• Title/Summary/Keyword: 사업수행 단계

Search Result 765, Processing Time 0.027 seconds

The Improvement of Work Structure in the Private Investment SOC Project (민자 SOC사업의 시공단계 업무체계 개선방향)

  • Kim Daejin;Shin Seungtae;Lee Younghwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.486-489
    • /
    • 2004
  • To enlarge the international competition and construction productivity, the domestic construction market attracts the private capital and expands the facility of :iocial Overhead Capital(SOC). However, the application of the business system used at the public project didn't utilize the effect of social overhead capital. It caused problems that parties' business was inefficient and their allotment of the risk was inadequate. This paper presents the course to reorganize the business system which the coincides with the origin aim of the SOC. For the reformation of the supervisor's work scope and business system and the government's overall project management, in other words, this paper proposes the professional organization to replace the superintendence and the formation of optimal business system. This paper confirms the privity of contract among parties of SOC project and parties' work scope and system between relative laws and concession agreement that government made a contract with Special purpose Company (SPC).

  • PDF

A Case Study of Construction Management for Pusan National University Children's Hospital (부산대학교 어린이병원 건립사업 CM 수행사례)

  • Yang, Jin-Kook;Ri, Min-Hyeon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.13-18
    • /
    • 2007
  • The construction by the ministry of health and welfare support of the first special hospital for only children in busan and gyeong-nam is under building with YPNUH(Yangsan Pusan National University Hospital) for the best medical treatment town and is to improve the productivity and efficiency by eliminating unproductive and inefficient fact through the construction management, systemic and scientific management technique. So in this study we would like to suggest the generated effect to apply project management technique to all stage such as from pre-design phase, turn-key enterprise choice, construction, design VE(Value Engineering), PMIS (Project Management Information System) construction to maintenance phase and cost and schedule reduction effect through basic, execution design VE by using engineer of field.

  • PDF

The Governance Models for Transforming Dual U-City Business Execution Structure (이원화된 U-City 사업 수행 체계 혁신을 위한 거버넌스 모델)

  • Kim, Dae-Young;Park, Kwang-Ho
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.18-23
    • /
    • 2009
  • 정부 주도적으로 전국적으로 U-City 구축이 확산되고 있으며 특히 신도시형 U-City 사업은 동탄 U-City가 완공됨에 따라 본격적인 운영단계에 접어들고 있다. 그러나 신도시형 U-City 사업은 이원화된 사업 수행 체계로 인한 많은 문제점들이 드러나고 있다. 본 논문에서는 U-City 사업의 가치사슬을 분석하여 문제점을 도출하고 이에 대한 해결방안으로서 U-City 거버넌스 모델을 제시하고 있다. U-City 거버넌스 모델은 구축뿐만 아니라 운영 단계까지 포함한 U-City 라이프사이클을 효율적이며 효과적으로 관리할 수 있는 조직 체계를 정의한다. 이와 같은 U-City 거버넌스 모델은 국내 U-City 사업뿐만 아니라 도시수출의 성과를 극대화 할 수 있는 기반을 제공할 것으로 기대된다.

  • PDF

Development of Construction Management Performance Checklists Using Analytic Hierarchy Process(AHP) (AHP 기법을 이용한 건설사업 단계별 CM업무 체크리스트 개발)

  • Lee, Tai-Sik;Jun, Young-Joon;Kim, Young-Min;Kwak, Doung-Koo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.342-346
    • /
    • 2006
  • As the construction industry gets specialized and complicated gradually, the number of participating organizations increased, and also the necessity of construction management(CM) is getting bigger because construction scale is becoming bigger. However, in spite of the increase in necessity, its activation through performance measurement and evaluation is very insufficient compared with advanced countries. Therefore, a checklist for CM by construction stage using AHP method in the current study is for efficient CM for successful completion of a project by dividing CM affairs by construction stage and checking performance degree by stage. If the CM checklist by construction stage, the final result of the study, is used by all the parties concerned such as construction managers, orders, designers, constructor, etc., it will be possibile to improve work efficiency of project management and produce a final outcome corresponding to the goals of a project.

  • PDF

A Study on Model Establishment of the Validity Evaluation for BTL Project Expenses Using an Analytic Hierarchy Process (계층분석법(AHP)을 이용한 BTL사업비 타당성 평가모형정립에 관한 연구)

  • Lee, Chun-Kyong;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.905-908
    • /
    • 2008
  • The BTL project, 4 years since its operation, has benchmarked the PFI Project in Japan and has been introduced. Given the evaluation step to select a preferred bidder, in a technological factor, the basic plans are corrected and complemented, whereas in a price factor, the low price bidding system is being enforced. There is concern that how to select preferred bidders and how to operate project costs during operation and management period may be problematic. Thus, in this study, using the Analytic Hierarchy Process, the method of deciding the pribrity to select preferred bidders in an early stage of the project and the evaluation model to evaluate the validity of BTL project expenses in process of project enforcement are established. Targeting the group. composed of experts who have experiences in the BTL project. Then, the levelling of evaluation factors and grouping have been carried out as following: LCC analysis and disbursement for government including two more detailed factors.

  • PDF

A Study on the Improvement of SOC Project Planning Process and Systems (국내 SOC 사업의 기획업무 개선에 관한 연구)

  • Shin Dongwoo;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.45-52
    • /
    • 2000
  • In Korea, demand for the Social Overhead Capital(SOC) projects has tremendously increased since 1970's and is expected to keep growing to support national economic development as well as to enhance the quality of life. In these projects, project planning and feasibility study phase is one of the most critical phases because it determines the success of later phases. However, we have experienced trial and errors repeatedly such as cost overruns and schedule delays in many of the SOC projects. These problems can be prevented or at least expected in the earlier phase and it requires well-developed and standardized project planning process and systems before design, procurement, and construction phases begin. Therefore, the purpose of this research is to investigate current problems in this phase and provide framework for a model for the project planning management which can be used for the SOC projects to insure the whole project success.

  • PDF

Safety Techniques-Based Improvement of Task Execution Process Followed by Execution Maturity-Based Risk Management in Precedent Research Stage of Defense R&D Programs (국방 선행연구단계에서 안전분석 기법에 기반한 수행프로세스의 개선 및 수행성숙도 평가를 활용한 위험 관리)

  • Choi, Se Keun;Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.89-100
    • /
    • 2018
  • The precedent study stage of defense programs is a project stage that is conducted to support the determination of an efficient acquisition method of the weapon system determined by the requirement. In this study, the FTA/FMEA technique was used in the safety analysis process to identify elements to be conducted in the precedent study stage and a methodology for deriving the key review elements through conceptualization and tailoring was suggested. To supplement the key elements derived from the existing research, it is necessary to analyze various events that may arise from key elements. To accomplish this, the HAZOP technique for safety analysis in other industrial fields was used to supplement the results of kdy element derivation. We analyzed and modeled the execution procedure by establishing input/output information and association with the key elements of the precedent study stage derived by linking HAZOP/FTA/FMEA techniques. In addition, performance maturity was evaluated for performance of precedent study, and a risk-based response manual was generated based on inter-working information with key elements with low maturity. Based on the results of this study, it is possible to meet the performance, cost, and schedule of the project implementation through application of the key elements and procedures and the risk management response manual in the precedent study stage of the defense program.

Working Design Management of the Design Build Projects Using CBR (CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안)

  • Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.432-437
    • /
    • 2002
  • As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.

  • PDF

A Study on the Analysis of Issue Items on Negotiation Stage of Build Transfer Lease Project (건축분야 임대형 민자사업 협상단계 쟁점 분석에 관한 연구)

  • Park, Yeong-Cheol;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.57-66
    • /
    • 2009
  • This study aimed to find major issues on negotiations of the BTL project, to analysis the degree, and to investigate the underlying cause and propose solutions. Data were collected from authorities in charge and the companies which have participated in BTL projects. Also, the weights of major issues were analyzed using Analytic Hierarchy Process method(AHP), which uses pair-wise comparison between variables, and the degree of them were listed in the quantitative way. As a result, 4 part had each 2 reasons and others had one reason among 6 negotiation parts of first step. In addition, the solutions were indicated.

A Business Planning Process Model to Develope Successful Housing Project (개발형 주택건설사업의 성공적 수행 위한 사업 기획 업무프로세스 모델 연구)

  • Park Chan Woo;Kim Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.245-250
    • /
    • 2001
  • Nowadays, there has been extreme competition due to market reduction in the domestic construction industry. In this situation, Korean construction companies are focused in the area of planning development housing project, which should maximize profit for a project. The most important step in this project is the business planning stage which judge whether it could come true or not. Each company has its own planning process model, but there hasn't been any standard model for the business planning process. To solve this problem in Korean construction companies, this study identifies the existing business planning process in the domestic construction companies finds out its problems, and suggests solutions for thorn. And Finally a business planning process model is proposed for success in development housing projects.

  • PDF