• Title/Summary/Keyword: 서울 도시철도

Search Result 176, Processing Time 0.057 seconds

Factors Related to Daytime Sleepiness and the Effects of Night Work and Aromatherapy on the Autonomic Nervous System: Targeting an Urban Railway Crew (주간졸음에 관련된 요인과 야간근무와 아로마테라피가 자율신경계에 미치는 영향: 도시철도승무원 대상)

  • Lee, Hyun-Woong;Kim, Si-Gon;Lim, Kwang-Kyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.729-740
    • /
    • 2022
  • This study analyzed the effects of job stress and sleep disorders on sleepiness during the daytime for a night-shift urban railway crew. As a result of the analysis, measurements on a daytime sleepiness index were higher for the crew than those during other working hours, indicating that the degrees of sleepiness and drowsiness were severe. Afterwards, aromatic essential oils, which are generally known to help relieve sleep disorders and stress, were utilized to verify the effect on stress on night-shift workers. The experimental group treated with aromatherapy was found to show improved stress reduction and overall activity levels in the autonomic nervous system compared to an untreated control group. This study proves that night work by an urban railway crew negatively affects stress levels by increasing stress and negatively affects the autonomous nervous system, also showing that an aromatherapy treatment can be a good alternative to alleviate these conditions. The results of this study are expected to help prevent safety accidents by relieving the stress of nighttime workers.

Study on Accident Prediction Models in Urban Railway Casualty Accidents Using Logistic Regression Analysis Model (로지스틱회귀분석 모델을 활용한 도시철도 사상사고 사고예측모형 개발에 대한 연구)

  • Jin, Soo-Bong;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.4
    • /
    • pp.482-490
    • /
    • 2017
  • This study is a railway accident investigation statistic study with the purpose of prediction and classification of accident severity. Linear regression models have some difficulties in classifying accident severity, but a logistic regression model can be used to overcome the weaknesses of linear regression models. The logistic regression model is applied to escalator (E/S) accidents in all stations on 5~8 lines of the Seoul Metro, using data mining techniques such as logistic regression analysis. The forecasting variables of E/S accidents in urban railway stations are considered, such as passenger age, drinking, overall situation, behavior, and handrail grip. In the overall accuracy analysis, the logistic regression accuracy is explained 76.7%. According to the results of this analysis, it has been confirmed that the accuracy and the level of significance of the logistic regression analysis make it a useful data mining technique to establish an accident severity prediction model for urban railway casualty accidents.

A Study on Improvement of Maintenance System for Timber Sleepers of Ballast-less track on Railway Bridge (무도상 강철도 교량상 목침목 유지관리체계 개선방안에 관한 연구)

  • Choi, Jung-Youl;Shin, Tae-Hyoung;Kim, Sang-Jin;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.1
    • /
    • pp.389-394
    • /
    • 2019
  • In case of damaged timber sleepers, maintenance is carried out according to the track inspection standard. However, it is difficult to detect the extent of damage on the bridge, and maintenance is depended on inspector's judgment. In this study, we propose to improve the evaluation criterion of timber sleepers for the ballast-less tracks on serviced urban railway bridge. The timber sleepers on railway bridge was classified according to degree of damage, and damage scores were calculated for each damage grade. Also we have improved the maintenance system of the timber sleepers through the history management system of the individual timber sleepers on railway bridge. As a results, it was judged that systematic management of timber sleepers could be possible during maintenance.

A Study on the Risk Assessment for Urban Railway Systems Using an Adaptive Neuro-Fuzzy Inference System(ANFIS) (적응형 뉴로-퍼지(ANFIS)를 이용한 도시철도 시스템 위험도 평가 연구)

  • Tak, Kil Hun;Koo, Jeong Seo
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.1
    • /
    • pp.78-87
    • /
    • 2022
  • In the risk assessment of urban railway systems, a hazard log is created by identifying hazards from accident and failure data. Then, based on a risk matrix, evaluators analyze the frequency and severity of the occurrence of the hazards, conduct the risk assessment, and then establish safety measures for the risk factors prior to risk control. However, because subjective judgments based on the evaluators' experiences affect the risk assessment results, a more objective and automated risk assessment system must be established. In this study, we propose a risk assessment model in which an adaptive neuro-fuzzy inference system (ANFIS), which is combined in artificial neural networks (ANN) and fuzzy inference system (FIS), is applied to the risk assessment of urban railway systems. The newly proposed model is more objective and automated, alleviating the limitations of risk assessments that use a risk matrix. In addition, the reliability of the model was verified by comparing the risk assessment results and risk control priorities between the newly proposed ANFIS-based risk assessment model and the risk assessment using a risk matrix. Results of the comparison indicate that a high level of accuracy was demonstrated in the risk assessment results of the proposed model, and uncertainty and subjectivity were mitigated in the risk control priority.

Assessment of the New Capacity and LOS of Transfer Facilities in the High-speed Railway Stations (고속철도역 환승시설 용량 및 서비스수준 산정 방안)

  • Kim, Jonghae;Kim, Sigon;Lee, Kyung-no
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.735-740
    • /
    • 2008
  • The Design manual for adjusting the capacity and LOS of facilities has been shared in urban railways and high-speed railway stations. However, the pattern of urban railways users and those of high-speed railway users are different from each other. For an example, the high-speed railway users tend to carry voluminous luggages and the transportation disadvantaged such as children and the elderlies. Accordingly, we see that the scale of facilities and the station itself should be constructed differently. The transfer facilities in the high-speed railway stations are classified widely into walking assisting facilities and convenient facilities. We invented the concept of PME (Pedestrian Moving Equivalent) and PWE (Pedestrian Waiting Equivalent)for the spatial calculation of those who are with wheeled luggages, back packs, and children to reflect the uniqueness of users in high-speed railway stations. These equivalents have been applied to the design of the facilities to asses the new Capacity and LOS that are users' favored.

Analyzing the Productivity of Korean Rail Transit Authorities: A Nonparametric Malmquist Approach (한국 도시철도 운영기관의 생산성 : 비모수적 Malmquist 접근법에 의한 분석)

  • Kim, Min-Jung;Kim, Sung-Soo
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.6
    • /
    • pp.35-47
    • /
    • 2004
  • Using data envelopment analysis, this paper annually estimates Malmquist total factor productivity indices and decomposes them into productive efficiency change, technical change, and scale change components for three publicly-owned rail transit properties: the Seoul Subway Corporation(SSC), the Seoul Metropolitan Electrified Railways Sector of Korea National Railroad (SMESRS) and the Busan Urban Transit Authority (BUTA). The paper then conceptualizes that the property produces a single output(car-kilometers) using four inputs(labor, electricity, car and maintenance, and track) and uses unbalanced panel data consisted of annual observations on SSC, SMESRS and BUTA. The results show that the average annual growth rate of productivity of the three properties is 6.6 percent, which is 0.5 percent less than the average annual increasing rate of their labor price. They also show that the greatest part of the growth in productivity is explained by technical change and to a lesser degree by scale change and changes in productive efficiency though each of the three components contributes more than 20 percent to the growth in productivity, These results suggest that the three properties should base the increasing rate of their wages on the growth rate of their productivity and utilize existing technologies more efficiently prior to introducing new ones to raise their productivity, and that all the three components should be considered to evaluate their productivity more correctly.

Damage Status of Turnout System with Wooden Sleeper of Concrete Track on Urban Transit (도시철도 콘크리트궤도 목침목 분기기의 손상현황)

  • Choi, Jung-Youl;Han, Kyung-Sung;Bong, Jae-Gun;Jang, Cheol-Ju;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.379-385
    • /
    • 2019
  • The purpose of this study is to investigate the damage status of wood sleepers on concrete track of urban transit at different locations and to analyze the causes of damages. In addition, the turnout maintenance history during the service period of about 24 years was analyzed in conjunction with the train passing tonnage and that was to compare the current repair history. The most frequent damage components were rail, tie plate, spike and wooden sleeper. And, the damage caused by the defect of the rail fastening system such as spike and tie plate according to the deformation of the wooden sleeper was analyzed as the main type of damage. As a result, the damage of track components of turnout system was on the increase because they are directly affected by the train passing tonnage. The supplementary points of the check sheet for current turnout maintenance were derived and the improvement proposal was suggested based on the research results.

Renovation plans of operation field of Seoul Metro Line 9 (서울 도시철도 9호선의 운영분야 혁신방안)

  • Han, Woo-Jin;Park, Jeong-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1441-1446
    • /
    • 2008
  • Seoul Metro Line 9 (SML9) is the first subway line that private capital invests in Korea. SML9 will cross Seoul, linking the Gimpo Airport to the Gangnam district (25.5km) opening in the first half of 2009. SML9 has a new model in Korea constructed by metropolitan government and private company and operated by specialized public transportation service provider. SML9 is confronted with tough environment of stagnated public transportation and strong competitor, Olympic city expressway. And SML9 is under pressure for showing high efficiency as non-governmental organization from both customers and government. Consequently SML9 must lead the maximum efficiency by using its material and human resource. It is necessary that SML9 raise a competitive power and display its ability in active collaboration with relative organization and company. Hereupon, I propose renovation plans from viewpoint of operation field of SML9, (1) efficient train scheduling regime focusing on the combination of express and local train (2) close connection of other mean of transportation and (3) effective connection convention with Airport Railroad (AREX) as the line connected directly.

  • PDF

Railway Undercrossing Construction Method for the Shindorim Station Platform Extension (신도림 역사 확장을 위한 철도횡단 건설공법 검토)

  • Yoo, Je-Nam;Koo, Ja-Kap;Lee, Hee-Yung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.887-890
    • /
    • 2008
  • Shindorim Station is the most important transfer station which is crossed Seoul Metro Line-2 and national rail traffic Kyungbu, Honam and Kyungin Line etc.. There is the lagest transfer passengers and the greatest rail traffic. Therefore to solve the congeted station problem, Shindorim station extension project has been planned. This project has very difficult many problems. One of them is undercrossing the national rail traffic ground without open-cut excavation. There are many undercrossing construction methods in our country. But this project is required the best safety. So the best applicable methods are investigated, which are Front-Jacking, NTR and TRcM. In Design stage Front-Jacking with PRS method which is gound reinforcing is applied.

  • PDF

A Development of Optimum Operation Models for Express-Rail Systems (급행열차 도입을 통한 최적운행방안 수립에 관한 연구 - 수도권 광역 도시철도를 중심으로 -)

  • Park, Jeong-Soo;Lee, Hoon-Hee;Won, Jai-Mu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.679-686
    • /
    • 2006
  • Recently, the city railway in the Seoul Metropolitan Area (SMA) has offered a low quality of service as a passage time, because it was operated slowly. So, the people who live in modern society are not satisfied about passage time, therefore, this study tried to make that the subway in the SMA becomes a more functional and effective wide-area-transportation-network through an express train introduction's method which examined cases from abroad and current system. and then presented how express train could be applied to current system. In a case study, We used the An-San Line and Su-In Line as a examples and developed a schedule which can minimize the delaying time of subway by using Branch & Bound Algorithm. The train operational plan was loaded to consider a railroad siding, Obtained site, and the dispatch interval(three to ten minutes) for the express and local lines and finally, We presented an alternative operational plan which made by those factors.