• Title/Summary/Keyword: 성과측정 및 관리

Search Result 631, Processing Time 0.033 seconds

A Performance Evaluation Framework for e-Clinical Data Management (임상시험 전자자료 관리를 위한 평가 프레임웍)

  • Lee, Hyun-Ju
    • Journal of Internet Computing and Services
    • /
    • v.13 no.1
    • /
    • pp.45-55
    • /
    • 2012
  • Electronic data management is getting important to reduce overall cost and run-time of clinical data management with the enhancement of data quality. It also critically needs to meet regulated guidelines for the overall quality and safety of electronic clinical trials. The purpose of this paper is to develop the performance evaluation framework in electronic clinical data management. Four key metrics in the area of infrastructure, intellectual preparation, study implementation and study completion covering major aspects of clinical trial processes are proposed. The performance measures evaluate the extent of regulation compliance, data quality, cost and efficiency of electronic data management process. They also provide measurement indicators for each evaluation items. Based on the key metrics, the performance evaluation framework is developed in three major areas involved in clinical data management - clinical site, monitoring and data coordinating center. As of the initial attempt how to evaluate the extent of electronic data management in clinical trials by Delphi survey, further empirical studies are planned and recommended.

The Effects of Performance Management & Application Capabilities and Activities on Technology Transfer from Public Research Institutes in Korea (공공연구기관의 성과관리.활용 역량 및 활동이 기술이전 성과에 미치는 영향)

  • Chung, Do-Bum;Jung, Dong-Duk
    • Journal of Technology Innovation
    • /
    • v.21 no.2
    • /
    • pp.199-223
    • /
    • 2013
  • Recently, R&D policy has importantly emphasized the creation of economic values added through the research performance developed by public research institutes. However, the research performance hasn't been still used and diffused effectively in Korea (Republic of Korea). This empirical study analyzes the effects of performance management & application capabilities and activities on technology transfer from public research institutes in Korea. Our dataset consists of total 84 Korean universities and government-funded research institutes in 2011. Performance management & application capabilities include dedicated organization, researcher-to-professional ratio, technology transfer and commercialization budget, and performance management & application activities include regular conduct of 3P analysis, pre-adjustment, post-management. The results show that performance management & application capabilities (except researcher-to-professional ratio) and activities are positively related to technology transfer. The results of this study contribute to the establishment of R&D policy to promote management & application of the research performance.

  • PDF

Construction Project Performance Management Using BSC and Data Warehouse (BSC를 활용한 Data Warehouse 기반의 건설 프로젝트 성과관리)

  • Park, Moon-Seo;Kim, Nam-Ho;Lee, Hyun-Soo;Ahn, Chang-Bum;Lee, Kyu-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.14-25
    • /
    • 2009
  • Many companies have managed their business performance in order to achieve their enterprise purpose. Performance management which applied concept of BSC (Balanced Scorecard) is widely used all over the world. In the construction industry, BSC-based performance management is currently introduced with needs of balanced performance evaluation. However, most companies actually have intermediate level of adapting BSC. It is important to understand its process or and structure. Therefore, this paper is focused on making performance management process and defining each phase of it. In addition, the model and system are established with putting them together. With developing performance process in construction, the construction companies are supposed to detect the deficiencies of the current performance management systems and take some opportunity to be helped for supporting their decision-making. In conclusion, this paper will provide the construction industry with the opportunities to enhance the values of performance management system and construction application.

A IT Service Management Performance Model Based on Val IT for IT Governance (IT 거버넌스를 위한 Val IT 기반의 IT 서비스 관리 성과지표 모델)

  • Choi, Yun-Ho
    • Annual Conference of KIPS
    • /
    • 2012.11a
    • /
    • pp.1724-1727
    • /
    • 2012
  • 기업들은 ITIL 기반의 IT 서비스 관리체계 도입으로 IT 서비스에 대한 객관적인 가치 평가를 기대하고 도입한다. 하지만 기업들의 IT 서비스 관리체계의 성과지표들은 관리 중심적인 성과모델로써 가치 평가보다는 IT 운영 관리 중심으로 활용되고 있으며, IT 거버넌스의 전략적 의사결정을 위한 가치 연계와 책임 추적성, 성과 측정 및 위험 관리를 지원하지 못하고 있다. 가치 중심의 성과지표 모델을 통해 IT 거버넌스를 지원하고, 기업의 지속적이고 체계적인 투자관리를 통해 기업 가치 향상과 투명한 IT 투자에 기여하길 기대한다.

The Role of justice and organizational citizenship behaviour in the relation between measurement diversity and managerial performance (성과지표의 다양성과 관리적 성과 간의 관계에서 공정성과 조직시민행동의 역할)

  • Lee, Sang-Wan;Cho, Yong-Eon;Lee, Kyu-Sub
    • Journal of Digital Convergence
    • /
    • v.11 no.11
    • /
    • pp.219-231
    • /
    • 2013
  • Many companies are adopting performance measurement systems(PMS) in order to acquire competitive advantage the promote long-term growth in Coping with the rapidly changing business environment. Prior research has focused on the relation between PMS and organizational performance. However, there is limited empirical research that examines the behavioural consequences of PMS. Further, there is little empirical research that examines whether measurement diversity have direct and/or indirect effects on work performance. As such, I examine how the relation between measurement diversity and managerial performance can be explained by the intervening variables of justice and organizational citizenship behaviour. This study is summarized as follows: this study finds that measurement diversity affect managerial performance indirectly through justice and organizational citizenship behaviour.

A Management Performance Measurement Model of the Construction Engineering Firm -Focused on 'H' Construction Engineering Firm- (건설엔지니어링 기업의 경영성과측정모형 -H사의 사례를 중심으로-)

  • Park Chan-Sik;Kim Hyun-Jun;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.202-210
    • /
    • 2004
  • Under the current competitive business environment, the complexity of procurement method, and the lack of engineering capacity in the construction engineering industry, a construction engineering firms require the business strategy and its performance measurement system. This study suggests a performance measurement model that could follow 'H' construction engineering firm's vision and strategy. The model utilizes the concept of Balanced Scorecard. The study proposes the four main performance perspectives such as financial, growth, internal efficiency, and improvement & learning through the long-term strategy analysis, SWOT analysis, and interviews of the employees. Also the study develops the critical success factor and the key performance indicators. The usefulness of the performance measurement model is validated through the gap analysis such as alignment analysis and consensus analysis.

Development of System for Increasing Confidence on the Measurement of Discharge (PDA 활용 유량측정 신뢰도 향상 시스템 개발)

  • Jung Seung Kwon;Kim Nam Il;Kim Jae Bog;Park Jae Young
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.209-214
    • /
    • 2005
  • 수위, 우량, 유량, 유사량 등 수문자료중에서 유량자료는 가장 많은 쓰임새를 갖고 있음에도 불구하고 신뢰도가 낮은 이유로 인해 많은 문제점을 안고 있는 것이 현실이다. 이렇게 유량측정자료의 신뢰도가 낮은 이유는 크게 5가지로 들 수 있는데 1)측정 수행자의 잦은 교체 등에 따른 조사역량 부족, 2)수행자별 유량측정 및 분석방법 상이, 3)장비의 유속검정 등 관리미흡 및 성능 저하, 4)유량측정 상당시간 경과후 유량측정성과 정리로 오류 수정 곤란, 5)유량측정성과의 체계적인 관리 미흡 등이다. 이러한 문제점을 개선하고 현장에서의 유량측정 신뢰도를 향상시키기 위하여 (주)웹솔루스에서는 한국수자원공사의 용역을 통해 현장의 유량 측정 결과를 PDA를 이용하여 기록하고 이를 실시간으로 중앙의 서버로 전송하여 과거 자료의 분석을 통해 측정자료의 신뢰도를 검증함으로써 신뢰성 있는 유량측정자료를 측정하도록 지원하는 유량측정 신뢰도 향상 시스템을 개발하였고, 한국수자원공사와 공동으로 두개의 특허출원을 하였다(특허출원: 10-2002-0049188, 10-2005-11550). 현재 이 시스템은 2002년 8월 착수를 시작으로 9개월이 지난 2003년 3월에 시험판의 개발을 완료하고, 용담댐 유역의 주천교 등 5개 지점에 시험 적용하면서 많은 개선과 보완을 거쳐 2005년 현재에는 한국수자원공사에서 운영하고 있는 13개의 댐과 1개의 국가하천에 대하여 총 59개의 관측지점에서 활용되고 있으며, 현재(2005. 2월 기준)까지 1,660여건 이상의 전자야장이 데이터베이스에 구축되었으며, 유량측정성과 DB는 웹시스템(http://river.kowaco.or.kr)을 통해 운영되고 있다. 본 시스템 도입을 통해 유량측정성과가 체계적으로 관리되고 있으며, 향후 시스템에 대한 지속적인 유지관리가 이루어진다면 오랜기간에 걸쳐 축적된 많은 양의 유량자료는 수자원관리에 큰 역할을 수행할 수 있을것으로 판단된다. 개발계획 및 유역의 특성 등을 조사하고, 시험유역의 선정기준을 수립하여 연구의 목적과 부합되는 지구를 시험유역으로 선정하였으며 선정된 시험유역에 대하여 수문$\cdot$수질 조사 계획을 수립하고, 계측시설을 설치하여 시험운영을 실시하고, 향후 시험유역의 수문계측 및 관리방안을 수립하고자 한다.1종이었다. 이 중 한국 고유종은 11종이었고, 외래 어종은 검정우럭과 2종이 조사되었으며, Zacco platypus(피라미), Zacco temmincki(갈겨니), Acheilongnathus koreanus(칼납자루), Odontobutis platycephala(동사리), Coreoleuciscus splendidus(쉬리) 순으로 분포하고 있었고, Acheilognathus signifer(묵납자루)는 댐 건설 전에는 많이 분포하였으나 현장조사에서 서식을 확인 할 수 언어 개체수의 큰 감소내지 멸종된 것으로 추정되었다.에서 동시에 시행하였다. 수술 후 1년 내 시행한 심초음파에서 모든 환아에서 단지 경등도 이하의 승모판 폐쇄 부전 소견을 보였다. 수술 후 조기 사망은 없었으며, 합병증으로는 유미흉이 한 명에서 있었다. 술 후 10개월째 허혈성 확장성 심근증이 호전되지 않아 Dor 술식을 시행한 후 사망한 예를 제외한 나머지 6명은 특이 증상 없이 정상 생활 중이다 결론: 좌관상동맥 페동맥이상 기시증은 드물기는 하나, 영유아기에 심근경색 및 허혈성 심근증 또는 선천성 승모판 폐쇄 부전등을 초래하는 심각한 선천성 심질환이다. 그러나 진단 즉시 직접 좌관상동맥-대동맥 이식술로 수술적 교정을 해줌으로써 좋은 성적을 기대할 수 있음을 보여주었다.특히 교사들이 중요하게 인식하는 해방적 행동에 대한 목표를 강조하여 적용할 필요가 있음을 시사하고 있다.교하여 유의한 차이가 관찰되지 않았다. 또한 HSP 환자군에서도 $IL1RN^{*}2$ allele 빈도와 carria

  • PDF

Guideline for Web 2.0 Cluster based Process and Performance Management System (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 구축에 따른 운영방안 제시)

  • Ong, Ho-Kyoung;Ahn, Jae-Gyu;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.899-904
    • /
    • 2007
  • Process management techniques are highly important in the construction industry. However, indicators or details of assessment which will show process management and its performance are still very insufficient. In particular, it is true that local corporations or small and medium sized companies suffer more difficulties than ones in metropolitan areas. Therefore, it is necessary to prepare a flexible process management and performance assessment system suited to field situations. This study identified problems of local small and medium sized companies, implemented a process and performance management system using the Lean concept, and systemized a web-based system. Also, the study proposed operational strategies so that small and medium construction companies may access and use the system easily. This will ensure the competitiveness of local small and medium sized companies, will pursue visible outcomes such as construction period reduction and construction cost reduction, and will be utilized as data related to performance assessment both during construction progress and after construction.

  • PDF

BSC 기반의 경영성과 관리시스템 구현 : 에너지 기업 적용사례

  • 장길상;박남일
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2004.11a
    • /
    • pp.175-181
    • /
    • 2004
  • 최근 많은 기업들의 경영층 및 정보화 담당자들이 BSC의 도입 필요성을 인식하기 시작하고 있다. 그러나 아직까지 최고경영층의 관심 및 지원 부족, 경영층 요구정보 분석의 어려움 및 낮은 질의 정보 제공, 적절한 BSC 개발 기술의 선정 실패 등으로 많은 기업에서 BSC 도입에 실패하고 있는 실정이다. 본 논문에서는 과거 전통적 경영성과측정 방법의 한계점과 BSC 모델의 장점 및 단점을 분석하고, 이를 토대로 성공적인 BSC 기반 경영성과관리시스템을 구축할 수 있는 구축방법론을 제시하고자 한다. 본 논문에서 제시하는 BSC 기반 경영성과관리시스템의 구축 방법론은 (1) 전사 비전/전략 수립, (2) 경영방침/사업계획 수립, (3) 핵심성과요인(CSF) 및 주요성과지표(KPI) 도출, (4) 시스템 구현 단계의 4단계로 각성되어 있다. 본 논문에서 제시된 BSC 기반 경영성과관리 시스템의 구축 방법론의 유효성(Usefulness)을 입증하기 위하여 에너지 기업인 'K'사를 대상으로 사례연구를 수행하였다.

  • PDF