening of the high-speed railway(KTX), etc, the demands of domestic air transport decreasing. In the circumstances, airports and local governments are spending themselves in taking a measure to activate local airports. In this aspect, this study seeks the smooth flow of human movement through the activation of Daegu International Airport by analyzing the present condition of Daegu International Airport in relation to the appearance of the high-speed railway, deducing plans for activating airports, and presenting the roadmaps for long-, mid- and short-term roles for the development of Daegu Airport, and Presents substantial fulfilling plans to secure the competitive power of Daegu International Airport by speeding up the flow of air goods of the area for the long run. It is suggested in the study that by setting up an organization exclusively responsible for activating Daegu International Airport in the city of Daegu, supporting local travel agencies to promote consistent demands, supporting aviation companies to employ Daegu International Airport as a major air base, establishing airlines with priority for airports that open newly in local cities of Japan and establishing and expanding airlines in China areas be promoted actively. Ministry of Construction & Transportation makes it a means of main airport Policy to only support Incheon International Airport to be a hub. However not only Incheon International Airport should be an amok representing the country, but also the wide Metropolitan area should supply the demands, and airports based in the West and East Coast areas need to be developed in the future. It is suggested that since air demands of domestic local airports are based on the demands of the of gin destination in neighboring region, multiple bases need to be developed. It is suggested that by developing not 1 in mega hub (Incheon International Airport) but 1 in mega hub. 2 in regional hub (the West and East Coast) and Jeju foy the tourism hub in our developing airports system.

A Study on the Change of Urban Land Use According to the Change of Transportation Accessibility (교통 접근성 변동에 따른 도시 토지이용 변화에 관한 연구)

  • Won, Seok Hwan;Hwang, Chul-sue
    • Journal of Cadastre & Land InformatiX
    • /
    • v.47 no.1
    • /
    • pp.127-142
    • /
    • 2017
  • The purpose of this study is to examine the status of urbanization of Namyangju-Si from 2001 till 2008, analyze the correlation of the change of surrounding land use according to the change of accessibility and analyze the correlation of the change of land use. Based on the result from correlation analysis, I simulated from the view point of interactions between agents of land use and transportation accessibility by using MAS. I tried to forecast, based on space, the change of surrounding land use caused by the change of accessibility. I conducted landscape analysis by using a land registration map. Also, I conducted GIS analysis statistical analysis simulation analysis of traffic data, land use data in order to analyze the correlation of the change of surrounding land use according to the change of accessibility. I could find out a certain pattern that new roads and railroads causes the within 500m adjacent land to change into urban land use, which led me to construct a system through which land use changing phenomenon can be expected according to the change of accessibility. It is expected that it can make the best use of selecting the location where new transportation facilities are constructed.

Conceptual Design of Safety Step System in Urban Railway Platforms (도시철도 승강장 안전발판 시스템 개념설계)

  • Park, Min-Heung;Kwak, Hee-Man;Kim, Min-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.2559-2566
    • /
    • 2014
  • Recently, safety accident by misstep at the gap between the platform and railway vehicle have frequently occurred to the mobility handicapped including disabled person, children etc. in metropolitan subway region. Particularly, because the curved platform's gap from platform to railway vehicle is max. 260mm it is important to securement of the passenger's safe mobility right. So it is necessary to platform safety step equipment for needs technology to interface gap between the platform and railway vehicle. In this study we examined the function & production requirements of platform safety step and performed the conceptual design considering the crash safety and maintenance easiness. Moreover, considering various performance requirements we suggested step's operation procedure & control flowchart.

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

Nonlinear Seismic Performance Evaluation of an Operating TBM(Tunnel Boring Machine) Tunnel (공용 중인 TBM(Tunnel Boring Machine) 터널의 비선형 내진성능 평가 )

  • Byoung-Il Choi;Dong-Ha Lee;Jin-Woo Jung;Si-Hyun Park
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.5
    • /
    • pp.1-9
    • /
    • 2024
  • Recently, the TBM tunnel construction method has been in the spotlight as tunnel excavation under urban areas such as the Metropolitan Rapid Transit (GTX) has been actively carried out. Although the construction cost of the TBM tunnel is high, it is relatively free from noise and vibration compared to the NATM tunnel method, so it is well known to be a suitable construction method for application to the lower part of urban areas. In particular, when the stratum passes through the shallow section, it can have a great impact on existing upper structures and obstacles, so accurate numerical analysis considering various variables is required when designing the TBM tunnel. Unlike other tunnel construction methods, TBM tunnels build linings by assembling factory-made segments. Unlike NATM tunnels, segment lining has connections between segments, so how to the connection status between segments is reflected can have a significant impact on securing the reliability of analysis results. Therefore, in this paper, a segment joint model(Janssen Model) was applied to the lining for seismic analysis of the TBM tunnel, and the tunnel's behavioral characteristics were analyzed after numerical analysis using nonlinear models according to urban railway seismic design standards.

A Multi-Objective Shortest Paths Finding Considering Multi-Class in A Multi-Modal Transit Network for Providing User-Customized Route Information (사용자 맞춤형 대중교통 경로정보제공을 위한 다계층의 다목적 경로탐색기법 연구)

  • Lee, Mee-Young;Park, Je-Jin;Jeong, Jeom-Rae;Park, Dong-Joo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2008
  • Mass transit information should contribute many benefits to users. Especially transportation information technology is developing highly with information technology in Korea recently. Hereafter it is expected to provide customized transportation information to users individually with the advent of ubiquitous age in earnest. This public transportation information service can be realized by path finding algorithms in public transportation networks including travel and transfer attributes. In this research, multi objectives such as travel time, transfer time, and number of transfer and so on are constructed with the primary facts influencing users. Moreover, the method reducing user's path finding alternatives arbitrarily is proposed by selecting the best alternative which provides maximum utility to users among non dominated paths. Therefore, the ultimate goal of this study proposes a multi objective shortest paths finding algorithm which can take into account multiple user classes in a transit network with multiple travel modes. The proposed algorithm is demonstrated based on the two case studies - a small toy network and the large-scaled Seoul Metropolitan subway network.

  • PDF

Analysis of User Satisfaction by Types of Subway Platforms and Transit Stations (지하철 승강장 및 환승정거장 유형에 따른 이용자 만족도 분석)

  • Kim, Hwang Bae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.437-445
    • /
    • 2015
  • The layout of facilities, in relation to information and navigational displays, has great influence on subway satisfaction, and tend to vary depending on the types of subway platform and transit station. However, until now, few studies have covered such aspects as of yet. Starting from this viewpoint, the purpose of this study was to use an IPA analysis technique to analyze that satisfaction on the importance of facilities to aid in accessibility, such as elevators and escalators, transit amenities and information and navigational displays depending on the types of platform and transit station. To do so, we've classified 15 metropolitan stations according to types of platform and transit station and analyzed differences in user importance and satisfaction as well as improvements for platforms and transit stations of similar type. By the analysis results of this study, we've concluded that the proper selection and positioning of elevator and escalator facilities and information and navigational displays was important when designing the subway station according to platform type (separate platform) and or according to the transit station type (cross, L, T types) where pedestrian flow heavily intersected. We considered that such analysis results would be helpful in the design of new stations and the enhancement of existing stations pursuant to a new direction that minimizes user inconvenience, and that improvement items should be developed first according to the platform and transit station types, which would be helpful in enhancing the efficiency of the subway improvement cost.