• Title/Summary/Keyword: 성토사면

Search Result 105, Processing Time 0.027 seconds

Evaluation of Lateral Flow in Soft Ground under Embankment (성토하부 연약지반의 측방유동 평가)

  • Hong, Won-Pyo;Cho, Sam-Deok;Lee, Jae-Ho;Lee, Kwang-Wu
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.10
    • /
    • pp.93-100
    • /
    • 2006
  • The lateral soil movement in soft grounds undergoing improvement with application of vertical drains is analyzed on the basis of monitoring data at three fields, in which fifty six monitoring sites are located. Based on the investigations, the criterions are suggested to predict the lateral soil movement. In order to predict the lateral soil movement in the improved soft grounds by using the dimensionless parameter R suggested by Marche & Chapuis (1974), it is desirable that the maximum lateral displacement in the soft ground below the toe of embankment should be applied to calculate R instead of the lateral displacement at the toe of embankment. The lateral soil movement may increase rapidly, if the safety factor of slope is less than 1.4 in case of high ratio of H/B (Thickness of soft ground/Embankment width) such as 1.15 or is less than 1.2 in case of low ratio of H/B such as 0.05. Also, the graph suggested by Tschebotarioff (1973), which illustrates the relationship between the maximum height of embankments and the undrained shear strength of soft grounds, can be applied to the evaluation for the possibility of the lateral soil movement due to embankments on soft grounds.

Coupled Finite Element Analysis of Partially Saturated Soil Slope Stability (유한요소 연계해석을 이용한 불포화 토사사면 안전성 평가)

  • Kim, Jae-Hong;Lim, Jae-Seong;Park, Seong-Wan
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.4
    • /
    • pp.35-45
    • /
    • 2014
  • Limit equilibrium methods of slope stability analysis have been widely adopted mainly due to their simplicity and applicability. However, the conventional methods may not give reliable and convincing results for various geological conditions such as nonhomogeneous and anisotropic soils. Also, they do not take into account soil slope history nor the initial state of stress, for example excavation or fill placement. In contrast to the limit equilibrium analysis, the analysis of deformation and stress distribution by finite element method can deal with the complex loading sequence and the growth of inelastic zone with time. This paper proposes a technique to determine the critical slip surface as well as to calculate the factor of safety for shallow failure on partially saturated soil slope. Based on the effective stress field in finite element analysis, all stresses are estimated at each Gaussian point of elements. The search strategy for a noncircular critical slip surface along weak points is appropriate for rainfall-induced shallow slope failure. The change of unit weight by seepage force has an effect on the horizontal and vertical displacements on the soil slope. The Drucker-Prager failure criterion was adopted for stress-strain relation to calculate coupling hydraulic and mechanical behavior of the partially saturated soil slope.

Analysis of the Correlation between the velocity speed of High-Speed Railways and the Suppressing Effect of lateral Displacement of retaining wall according to the Arrangement of Stabilizing Piles (억지말뚝의 배치에 따른 흙막이의 수평변위 억제효과와 고속철도의 속도와의 상관성 분석)

  • Son, Su-Won;Im, Jong-Chul;Seo, Min-Su;Hong, Seok-Woo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2021
  • In urban areas, structures are installed deep underground in the lower part of the structure to utilize space. Therefore, a retaining wall is used to prevent earth pressure from the ground when constructing a structure. Due to the development of construction technology, retaining wall applied to excavation work are used to prevent danger such as falling rocks and landslides in temporary facilities when construction or retaining walls are installed. In general, the application of a retaining wall to a temporary facility during the embankment construction is the case of expanding an existing roads or railways. Therefore, it is necessary to study the retaining wall applied to the embankment construction such as the double-track site of the high-speed railway. In this study, two types of common one row H-pile retaining wall and two types of IER retaining wall were analyzed, and the stability of the retaining wall applied to the construction of double-track of the high-speed railway was analyzed. The earth retaining wall is a construction method that combines forced pile applied to the stabilization of the slope with the wall of the earth retaining wall. As a result of the analysis, the IER retaining wall had maximum lateral displacement of 19.0% compared to the type with H-plie installed only in the front while dynamic load was applied. In addition, the slower the speed of high-speed railway, the more displacement occurred, and the results show that more caution is needed when designing the ground in low-speed sections.

A Study on the rail-transport operation control for railway embankment under rainfall (강우시 철도성토사면의 열차운전규제기준에 관한 연구)

  • 김현기;박영곤;신민호;김수삼
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.514-519
    • /
    • 2001
  • There are a close relationship between natural disasters and train safety. So it is very important to guaranty train safety using reasonable rail-transport operation control against disasters. Therefore, based on the past record of rainfall at failure, rail-transport operation control for railway embankment under rainfall was set up. After slope check list at home and abroad had been analyzed, new slope check list was suggested and site investigations were carried out using this check list. In order to evaluate the stability of railway slopes under rainfall, explanatory variables and subordinate variables were selected for multi-variate analysis and critical rainfall was defined by statistical process. Rail-transport operation control including regional and geological properties was suggested by analyzing the critical rainfall and rail-transport operation control in other country, and this will be a good tool to control train speed under rainfall and to secure train safety.

  • PDF

A Study on the Potential Vegetation Recovery according to the Environment and Type of Tunnel Entrance and Exit (고속도로 터널 입·출구부 유형과 주변 환경에 따른 식생복구 잠재성에 관한 연구)

  • Lee, Sang-Cheol;Choi, Song-Hyun;Kim, Dong-Pil;Song, Jae-Tak;Oh, Hyun-Kyung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.6
    • /
    • pp.161-172
    • /
    • 2012
  • The purpose of this study is to classify, evaluate and grade the existing highway tunnels to increase landscape and natural statistics keeping the structural safety about tunnel gates area and induce the ones that will be constructed in the future by drawing the improvements and restoring the techniques as an environment-friendly. To examine the types of tunnel gate area, total 54 tunnels were investigated by selecting Gyeongbu Expressway, Yeongdong Expressway, and Jungang Expressway. Tunnel entrances and exit ports were classified as a Wall-closed type and Protruding type, which is based on tunnel gate type. Vegetation Landscape types were classified as Multilayer-Same as the surrounding landscape_(MS), Multilayer-Difference of surrounding landscape_(MD), Single layer-Same as the surrounding landscape_(SS), Single layer-Difference of surrounding landscape_(SD), and a Desolate type which based on vegetation layers and environment-friendly. Potential vegetation recovery was identified based on the structural stability and revegetation potential of the tunnel. The factors include the structural stability of the slope height and slope gradient were selected. Revegetation potential was identified as a growth potential. This factor was used in the step to classify vegetation recovery potential of a tunnel. The result, which investigated the types of tunnel entrances and exit parts has found that the most typical in 33 places was a Wall closed type with 61.1% of the total ones. The case of vegetation landscape types was created but different from the ones surrounding it with 85.2% of the total ones. It is judged that the currently constructed vegetation of tunnel entrance and exit parts had put convenience on the safety and management before landscape consideration. In addition, tunnel entrance and exit parts with excellent potential for vegetation recovery were all Protruding type. In addition, it is judged that slope stability can easily obtain growth. Therefore, entrance and exist of the highway tunnels, which will be constructed in the future, should reflect location and the result of the natural and ecological survey in design by performing it in advance and their types, which minimize the damage area range, should be applied to the local characteristics suitably. In addition, the ecologically healthy tunnel construction should be done by introducing active vegetation recovery techniques based on its safety.

Shear Strength of Weathered Granite Soil Considering Change of Saturation (포화도 변화를 고려한 화강풍화토의 전단강도)

  • Kim, Minwook;Kim, Youngmuk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.9
    • /
    • pp.5-14
    • /
    • 2010
  • This study was aimed to suggest reliable information of shear strength characteristics due to change of saturation in the landfills or slopes during rainfall infiltration. According to the Mohr-Coulomb failure criteria, the characteristics of shear strength due to change of saturation were analyzed for the weathered residual soils which were sampled in the road construction site of Daejeon city. From the direct shear strength tests, the cohesions and the shear resistance angles were showed maximum values in the condition of optimum moisture content, and then decreased in the condition of wet side compaction. In this study, the cohesions were decreased more than 50% according to increasing saturation by infiltration for the compaction soils. But the reductions of the shear resistance angles were about $1{\sim}2^{\circ}$ which was small value, and thus the changes of the saturation were not nearly influenced the shear resistance angle. The influences of the saturation were seemed to very small for the residual strength parameters according to Mohr-Coulomb failure criteria.

Verification of the Seismic Performance Evaluation Methods for Enclosure Dam (기존 방조제의 내진성능평가 방법 검증)

  • Kim, Kwangjoon;Kim, Hyunguk;Kim, Sung-Ryul;Lee, Jinsun
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.5
    • /
    • pp.19-33
    • /
    • 2022
  • Newmark's sliding block analysis is the most commonly used method for predicting earthquake-induced permanent displacement of embankment slopes. Additionally, it yields the amount of slip circle sliding using the limit equilibrium theory. Thus, permanent displacement does not occur until the seismic load exceeds the yield acceleration, which induces sliding of the slip circle. The evolution of Newmark's sliding block analysis has been made by introducing the numerical seismic response analysis results since it was introduced. This study compares seismic performance evaluation results for the example enclosure dam section with the analysis methods. As a result, earthquake-induced permanent displacement using Newmark's sliding block analysis did not occur for the enclosure dam, indicating a high safety factor. However, nonlinear response history analysis gave reasonable results.

A Study on the Stability of Embankment Due to the Construction of Embankment Combined Use Road (제방겸용도로 건설에 따른 제방 안정성 해석에 관한 연구)

  • Kim, Sung-Nam;Lee, Young-Woo
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.109-118
    • /
    • 2008
  • This study analyzes the change of stability of embankment due to the construction of embankment combined used road with two different construction phases. The stabilities have been checked both in the phase of earth banking for a road construction and in the phase of the application of the traffic roads(DB-24). In both cases the factor of safety has been found higher than 1.3 which is the general criterion of the safety of an embankment. The results indicate that the safety of an embankment due to the construction of embankment combined use road is assured, and thus, it is thought that the construction of embankment combined use road can be considered for cutting down on expenses of construction sites for a road construction. However, the pre-examination of stability due to the construction should be carried out because it decreases the factor of safety of an embankment. From this study, it has been found that the factor of safety was dropped most when the water level rose in the transient flow. The result indicates that the stability analysis of a river embankment where the water level changes frequently should be carried out in the condition of transient flow. It is recommended that the inner side of an embankment should have a slope of 1:2 which is identical with the slope of the existing embankment. In addition, the factor of safety also can be decreased due to the traffic loads, and therefore, the effect should also be considered after the construction of embankment combined used road limiting the traffic loads.

  • PDF

Seismic analysis and dynamic behavior characterization of rib-reinforced pre-cast tunnels (리브 보강 프리캐스트 터널의 내진 해석 및 동적거동 특성 파악)

  • Song, Ki-Il;Jung, Sung-Hoon;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.287-301
    • /
    • 2009
  • The novel cut-and-cover tunnel construction method using rib-reinforced pre-cast arch segments has been recently developed and applied for practice to secure a structural stability of high covering and wide width section tunnels. Cut-and-cover tunnels are usually damaged by the seismic behavior of backfill grounds in case of a low covering condition. Seismic analyses are performed in this study to characterize the dynamic behavior of rib-reinforced pre-cast arch cut-and-cover tunnels. Seismic analyzes for 2 lane cast-in-place and rib-reinforced pre-cast arch cut-and-cover tunnels are carried out by using the commercial FDM program (FLAC2D) considering various field conditions such as the covering height embankment slope and excavation slope. It can be concluded that the amplification of seismic wave is reduced due to an increase in the structural stiffness induced by rib-reinforcement. The results show that the rib-reinforced pre-cast arch cut-and-cover tunnels are more effective against the seismic loading, compared to the cast-in-place cut-and-cover tunnels.

Variations of Soil Bulk Density and Natural Revegetation on the Logging Road of Timber Harvested-Sites (벌채적지(伐採跡地) 운재로(運材路)의 토양가밀도(土壤假密度) 변화(變化)와 자연식생회복(自然植生回復)에 관한 연구(硏究))

  • Woo, Bo-Myeong;Park, Jae-Hyeon;Kim, Kyung-Hoon
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.4
    • /
    • pp.545-555
    • /
    • 1994
  • The objective of the study was to provide the useful scientific data on the early rehabilitation of the legging road after timber harvesting in the forest area. This study was carried out at logging roads which were constructed during 1989 and 1994 in Mt. Baekwoon. The field survey was conducted in July, 1991. Judging from the analysis of soil bulk density, time required for recovery as the undisturbed forest soil condition was more than 10 years in the road which was left, and the regression equation is as follows, $$Y_1=1.4195-0.0744{\cdot}X(R^2=0.91)$$ $$Y_2=1.4673-0.0688{\cdot}X(R^2=0.73)$$ (X : elapsed year after road construction. $Y_1$, $Y_2$ : soil bulk density($g/cm^3$) at 0~7.5cm, and 7.5~15.0cm, respectively) Especially soil bulk density with buffer strip-woods was $0.890-0.903g/cm^3$, so it was 20% lower than that of logging road surface without buffer strip-woods. Among the 7 factors, location, sand content, and soil hardness had statistically significant effect on the soil bulk density in logging road surface. The pioneer species on logging road surface were Rhus cratargifolius, Prunus chinensis, and Lespedeza cyrtobotrya, etc. in woody species, and Pteridium aquilinum, Arundinella hirta, and Lysimachia clethroides, etc. in herb species. So, in process of year, average plant coverage were 70% on cutting and banking slope and 20% on logging road surface which elapsed 6 years after logging road construction. Through this research, buffer strip-woods must be remained for environmental conservation of forest conditions, and from the time to be closed the road, planting, seeding, and grazing works could be effective to the soil condition and vegetation recovery.

  • PDF